Premium Magnetite Product confirmed at Waterfall
Released
Released
Announcement PDF
Visit Investor Hub for a video update.
November 25th, 2024
PREMIUM MAGNETITE IRON PRODUCT (>70% Fe) CONFIRMED
ACROSS WATERFALL PROSPECT (WA)
Key Points:
•
Premium grade iron product (>70% Fe) has been produced across the Waterfall
Prospect by beneficiation test work using the Davis Tube Recovery (DTR) method.
•
Magnetite was liberated from its host rock using a relatively coarse grind size of
75um and 106um, which suggests potential savings on future processing costs.
•
Average DTR recoveries of approximately 34% indicate that most, if not all, of the
magnetite has been recovered in the concentrate.
•
Impurity levels (silica, alumina, sulphur and phosphorus) within the magnetite
concentrate are extremely low.
•
The Morrisey Project is well located, being ~120km by road north of Mullewa and
then ~80km by rail to the Port of Geraldton.
•
Waterfall is the first of at least five targets identified within the Morrisey Project,
with potential to host magnetite mineralisation.
Next Steps:
•
Native Title clearance surveys over further magnetite targets are scheduled to be
completed later this year.
•
Drilling of additional targets is being planned for 2025, under the Strategic
Alliance Agreement with a subsidiary of South32 Limited.
Further to its previous ASX announcements (listed below), AusQuest Limited (ASX: AQD) is
pleased to advise that it has successfully produced a premium iron product grading >70% Fe
from DTR test work completed on samples from 14 of the 16 drill-holes at the Waterfall
Prospect, part of its 100%-owned Morrisey Project in Western Australia’s Midwest mining
district.
Beneficiation test work using the DTR method confirmed excellent recoveries of magnetite
from its host rock (averaging ~34%) across the prospect, using coarse grind sizes of 106um
and 75um, highlighting potential for the prospect to deliver a premium iron (Fe) product with
very low impurity levels and enhancing the future commercial potential of the Project.
The Morrisey Project is well located, being ~120km by road north of the town of Mullewa, and
a further 80km by rail to the Port of Geraldton (Figure 1). No discussions have been held with
transport providers at this stage.
JOIN AUSQUEST’S INTERACTIVE INVESTOR HUB.
Visit AUSQUEST.COM.AU for AusQuest’s interactive Investor Hub
AusQuest Limited ABN 35 091 542 451 | 8 Kearns Crescent Ardross WA 6153
Figure 1: Morrisey Project: Location Plan showing road and rail access to the Port of Geraldton.
DTR results for all remaining drill-holes have now been received, confirming that iron (Fe)
grades greater than 70% Fe can be achieved from both the 75um and 106um grind sizes for
all the composite samples (varying from 4m to 12m in length). The distribution of DTR grades
and down-hole thicknesses for the 75um grind size is shown in Figure 2, with cross-sections
provided in Figures 3 and 4.
While there are no significant differences between results from the two grind sizes used,
results for 75um are slightly more consistent, with less variations than for the 106um data
(see Tables 1 and 2 below).
DTR Fe grades for the 75um grind size vary from 70.25% Fe to 71.63% Fe with recoveries
varying from 18.6% for the lower grade composite samples (<25% Fe) and up to 44.3% for
higher grade composites (>35%Fe), with an average recovery of magnetite across the
prospect of ~34%.
Deleterious elements for the 75um product were all very low, including silica (average 1.3%
SiO2), alumina (average 0.19% Al2O3), sulphur (average 0.08% S) and phosphorous
(average 0.004% P), only increasing slightly for the coarser grind product.
Petrological examination of selected samples indicates that the magnetite grains are highly
fractured, which is likely to contribute to the excellent magnetite recoveries achieved via the
DTR test work.
Similar magnetic and gravity anomalies to the Waterfall prospect occur at a number of
locations within the Morrisey Project. Five targets have been identified for drilling to help
determine the overall magnetite potential of the district.
2
Figure 2. Waterfall Prospect: Gravity image showing location of RC drill-holes & DTR product grades.
Figure 3. Waterfall Prospect: Section 1 showing down-hole magnetic susceptibility and Fe grades plus
DTR test results from the 75um grind size for composite down-hole samples
3
Figure 4. Waterfall Prospect: Section 3 showing down-hole magnetic susceptibility and Fe grades plus
DTR test results from the 75um grind size for composite down-hole samples.
