FIRST DEEP DIAMOND DRILL-HOLE CONFIRMS DEPTH
EXTENSIONS AT CANGALLO
Summary of visual observations: Assays pending
Highlights:
• Diamond drill-hole CANDD003 successfully completed to a depth of ~880m, confirming
substantial vertical extent of the mineralised porphyry system.
• Copper mineralisation logged from near surface (as copper oxides) to depths of ~550m,
where it occurs as hypogene sulphides (predominantly chalcopyrite with some bornite) in
stockwork veins.
• Diamond drill-rig moved to the northern area to test below higher-grade copper zones
(supergene mineralisation) reported from the RC drilling program.
• Assay results expected in 4 to 6 weeks.
AusQuest Limited (“AusQuest” or the “Company”) (ASX: AQD) is pleased to advise that the
first diamond drill-hole (CANDD003) in the current six-hole drilling program at the Company’s
100%-owned Cangallo Porphyry Copper-Gold Project (Cangallo) in Peru has been completed
confirming the vertical extent of the mineralised porphyry system to at least 800 metres.
The current diamond drilling program is designed to test for hypogene copper mineralisation
below the current depth limit (~350 metres) of Reverse Circulation (RC) drilling, and importantly
will also provide critical geological information that will help vector towards higher-grade copper
mineralisation that is interpreted to extend to depth.
Commenting on the diamond drilling program at Cangallo, AusQuest’s Managing Director,
Graeme Drew, said:
“We are very pleased with the visual observations from diamond drilling completed so far and
we look forward to receiving assays from this first drill-hole in the not-too-distant future.
“The first deep diamond hole in the south has confirmed that the system extends to depths in
excess of 550 metres below surface, with highly encouraging visual indications from the core
(see pages 2 to 4 of this announcement).
“Deep diamond drilling is expected to continue at Cangallo for the next few months and is
expected to provide critical information for assessing the scale and depth potential of the
Cangallo system, as well as its economic potential.
“We look forward to keeping shareholders updated on the results as they become available.”
2
Figure 1: Cangallo Prospect showing the location of the Stage 3 RC drill-holes with copper profiles plus
completed and planned diamond drill sites (surface rock-chip assays first reported in ASX releases – 30
March and 09 November 2023).
The first diamond drill-hole in the current program (CANDD003) is located within the southern
mineralised corridor and is the first diamond drill-hole to be completed in this area (Figure 1
and 2). Assay results are expected in approximately 4-6 weeks.
Copper mineralisation occurs in stockwork veins from near surface to approximately 550m
depth (Table 1), within a variable package of andesite and dacite volcanics intruded by quartz
diorite and tonalite dykes. Below 550m depth, the mineralised vein density appears to
decrease, but remains present at the end of hole, indicating a large vertically extensive
stockwork vein complex, consistent with interpretation of the Stage 3 RC drill results.
Copper oxides have been logged to depths exceeding 250m with a zone of chalcocite
observed from approximately 250m to 280m suggesting the presence of a supergene blanket
that may be developed above a potential significant sulphide system.
3
Figure 2: Cangallo South Prospect showing increased grade and thickness towards the south-east and
the location of diamond drill-hole CANDD003 (assays first released 4th March and 29th May 2026).
Below ~280 metres, drilling intersected chalcopyrite ± pyrite plus rare bornite and molybdenite
in stockwork veins and disseminations within the volcanic sequence, confirming the presence
of hypogene mineralisation below these depths.
The primary copper mineralisation is associated with extensive quartz–sericite/muscovite–
chlorite veining with several hydrothermal breccia zones also evident in the core, suggesting
multiple intrusive and mineralising events which is typical of a large mineralised porphyry
system (Figures 3 and 4).
The presence of chalcopyrite and bornite at depth indicates that the system remains open and
could potentially strengthen below the current drill coverage. Further drilling will be undertaken
in this area to understand the distribution and controls on copper mineralisation at these
depths, once assay results have been received and assessed.
The diamond drilling program has now shifted to the northern area, where interpretation of
results from RC and earlier diamond drilling (CANDD002) indicates the presence of hypogene
copper mineralisation to depths of at least 600 metres (down-hole). Multiple drill-holes in the
northern area finished in mineralisation, supporting the potential for additional hypogene
mineralisation at depth in this area.
