ABUNDANT COARSE MAGNETITE INTERSECTED OVER
LARGE AREA AT THE MORRISEY PROJECT, WA
Key Points:
•
Significant magnetite intersected on all five sections drilled at Waterfall.
•
The host quartz-magnetite rock is coarse grained and occurs at shallow depths.
•
Next steps – assess assay results and initiate beneficiation test-work.
•
Program funded under Strategic Alliance Agreement.
AusQuest Limited (ASX: AQD) is pleased to advise that it has intersected abundant coarsegrained magnetite in recently completed follow-up drilling at the Morrissey Project, located
~120km north of Mullewa in the Midwest mining district of Western Australia.
Significant zones of magnetite (>1mm) were intersected in 14 of the 15 Reverse Circulation
(RC) drill-holes completed at the Waterfall Prospect. Down-hole thicknesses varied from 4
metres up to 117 metres, based on average magnetic susceptibility values greater than 0.25
SI units (see Table 1 below). Readings were taken at 1 metre intervals using a magROCK
Magnetic Susceptibility meter – no corrections have been applied to the data.
Quartz-magnetite rocks have now been intersected over a strike length of 750 metres, with
the mineralisation remaining open in all directions (Figure 1). The mineralisation appears to
have a relatively shallow easterly dip (~30 to 45°) and occurs at depths of less than 50
metres on many sections (Figures 2 and 3).
Figure 1. Magnetic and gravity images showing the location of RC drill-holes. Sections 1 and 3 are
presented as Figures 2 and 3 within this release.
JOIN AUSQUEST’S INTERACTIVE INVESTOR HUB.
Visit AUSQUEST.COM.AU for AusQuest’s interactive Investor Hub
AusQuest Limited ABN 35 091 542 451 | 8 Kearns Crescent Ardross WA 6153
The program at Waterfall was extended by seven RC drill-holes following encouragement
from the minimum drilling program (comprising eight drill-holes), which intersected magnetite
on every section tested (for a total of ~3,060m). The extra drill-holes were designed to test
the lateral extent of the magnetite and help determine the potential size of this occurrence.
Samples were composited on a two-metre basis and sent to Intertek Genalysis Laboratory
Services in Perth for analysis. Assay results should be available within 4 to 6 weeks.
Figure 2: Section 1 showing down-hole magnetic susceptibility readings on drill samples. Zones
shown in red have magnetic susceptibility values >0.4 SI units.
Figure 3: Section 3 showing down-hole magnetic susceptibility readings on drill samples. Zones
shown in red have magnetic susceptibility values >0.4 SI units.
2
The magnetic and gravity data which are being used to define the extent of the magnetite
suggest that additional drilling is required to close-off the mineralisation (Figure 1). Computer
modelling of this data, using the available drill intersections for control, has been initiated to
help define the outer limits of the mineralisation.
The discovery drill-hole (22MYRC001) at Waterfall, which was completed in late 2022,
intersected coarse-grained magnetite which subsequent test-work (Davis Tube Recovery
(DTR)) indicated could produce a premium grade product (>70% Fe) with very low impurities
(ASX release 24 January 2023). DTR test work on a selection of current drill samples will be
initiated once assay results have been received and assessed.
RC drilling completed at the Bilga South (one hole for 200m) and Toola (two holes for 400m)
Prospects to test magnetic and gravity anomalies approximately 40km from Waterfall,
intersected magnetite mineralisation but with a much finer grain-size, and within more mafic
host rocks, suggesting they are unlikely to be amenable to beneficiation. Two-metre
composite samples have been sent for analysis.
The Morrisey Project, which is located within high-grade metamorphic rocks of the Narryer
Terrane, approximately 120km north of Mullewa in WA, is subject to the Strategic Alliance
Agreement with a wholly-owned subsidiary of South32 Limited.
AusQuest’s Managing Director, Graeme Drew, said: “We are very encouraged by the drilling
results from Waterfall as it appears that the coarse-grained magnetite occurs in reasonably
thick units and at relatively shallow depths, suggesting it may be amenable to open-cut
mining methods if scale can be demonstrated.
“We need to wait for assay results and further beneficiation test-work before we can more
fully assess the results of this program, however, previous test-work on samples from our
initial drilling program indicated that the magnetite intersected could be upgraded to a
premium product (>70% Fe).
“Shareholders can look forward to more detailed assessments of the magnetite potential at
Morrisey over the coming weeks and months”.
Graeme Drew
Managing Director
Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of
Mining and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as
a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in
the report of the matters based upon his information in the form and context in which it appears.
3
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on
management’s beliefs, opinions and estimates as of the dates the forward looking statements are made and no
obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should
change or to reflect other future developments.