AusQuest’s Managing Director, Graeme Drew, said the Company was very pleased with the
results of the beneficiation test work, which confirmed the Company’s belief that a coarse
grind size should be able to separate magnetite from the rest of the rock to produce a
consistent premium iron product (>70% Fe) from this prospect.
“We are now looking at testing other magnetite targets within the Morrisey Project to help us
assess the overall commercial potential of this Project,” he said.
“We have already organised for Native Title clearance surveys to be completed over another
five targets that look similar to Waterfall, so that we can commence further drill testing of the
area early in the New Year.
“The Board looks forward to providing further updates to shareholders on the Morrisey
Project as further results become available.”
Graeme Drew
Managing Director
Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of
Mining and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as
a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in
the report of the matters based upon his information in the form and context in which it appears
4
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on
management’s beliefs, opinions and estimates as of the dates the forward looking statements are made and no
obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should
change or to reflect other future developments.
*Historic Announcements to ASX re Morrisey Project:
18/09/2024
18/09/2024
23/07/2024
12/06/2024
15/05/2024
22/04/2024
26/03/2024
04/09/2023
24/01/2023
Update – DTR Produces Premium Grade Product (Fe) at Morrisey
DTR Produces Premium Grade Product (Fe) at Morrisey
Petrography Indicates Coarse Magnetite at Morrisey
Assays Confirm Magnetite Potential at Morrisey
Abundant Magnetite Intersected at Morrisey
Drilling Commences at Morrisey
AusQuest Gearing Up for Drilling At Morrisey
Further Drilling Planned at Morrisey
Morrisey Magnetite Project Upgraded
5
Table 1: Davis Tube Recovery Test results for 75um grind size
Intersection
Drill-Hole
22MYRC001
24MYRC004
24MYRC005
24MYRC006
24MYRC007
24MYRC008
24MYRC009
24MYRC010
24MYRC011
24MYRC015
24MYRC018
24MYRC019
24MYRC020
24MYRC021
From
(m)
102
64
118
128
188
50
198
50
162
84
42
48
198
46
108
136
110
156
54
78
120
38
42
72
40
86
84
186
To
(m)
144
108
122
160
202
144
208
96
182
162
96
164
214
86
128
148
116
204
62
94
128
66
52
80
60
134
90
202
Interval
(m)
42
44
4
32
14
94
10
46
20
78
54
116
16
40
20
12
6
48
8
16
8
28
10
8
20
48
6
16
Assay
Fe %
33.43
30.80
22.54
26.52
23.05
26.82
29.32
30.51
28.06
32.63
30.95
29.76
31.73
27.40
35.49
34.09
34.89
30.42
31.77
27.57
31.88
32.07
33.89
26.76
25.04
30.67
28.81
26.36
75um DTR Concentrate Grades
Recovery
%
41.15
37.33
28.34
32.66
18.58
28.46
39.11
36.22
32.69
36.87
37.10
29.83
38.98
28.85
44.32
43.52
43.30
36.92
30.82
31.20
38.46
35.62
39.25
20.38
27.58
33.36
29.12
27.63
Fe %
71.10
71.08
70.71
70.80
71.03
71.10
71.16
71.11
71.48
70.62
71.22
70.99
71.43
71.07
71.48
71.59
71.21
71.11
70.94
70.51
70.85
70.37
71.63
70.25
71.12
71.28
70.97
70.90
SiO2
%
1.44
1.38
1.69
1.90
1.25
1.31
1.00
1.30
0.84
1.63
1.33
1.24
0.74
1.23
0.82
0.79
0.95
1.31
1.43
2.10
1.11
1.85
0.68
1.31
1.24
0.75
0.82
1.39
Al2O3
%
0.088
0.115
0.190
0.206
0.306
0.189
0.160
0.147
0.240
0.183
0.098
0.270
0.165
0.278
0.130
0.160
0.140
0.114
0.120
0.115
0.200
0.194
0.200
0.500
0.230
0.275
0.430
0.280
S%
P%
0.006
0.007
0.002
0.014
0.044
0.101
1.187
0.008
0.063
0.393
0.010
0.070
0.005
0.013
0.006
0.012
0.040
0.005
0.006
0.006
0.012
0.009
0.016
0.026
0.004
0.064
0.018
0.044
0.002
0.002
0.002
0.006
0.004
0.004
0.004
0.004
0.004
0.003