Drill-hole CANDD004 has been sited to test below high copper grades reported from the earlier
RC drilling, and will help to determine the distribution and controls on hypogene mineralisation
in the northern area. Drilling of CANDD004 should be completed within the next 2 to 3 weeks.
4
.
Figure 3: Core photos from CANDD003 showing chalcopyrite-filled veins at 308m (LHS) – disseminated
chalcopyrite in porphyritic andesite host rock at 383m (centre); Muscovite-chlorite veins with K feldspar
selvages and chalcopyrite either disseminated or forming centrelines in the veins at 504m (RHS).
Figure 4: Core photos from CANDD003 showing breccias within the oxide zone with disseminated
chalcocite (black) at 134m (LHS) – Breccia within the sulphide zone showing potassic alteration, chlorite
muscovite veins with disseminated chalcopyrite at 382m (RHS).
“Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory
analyses where concentrations or grades are the factor of principal economic interest. Visual estimates
also potentially provide no information regarding impurities or deleterious physical properties relevant
to valuations.”
Graeme Drew
Managing Director Visit Investor Hub for further updates
5
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining
and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as a
Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in the report of
the matters based upon his information in the form and context in which it appears.
NO NEW INFORMATION
To the extent that this announcement contains references to prior exploration results which have been cross
referenced to previous market announcements made by the Company, unless explicitly stated, the Company
confirms that it is not aware of any new information or data that materially affects the information included in the
relevant market announcements.
FORWARD-LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on management’s
beliefs, opinions and estimates as of the dates the forward looking statements are made and no obligation is
assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect
other future developments
*Announcements to ASX for the Cangallo Project
2023 – 2026 Quarterly Activities and cashflow Reports
29/05/2026 Cangallo diamond drilling to commence
05/05/2026 Cangallo Porphyry Copper Continues Growing
25/03/2026 Major new drilling program commences at the Cangallo Copper-Gold Discovery, Peru
04/03/2026 Highly encouraging drill results continue to grow the Porphyry Cangallo Copper-Gold Project
11/02/2026 Cangallo delivers significant Cu extensions extending the porphyry discovery to over 1500m
06/01/2026 Diamond and RC drilling substantially expands scale of copper mineralization at Cangallo
02/12/2025 Stage 3 Drilling commences at the Cangallo Copper-Gold Discovery in Peru
13/11/2025 RC Drilling set to commence at Cangallo
12/11/2025 Diamond Drilling more than doubles depth extent of copper mineralisation at Cangallo
30/09/2025 Diamond Drilling Commences at Cangallo
28/08/2025 Cangallo Porphyry Copper Discovery continues to grow
21/07/2025 Cangallo Drilling Progress Report
12/06/2025 Drilling Commences at Cangallo
24/04/2025 Drilling set to commence at Cangallo
05/03/2025 Drilling to extend Cangallo Cu-Au discovery
06/02/2025 Cangallo Discovery Confirmed
23/01/2025 Significant Porphyry Copper Discovery at Cangallo
17/12/2024 Drilling commences at Cangallo in Peru
6
NB: Mineralisation intervals are not 100% continuous and within some intervals there is internal
dilution or breaks of 5-10m with minimal visual mineralisation.
“Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory
analyses where concentrations or grades are the factor of principal economic interest. Visual estimates
also potentially provide no information regarding impurities or deleterious physical properties relevant
to valuations.”
Table 1: Summary drill log of visual mineralisation
Drill-hole
From
(m)
To
(m)
Interval
(m)
Mineralisation
Modes
Oxide
Minerals
Oxide %
(Visual
estimate)
Sulphide
Minerals
Sulphide %
(Visual
Estimate)
CANDD003 35 250 215
fractures,
micro veinlets
& veins,
disseminated
Malachite,
Atacamtie,
Chrysocolla,
Goethite,
Haematite
0.1% to 0.5%
Including
120 215 95
fractures,
micro veinlets
disseminated
Chalcocite 0.1% to 1% pyrite 0.05% to 1%
CANDD003 250 300 40
fractures,
micro veinlets
disseminated
Chalcocite 0.1% to 0.2%
CANDD003 300 360 60
fractures,
micro veinlets
& veins,
disseminated
Chalcopyrite
Bornite
pyrite
0.1% to1%
0.1%
1% to 5%
Including 325 345 20
fractures,
micro veinlets
disseminated
Chalcocite 0.1% pyrite 1% to 5%
CANDD003 360 400 40
fractures,
micro veinlets
& veins,
disseminated
Chalcopyrite
pyrite
0.1% to 1%
1% to 5%
CANDD003 440 520 80
micro veinlets
& veins
Chalcopyrite
Molybdenite
Pyrite
0.1% to 1.5%
0.05% to 0.1%
1% to 5%
CANDD003 600 660 60
Veins &
disseminated
Chalcopyrite
Molybdenite
Pyrite
0.2% to 1%
0.05% to 0.1%
0.5% to 2%
CANDD003 700 880 180
Veinlets &
disseminated
Chalcopyrite
Molybdenite
pyrite
0.05% to 0.2%
0.05% to 0.1%
0.5% to 2%
1
JORC Code, 2012 Edition – Table 1 report, Diamond Drilling at Cangallo in Peru
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public Report.