Table 1: RC Drill Intersections based on Magnetic Susceptibility Readings
Prospect
Waterfall
Waterfall
Waterfall
Drill-hole
24MYRC04
Easting
370741
Northing
6972503
24MYRC05
370825
6972448
24MYRC06
370647
6972383
From (m)
To (m)
Interval
Mag Suscept (SI)
63
160
97
0.39
187
201
14
0.28
48
152
104
0.40
198
206
8
0.70
52
96
44
0.60
162
182
20
0.47
Waterfall
24MYRC07
370739
6972323
76
162
86
0.53
Waterfall
24MYRC08
370549
6972254
41
97
56
0.62
169
173
4
0.46
48
165
117
0.49
198
215
17
0.58
44
85
41
0.47
Waterfall
Waterfall
Waterfall
Waterfall
24MYRC09
370650
6972206
24MYRC010
370531
6972159
24MYRC011
24MYRC015
370599
370911
6972102
6972397
102
128
26
0.62
136
148
12
0.74
105
120
15
0.36
151
212
61
0.48
53
61
8
0.40
78
96
18
0.44
119
129
10
0.46
Waterfall
24MYRC017
370471
6972302
152
156
4
0.49
Waterfall
24MYRC018
370727
6972153
39
65
26
0.57
Waterfall
24MYRC019
370361
6972001
41
52
11
0.55
67
80
13
0.30
84
90
6
0.27
109
112
3
0.34
40
60
20
0.44
85
140
55
0.46
83
90
7
0.44
186
204
18
0.43
Waterfall
Waterfall
24MYRC020
24MYRC021
370465
370650
6971969
6972205
4
JORC Code, 2012 Edition – Table 1 Report Reverse Circulation Drilling at the
Morrisey Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
• RC drilling was used to obtain 1m split samples which were
composited over 2m using an onboard cone splitter.
• Sample depths were determined by the length of the rod string
and confirmed by counting the number of samples and rows as
per standard industry practice.
• Sample weight of each 2m composite submitted for analysis
was approximated 3kg.
Drilling techniques
Drill sample
recovery
Logging
1
• Reverse circulation (RC) drilling with 4.5 inch face sampling bit.
• Experienced RC drillers and an appropriate rig size were used
to ensure maximum sample recovery.
• Sample quality and recovery was noted for each metre.
• At this early stage of exploration it is not possible to identify any
relationship between sample recovery and assay grade.
• RC sample chips were logged by an experienced geologist to
identify key rock types and mineralisation styles.
Criteria
Sub-sampling
techniques and
sample preparation
Quality of assay
data and
laboratory tests
JORC Code explanation
Commentary
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• Sample logging was qualitative with visual estimates of mineral
composition made for later comparison with assay results.
• All samples were logged.
•
•
•
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision have
been established.
2
• RC samples were collected every 1 metre and collected in
plastic bags and presented in rows corresponding to sample
depth.
• Assay samples were collected every 2m utilising a cone spltter
on the rig’s cyclone to produce a representative composite
sample for assay.
• Certified standards or blanks were inserted every twentieth
sample for initial quality control purposes.
• The sample sizes are considered appropriate for the geological
materials sampled.
• The sample sizes are considered appropriate for the geological
materials sampled.
• Assaying of the drill samples will be by standard industry
practice.
• The samples are sorted and dried and the whole sample is
crushed then split by riffle splitter to obtain a representative
sub-sample which is then pulverized in a vibrating pulveriser.
• A portion of the pulverized sample is then digested and refluxed
using a four acid digest (hydrofluoric, nitric, hydrochloric and
perchloric) which approximates a total digest for most elements.
Some refractory minerals are not completely dissolved.
• Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) is
used to measure Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs,
Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb,
Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn,
and Zr (48 element suite).
• Data from the laboratory’s internal quality procedures
(standards, repeats and blanks) and AusQuest (standards,
repeats and blanks) are reviewed to check data quality.
• Assays are provided by Intertek Genalysis, Maddington, WA
which is a certified laboratory for mineral analyses. Analytical
Criteria
JORC Code explanation
Commentary
data is transferred to the company via email and by hard copy.
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• No verification of intersections was undertaken. .
• Sample details were compiled into Excel spreadsheets for
merging with assay data.
• Digital data is regularly backed-up on the company’s servers.
• Drill holes were spaced ~ 150m x 100m apart along five grid
sections and drilled to depths of ~200m..
• Data spacing is considered sufficient to provide an indication of
geological and possibly grade continuity within the area drilled.
Sample security
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
• No audits or reviews have been carried out on the sampling.
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
Orientation of data
in relation to
geological
structure
3
• Drill hole collar locations were established with a handheld GPS
to +/- 5m accuracy.
• Down hole surveys were carried out below the collar and at the
bottom of each hole using a multi-shot gyro system.
• Grid system used is GDA94 Zone 50S.
• Any bias due to the orientation of the drilling is unknown at this
stage of exploration.