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.005
0.005
0.006
0.005
0.004
0.004
0.004
0.004
0.003
0.004
Table 2: Davis Tube Recovery Test results for 106um grind size
Intersection
Drill-Hole
22MYRC001
24MYRC004
24MYRC005
From
(m)
102
64
118
128
188
50
198
To
(m)
144
108
122
160
202
144
208
Interval
(m)
42
44
4
32
14
94
10
Assay
Fe %
33.28
30.80
22.41
26.44
22.79
26.64
30.29
106um DTR Concentrate Grades
Recovery
%
42.20
37.86
28.15
32.94
19.15
29.11
37.09
Fe %
69.94
70.35
70.75
69.80
70.95
70.58
70.08
SiO2
%
2.84
2.31
1.47
3.04
1.41
1.92
1.76
Al2O3
%
0.057
0.110
0.130
0.186
0.303
0.189
0.160
S%
P%
0.006
0.008
0.002
0.017
0.049
0.089
1.074
0.003
0.004
0.002
0.007
0.004
0.005
0.005
6
24MYRC006
24MYRC007
24MYRC008
24MYRC009
24MYRC010
24MYRC011
24MYRC015
24MYRC018
24MYRC019
24MYRC020
24MYRC021
50
162
84
42
48
198
46
108
136
110
156
54
78
120
38
42
72
40
86
84
186
96
182
162
96
164
214
86
128
148
116
204
62
94
128
66
52
80
60
134
90
202
46
20
78
54
116
16
40
20
12
6
48
8
16
8
28
10
8
20
48
6
16
31.31
28.34
32.07
31.07
29.86
31.62
32.00
26.21
33.86
34.65
30.11
21.23
26.91
32.07
31.67
32.45
27.27
24.47
30.30
27.61
27.09
36.79
32.43
36.38
38.49
31.00
38.53
34.53
31.24
41.43
43.51
35.04
22.66
32.06
38.14
37.39
37.80
21.15
28.40
33.62
30.44
28.04
70.64
71.51
70.07
70.09
70.58
71.23
70.52
71.35
71.41
70.63
70.24
67.12
68.69
70.56
69.68
71.43
71.47
70.53
71.38
71.27
70.66
1.93
0.80
2.26
2.47
1.79
0.80
1.74
1.31
0.82
1.53
2.45
1.91
4.28
1.21
3.00
0.53
0.70
1.67
0.84
0.62
1.63
0.146
0.220
0.184
0.111
0.258
0.160
0.238
0.180
0.155
0.150
0.123
0.890
0.115
0.180
0.197
0.190
0.470
0.215
0.270
0.420
0.270
0.008
0.080
0.330
0.004
0.073
0.005
0.007
0.016
0.010
0.040
0.005
0.693
0.006
0.011
0.009
0.014
0.030
0.004
0.053
0.018
0.038
0.004
0.005
0.004
0.006
0.005
0.004
0.005
0.006
0.006
0.006
0.006
0.007
0.006
0.006
0.006
0.004
0.003
0.004
0.005
0.003
0.005
7
JORC Code, 2012 Edition – Table 1 Report: Davis Tube Recovery test for Magnetite
intersected in RC drilling at the Morrisey Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
•
•
•
•
•
•
•
RC drilling was used to obtain 1m split samples which were
composited over 2m using an onboard cone splitter.
Sample depths were determined by the length of the rod
string and confirmed by counting the number of samples
and rows as per standard industry practice.
Sample weight of each 2m composite sample submitted for
analysis was approximately 3kg.
The remainder of each 1m sample was collected in large
plastic sample bags and placed in rows at the drill site with
each sample representing a 1m interval.
Sampling for DTR tests comprised the collection of
consecutive 1m samples using a riffle splitter to provide
representative samples for compositing.
3-5 kg of sample was split from each 1m sample.
The 1m samples were aggregated into composite samples
at Intertek Laboratories by means of the following
procedure:
▪
▪
▪
▪
▪
1
Prepare constant mass composites of 2 kg as
described below.
Samples passed through a Boyd (or equivalent)
crusher to reduce top size to 2-3mm.
Weigh out 2000/n grams of each sample where n is the
number of samples in the composite - for example, if
there are 10 samples in the composite, each sample
will be 2000/10 = 200grams.
Mix the composites thoroughly by milling for 5 (five)
seconds in an LM5 mill.
Prepare a duplicate of two of the composites - to
confirm sample accuracy.
Criteria
JORC Code explanation
Commentary
▪
Drilling techniques
Drill sample
recovery
Logging
Sub-sampling
techniques and
sample preparation
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
2
Once composites are prepared, weigh out 150g for
106um and 75um DTR tests.