• In cases where ‘industry standard’ work has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• The entire cored hole will be sampled (except for
Quaternary cover sequence). Composite samples are
being collected over 2 metre intervals
• Core is cut in half with half sent for analysis and half
retained for geological and quality control purposes
• Sample intervals are measured by tape from depth
intervals shown on core blocks labeled by the drillers, as
per standard industry practice.
Drilling techniques • Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
• Diamond Drilling to produce continuous core.
• HQ3 and NQ3 drill rods used to produce 60.1mm and
45.3mm diameter core respectively. The hole starts with
HQ core and changes to NQ at the appropriate depth
depending on drilling conditions.
• Down-hole surveys will be read at ~ 10m intervals using a
gyro downhole survey system.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and results
assessed.
• Measures taken to maximise sample recovery and ensure representative nature of the
samples.
• Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
• Core recovery is determined by comparing core lengths
measured against drilled intervals shown on core blocks
and recorded on the logs.
• Experienced diamond drillers are engaged to ensure
maximum core recovery.
• Sample recovery is expected to be high negating any
sample bias due to recovery.
Logging • Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Drill core and sample chips are logged by experienced
geologists to identify key rock types, alteration and
mineralisation styles.
2
Criteria JORC Code explanation Commentary
• Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant intersections logged.
• Core logging is qualitative with visual estimates of
mineralisation made for later comparison with assay
results.
• All core will be oriented using Core master system to
enable structural measurements to be made on veins,
fractures and dykes where appropriate.
• All structural elements of the core are logged by a
geotechnician and Alpha and Beta angles are recorded
with a Kenometer. These are then entered into the
structural data base
• All core will be logged and photographed wet and dry.
Sub-sampling
techniques and
sample preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material being sampled.
• Samples are collected by cutting the core in half along its
length and sampling over 2 metre intervals. In sections
where core cannot be cut, representative core chips are
collected for assay.
• Duplicate samples are collected from the core every 113th
sample for quality control. The duplicated sample is from
the same length and a quarter of the core is used as the
original sample with 30% of the core used as the original
and 30% used as the “duplicate”. 40% is retained in the
core box.
• The sample sizes are appropriate for the geological
materials being sampled.
• Specific Gravity readings are collected every10 metres
and in changes of lithology. Readings are collected from a
10cm cut length of whole core that is measured in
calibrated beaker for water displacement
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and
precision have been established.
• Assaying of the drill samples will be by standard industry
practice.
• The samples are sorted, dried, crushed then split to obtain
a representative sub-sample which is then pulverized.
• A portion of the pulverized sample is digested using a
four acid digest (Hydrofluoric, Nitric, Hydrochloric and
Perchloric) which approximates a total digest for most
elements. Some refractory minerals are not completely
dissolved.
3
Criteria JORC Code explanation Commentary
• Inductively Coupled Plasma Mass Spectroscopy (ICP-
MS) will be used to measure Ag, Al, As, Ba, Be, Bi, Ca,
Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg,
Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr,
Ta, Te, Th, Ti Tl, U, V, W, Y, Zn, Zr,
• Au assays will be provided by 30g fire assay with AA
finish.
• Every 2 metre composite sample is also submitted for
Hyperspectral analysis using a TerraSpec instrument and
uploaded into the aiSIRISTM
software for mineral
identification and spectral output.
• Assays are provided by ALS del Peru in Lima which is a
certified laboratory for mineral analyses. Analytical data
is transferred to the company via email.