• Samples were collected in securely tied bags and placed into
cable-tied bulker bags for transport to the assay laboratory,
accompanied by a sample submission sheet listing sample
numbers and required sample preparation and assay
procedures.
• Reputable companies are used to transport samples to the
laboratory.
• Sample pulps (after assay) are held by the laboratory and
returned to the company after 90 days.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
•
•
•
•
•
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties.
•
•
•
Geology
• Deposit type, geological setting and style of mineralisation.
4
•
The Morrisey Project is located approximately 150 km northeast of Geraldton in Western Australia.
Tenement holdings consist of four granted Exploration
Licences E70/5383, E09/2397, E59/2525 and E59/2526 held
100% by AusQuest.
The Morrisey Project is subject to a Strategic Alliance
Agreement whereby South32 have the right to earn a 70%
interest by spending US$4.5M.
The tenements are located partly within (WC2004/010) Wajarri
Yamatji #1Native Title Claim (partially determined) and partially
within (WC1996/093) Mullewa Wadjari Community Native Title
Claim.
Aboriginal heritage surveys are routinely completed ahead of
ground disturbing activities.
Previous exploration is very limited and was mainly focused on
iron ore and gold targets together with some regional diamond
exploration by Stockdale Prospecting and CRA Ltd.
Limited aircore drilling and surface lag sampling was reported
by several companies that were targeting magnetic anomalies
as possible iron ore or nickel prospects but no RC or diamond
drilling has been 4 Criteria JORC Code explanation
Commentary reported.
DetaiIed aeromagnetic data was acquired over the northern
half of EL 70/5383 and the southern part of EL 70/2397 as part
of a search for iron ore. This data is being used by the current
exploration in the area
The Morrisey Project is targeting coarse-grained magnetite
mineralization that can be beneficiated to produce a high grade
product (>70% Fe). The Narryer terrane is a complex structural
area containing high grade metamorphic rocks including
Criteria
JORC Code explanation
Commentary
•
Drill hole
Information
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
5
banded iron formations which appear to be the protoliths to the
mineralization being sought.
Nickel-copper-PGE mineralisation is also being targeted within
mafic/ultramafic intrusions in the Narryer Terrane which forms
the NW margin of the Yilgarn Craton.
• All relevant drill hole data are provided below.
• No aggregation techniques have been used on the data.
• The relationship between mineralization widths and intercept
widths is not known at this stage, although drill directions
appear to provide a reasonable estimate of mineralization
thickness.
• Drill hole locations are shown on appropriate plans and
included in the ASX release.
Criteria
JORC Code explanation
Balanced reporting
Other substantive
exploration data
Further work
Commentary
drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
• Assay results are pending. Magnetic Susceptibility readings
provide a good indication of where magnetite occurs but not
necessarily Fe grade or % magnetite.
• The area was selected for drilling based on modelled magnetic
and gravity data in conjunction with geological and geochemical
interpretations by the company.
• Proposals of further work will be done after a thorough analysis
of the current data is completed.
Drilling Details:
Hole_No
Prospect
Easting
Northing
RL
Datum
Zone
Azimuth
Inc
RC_Depth
24MYRC004
Waterfall
313
-59.7
225
GDA94
50
322
-60
225
24MYRC006
Waterfall
GDA94
50
303.3
-58.8
225
24MYRC007
Waterfall
GDA94
50
301.06
-59.39
225
24MYRC008
Waterfall
GDA94
50
307
-59
228
24MYRC009
Waterfall
GDA94
50
302.8
-58.8
225
24MYRC010
Waterfall
GDA94
50
300.66
-59.28
228
24MYRC011
Waterfall
GDA94
50
299.22
-59.17
225
24MYRC012
Bilga South
GDA94
50
319.7
-59.2
228
24MYRC013
Toola Well
302
298
309
301
313
304
309
306
289
275
50
Waterfall
6972503
6972448
6972383
6972323
6972254
6972206
6972159
6972102
7013772
6989501
GDA94
24MYRC005
370741
370825
370647
370739
370549
370650
370531
370599
391773
400867
GDA94
50
87.51
-60.59
200
6
24MYRC014
Toola Well
24MYRC015
Waterfall
24MYRC016
Waterfall
24MYRC017
Waterfall
24MYRC018
Waterfall
24MYRC019
Waterfall
24MYRC020
Waterfall
24MYRC021
Waterfall
401349
370647
370911
370471
370727
370361
370465
370650
6989689
6972555
6972397
6972302
6972153
6972001
6971969
6972205
276
307
294
311
298
305
303
304
GDA94
50
273.4
-59.4
162
GDA94
50
303.4
-60.9
210
GDA94
50
301.99
-60.42
152
GDA94
50
305.5
-58.5
180
GDA94
50
301.7
-60.5
114
GDA94
50
306.3
-58.99
174
GDA94
50
295.14
-60.49
220
GDA94
50
239.7
-89.16
204
7