• Reverse circulation (RC) drilling with 4.5 inch face sampling bit.
• Experienced RC drillers and an appropriate rig size were used
to ensure maximum sample recovery.
• Sample quality and recovery was noted for each metre.
• At this early stage of exploration it is not possible to identify any
relationship between sample recovery and assay grade.
• RC sample chips were logged by an experienced geologist to
identify key rock types and mineralisation styles.
• Sample logging was qualitative with visual estimates of mineral
composition made for later comparison with assay results.
• All samples were logged.
• RC samples were collected every 1 metre and presented in
rows corresponding to sample depth.
• Assay samples were collected every 2m utilising a cone spltter
on the rig’s cyclone to produce a representative composite
sample for assay.
• Certified standards, blanks or field duplicates were inserted
every twentieth sample for initial quality control purposes.
• The sample sizes are considered appropriate for the geological
materials sampled.
• Assay results were reported in AusQuest ASX releases dated
12th June 2024 and 18th September 2024.
• Samples for DTR tests were based on Fe content (>20% Fe)
and magnetic susceptibility readings (generally >0.2SI units)
composited into 4m, 6m, 10m or 12m down hole intervals.
Criteria
Quality of assay
data and
laboratory tests
JORC Code explanation
•
•
•
Commentary
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision have
been established.
3
• The sample sizes are considered appropriate for the geological
materials sampled.
• Assaying of the drill samples is by standard industry practice.
For DTR Test work, the following procedure applies:
• Starting weight 150 g for each sample, preparation as
described in Section 1;
• Wet screen (75um), dry;
• Record weight oversize;
• Regrind oversize (4 sec for every 5g oversize)
• Repeat dry screen until < 5g oversize;
• Record weight;
• Split 20g P80/75um sample for DTR, with rest for (head
grade) assay;
• Conduct DTR recovery;
• Analyse separately DTR sample and P80/75 um (head
grade) sample - 24 element Li borate fusion/ XRF Fe,
Al2O3, As, BaO, CaO, Cl, Co, Cr2O3, Cu, K2O, MgO, MnO,
Na2O, Ni, P, Pb, S, SiO2, Sn, Sr, TiO2, V2O5, Zn, Zr.
DAVIS TUBE SPECIFICATIONS AS FOLLOWS:
• Pulveriser Bowl 150ml
• Sample mass 20g
• Stroke Frequency 60/min
• Stroke Length 50mm
• Magnetic field strength 3000Ga
• Tube Angle 45°
• Tube Diameter 40mm
• Water flow rate 450 to 490 ml/ minute
• Wash time 15 minutes
CONCENTRATE REMOVAL PROCESS:
• Stop the agitation
• Shut off the water
• Drain the water
• Weigh the concentrate beaker and place at tend of tube
• Switch off the magnet
• Flush the tube with DI water
• Dry beaker and weigh to get net concentrate weight
• Submit feeds and cons for XRF analysis.
Criteria
JORC Code explanation
Commentary
• Data from the laboratory’s internal quality procedures
(standards, repeats and blanks) are reviewed to check data
quality.
• Assays are provided by Intertek Genalysis, Maddington, WA
which is a certified laboratory for mineral analyses. Analytical
data is transferred to the company via email and by hard copy.
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
Orientation of data
in relation to
geological
structure
Sample security
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• No verification of intersections was undertaken.
• Sample details were compiled into Excel spreadsheets for
merging with assay data.
• Digital data is regularly backed-up on the company’s servers.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
• Drill holes were spaced ~ 150m x 100m apart along five grid
sections and drilled to depths of ~200m (see table below).
• Data spacing is considered sufficient to provide an indication of
geological and possibly grade continuity within the area drilled.
4
• Drill hole collar locations were established with a handheld GPS
to +/- 5m accuracy.
• Down hole surveys were carried out below the collar and at the
bottom of each hole using a multi-shot gyro system.
• Grid system used is GDA94 Zone 50S.
• Any bias due to the orientation of the drilling is unknown at this
early stage of exploration.
• Samples were collected in securely tied bags and placed into
cable-tied polywoven bags for transport to the assay laboratory,
accompanied by a sample submission sheet listing sample
numbers and required sample preparation and assay
procedures.
• Reputable companies are used to transport samples to the
laboratory.
Criteria
JORC Code explanation
Commentary
• Sample pulps (after assay) are held by the laboratory and
returned to the company if requested after 90 days.