• Data from the laboratory’s internal quality procedures
(standards, repeats and blanks) are provided to check data
quality.
• The Company has a QA/QC system allocated randomly to
a percentage of every 100 samples with the following
ratios: duplicate samples 6% (~ every 15), coarse blanks
3% basis (~every 30), fine blanks 3%, and ore standards
3%.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• N/A for this report.
• All primary sample data will be recorded onto a printed
sheet on site and uploaded to a site laptop, all geological
data is recorded at the logging area on a site laptop and
downloaded daily onto an external backup.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill hole collars including elevation are located by hand
held GPS to an accuracy of approximately 5m.
• Collars are then located on completion of the program
with centimetre scale precision using a differential GPS
system calibrated to the on-site registered surveyed datum
points.
• Down hole surveys on angled holes are carried out every
10m down hole, and at the end of the hole.
• All surface location data are in WGS 84 datum, UTM
4
Criteria JORC Code explanation Commentary
zone 18S.
• Two registered surveyed datum points have been
established at site and these points are registered in the
Peruvian national grid system by a registered survey
group GEOM
Data spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Diamond drill-holes will be positioned to test for
hypogene mineralization beneath previous RC drill-holes.
No systematic diamond drilling is being undertaken.
Orientation of data
in relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
• Any bias due to the orientation of the drilling is unknown
at this early stage of exploration.
Sample security • The measures taken to ensure sample security. • Sample security is managed by the operator of the Project.
Procedures match with Industry best practice.
• Samples are collected into securely tied bags and placed
into cable-tied plastic bags for transport to the laboratory.
Each sample batch has a sample submission sheet that
lists the sample numbers and the work required to be done
on each sample.
• Samples will be transported to the laboratory by company
vehicle using trusted company personnel.
• Sample pulps (after assay) are held by the laboratory and
returned to the company after 90 days.
Audits or reviews • The results of any audits or reviews of sampling techniques and data. • No reviews or audits of the sampling techniques or data
have been carried out to date.
5
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
• The Cangallo project is located approximately 25 km
east of the town of Chala in the south of Peru.
• The Cangallo project comprises 14 granted mineral
concessions. The tenements are held by Questdor which
is a 100% subsidiary of AusQuest Limited.
• There are no major heritage issues to prevent access to
the tenements. A drill permit (FTA) has been provided
by INGEMMET for the drilling program following
environmental, and community approvals.
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties. • No historic exploration data is available.
Geology • Deposit type, geological setting and style of mineralisation. • The Cangallo project is targeting Porphyry deposits
along the coastal belt of southern Peru. These are large
scale disseminated copper (and gold) deposits found
within orogenic belts that surround the Pacific Rim. The
deposits can be really large requiring significant drilling
to evaluate.
Drill hole
Information
• A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
• All relevant drill hole data and information for the first
two diamond drill-holes are provided below.
• Subsequent drill-hole details are unknown at this stage as
they will be dependent on ongoing assessment of data,
including results from the first diamond drill-hole, and
will be included in future reporting.
Data aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Aggregate assay intervals for the diamond drill-holes
will be based on copper assays, using a cut-off value of
~0.1% Cu, and maximum internal waste of 6 metres.
6
Criteria JORC Code explanation Commentary
• Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be clearly
stated.
• For higher grade intervals (quoted as including) a 0.3%
Cu cut-off and a 6m internal waste limit will be used.
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly important in the reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).
• All intervals reported are down-hole lengths. True widths
are unknown at this stage.
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
• All drill holes are shown on appropriate plans and
included in the ASX release.
Balanced reporting • Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
• At this early stage of drilling, only significant assay
results will be reported.
Other substantive
exploration data
• Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics; potential deleterious
or contaminating substances.
• The relationship between current drilling and previously
reported exploration data is shown in the ASX release.
Further work • The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
• The location of future diamond drill-holes will be
dependent on results from the diamond drilling program
as well as interpretation of the RC drill results. These
will be provided in future reports.
DRILL HOLE LOCATIONS
Planned Hole
ID Easting Northing RL Azimuth Dip Depth (m)
CANDD003 603765 8244460 1158 150 -60 880
CANDD004 603880 8245260 1171 200 -80 800 planned
Projection: WGS84, Zone 18S