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
• No audits or reviews have been carried out on the sampling.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
•
•
•
•
•
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties.
•
•
•
5
The Morrisey Project is located approximately 150 km northeast of Geraldton in Western Australia.
Tenement holdings consist of three granted Exploration
Licences E70/5383, E09/2397, and E59/2526 held 100% by
AusQuest.
The Morrisey Project is subject to a Strategic Alliance
Agreement whereby South32 have the right to earn a 70%
interest by spending US$4.5M.
The tenements are located partly within (WC2004/010) Wajarri
Yamatji #1Native Title Claim (partially determined) and partially
within (WC1996/093) Mullewa Wadjari Community Native Title
Claim.
Aboriginal heritage surveys are routinely completed ahead of
ground disturbing activities.
Previous exploration is very limited and was mainly focused on
iron ore and gold targets together with some regional diamond
exploration by Stockdale Prospecting and CRA Ltd.
Limited aircore drilling and surface lag sampling was reported
by several companies that were targeting magnetic anomalies
as possible iron ore or nickel prospects but no RC or diamond
drilling has been reported.
DetaiIed aeromagnetic data was acquired over the northern
half of EL 70/5383 and the southern part of EL 70/2397 as part
Criteria
JORC Code explanation
Commentary
of a search for iron ore. This data is being used by the current
exploration in the area
Geology
• Deposit type, geological setting and style of mineralisation.
•
•
Drill hole
Information
Data aggregation
methods
Relationship
between
mineralisation
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
6
The Morrisey Project is targeting coarse-grained magnetite
mineralization that can be beneficiated to produce a high grade
product (>70% Fe). The Narryer terrane is a complex structural
area containing high grade metamorphic rocks including
banded iron formations which appear to be the protoliths to the
mineralization being sought.
Nickel-copper-PGE mineralisation is also being targeted within
mafic/ultramafic intrusions in the Narryer Terrane which forms
the NW margin of the Yilgarn Craton.
• All relevant drill hole data are provided below.
• Intersections quoted in the ASX release of 12 June 2024 and
used to decide composite intervals for DTR test work, are
based on an Fe cut-off grade of 20%Fe, an average magnetic
susceptibility >0.2SI units, a minimum width of 4 metres and
maximum internal waste of 6 metres.
• Down hole lengths are reported - the relationship between
mineralization widths and intercept widths is not known at this
stage, although drill directions appear to provide a reasonable
Criteria
JORC Code explanation
widths and
intercept lengths
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Diagrams
Balanced reporting
Commentary
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Other substantive
exploration data
Further work
estimate of mineralization thickness.
• Drill holes locations are shown on an appropriate plan and in
the ASX release and tabulated below.
• Significant assay results are provided in the ASX release 12
June 2024 and 18th September 2024. The aggregation method
is described above. Magnetic susceptibility readings were
recorded using a magROCK susceptibility meter on every onemetre sample and averaged over two metre intervals to match
the sample interval. Magnetic susceptibility readings provide a
good indication of where magnetite occurs but not necessarily
Fe grade or % magnetite
• The area was selected for drilling based on modelled
electromagnetic targets in conjunction with geological,
geochemical magnetic and gravity interpretations by the
company.
• Proposals of further work will be made after a thorough analysis
of the current data is completed.
Drilling Details:
Hole_No
Prospect
Easting
Northing
RL
Datum
Zone
Azimuth
Inc
RC_Depth
22MYRC001
Waterfall
300
302
50
270
-60
246
Waterfall
6972580
6972503
GDA94
24MYRC004
370820
370741
GDA94
50
313
-59.7
225
7
24MYRC005
Waterfall
24MYRC006
Waterfall
24MYRC007
Waterfall
24MYRC008
Waterfall
24MYRC009
Waterfall
24MYRC010
Waterfall
24MYRC011
Waterfall
24MYRC015
Waterfall
24MYRC016
Waterfall
24MYRC017
Waterfall
24MYRC018
Waterfall
24MYRC019
Waterfall
24MYRC020
Waterfall
24MYRC021
Waterfall
370825
370647
370739
370549
370650
370531
370599
370647
370911
370471
370727
370361
370465
370650
6972448
6972383
6972323
6972254
6972206
6972159
6972102
6972555
6972397
6972302
6972153
6972001
6971969
6972205
298
309
301
313
304
309
306
307
294
311
298
305
303
304
GDA94
50
322
-60
225
GDA94
50
303.3
-58.8
225
GDA94
Share your feedback
Discover