Cangallo Porphyry Copper continues to Grow
Released
Released
Announcement PDF
JOIN AUSQUEST’S INTERACTIVE INVESTOR HUB.
Visit AUSQUEST.COM.AU for AusQuest’s interactive Investor Hub
AusQuest Limited ABN 35 091 542 451 | 8 Kearns Crescent Ardross WA 6153
Visit Investor Hub for further updates March 4th, 2026
HIGHLY ENCOURAGING COPPER RESULTS CONTINUE TO
GROW THE CANGALLO PORPHYRY COPPER-GOLD PROJECT
Highlights
• Broad spaced RC drilling has defined a large corridor of continuous mineralisation
extending +1,500m along strike, 250-500m in width and to a depth exceeding 400m,
with the footprint expected to expand with further drilling.
• Significant zones of broad porphyry mineralisation were intersected in hole CANRC034,
with several higher-grade zones including:
o 164m @ 0.33% Cu and 0.07g/t Au from 304m to the end of hole (EOH), including:
▪ 54m @ 0.42% Cu from 306m
▪ 26m @ 0.42% Cu from 380m
o 244m @ 0.23% Cu and 0.07gpt Au from 40 metres
• Drilling to date has delivered multiple broad >0.5% Cu intervals across the corridor,
confirming the system’s capacity to generate high‑grade copper. Significant results
include:
o 68m @ 0.52% Cu from 36m (CANRC012)
o 30m @ 0.60% Cu from 156m (CANRC032)
o 18m @ 0.62% Cu from 134m (CANRC014)
o 10m @ 0.72% Cu from 36m (CANRC008)
o 10m @ 0.65% Cu from 10m (CANRC032)
• Recent assays indicate increasing copper and gold grades toward the southern drill
section, highlighting strong potential for the system to continue expanding.
• Preparations are underway for the upcoming +5,000m RC drill program, which is
expected to commence in mid-March.
• +5,000m diamond drill program scheduled for April to target higher‑grade depth
extensions of the copper sulphide mineralisation.
• The potential of this exciting new copper discovery continues to improve, with results
confirming extensive near-surface copper oxide mineralisation and potential for higher
grade hypogene mineralisation, in an excellent location close to the coast and key
infrastructure.
• Copper occurs as oxides from surface to depths of ~200m to 250m, transitioning to mixed
oxides and secondary sulphides to depths of +300 metres, supporting strong potential
amenability to heap leach processing.
AusQuest Limited (“AusQuest” or the “Company”) (ASX: AQD) is pleased to report further
assay results from the Stage 3 Reverse Circulation (RC) drilling program at its 100%-owned
2
Cangallo Porphyry Copper-Gold Project in Peru. A full assessment of all the newly received
geochemical data is in progress.
The initial phase of the Stage 3 RC drilling program was designed to extend the mineralisation
intersected in Stages 1 and 2 and to further evaluate the scale potential of the Cangallo
porphyry copper-gold system. Results to date continue to support the interpretation that
Cangallo is a very large and laterally continuous porphyry system (Figure 1).
Assay results demonstrate continuity of the porphyry copper system from north to south, with
the mineralised footprint now estimated to be at least 1,500 metres in length, 250-500 metres
wide and extending to a depth of more than 400 metres.
Importantly, diamond drill-holes CANDD001 and CANDD002 indicate that mineralisation can
extend to depths of greater than 800 metres, highlighting the significant growth potential of the
project.
Figure 1: Cangallo Prospect showing location of Stage 3 RC drill-holes with copper profiles and potential
extensions inferred by drilling and surface copper anomalism.
3
A review of copper intersections reported from the current drilling program has demonstrated
that the 0.1% Cu cut-off grade provides a good indication of the overall size of the porphyry
system, but does not highlight the continuity of higher copper grades within the system.
Multiple +0.5% Cu intervals greater that 10 metres in thickness have been intersected within
the broader mineralised envelope demonstrating the capability of the porphyry system to
produce higher grade copper either through supergene enrichment processes or as hypogene
mineralisation within dykes associated with the system. In addition, 34 individual 2m composite
samples assayed more than 0.8% Cu providing further evidence of the potential for higher
copper grades within the system
Continuity of the higher-grade copper zones is unknown at this stage given the broad-spaced
nature of the drilling completed to date.
Significant +0.5% Cu intersections greater than 10 metres in thickness include:
Hole ID From (m) To (m) Interval (m) Cu %
CANRC008 36 46 10 0.72
CANRC032 10 20 10 0.65
CANRC014 134 152 18 0.62
CANRC032 156 186 30 0.60
CANRC002 362 372 10 0.57
CANRC002 354 374 20 0.56
CANRC003 164 182 18 0.55
CANRC002 470 480 10 0.53
CANRC001 252 264 12 0.53
CANRC012 36 104 68 0.52
CANRC014 186 200 14 0.52
CANRC008 50 64 14 0.52
CANRC002 416 426 10 0.51
CANRC034 388 398 10 0.51
CANRC014 96 120 24 0.50
Calculations using the Micromine software package were also undertaken to check on the
continuity of Cu mineralisation averaging greater than 0.3% Cu within the broader 0.1% Cu
envelope.
These calculations highlighted substantial thicknesses (50-330m) containing +0.3% Cu on all
the sections drilled. Significant intersections from these calculations are provided in Table 1
below and shown in Figure 2. (Table 2 below highlights significant intersections recently
received using 0.1% Cu and 0.3% Cu cut-off grades as used in previous releases).
Many of these higher-grade intercepts occur within the oxide zone and are associated with
copper oxides (malachite, chrysocolla, atacamite) and/or secondary copper sulphides
(chalcocite, bornite and rare covellite) that occur within the top ~300 metres of section and
may be recoverable using heap leaching techniques.
Increased copper grades in drill-holes CANRC032 and CANRC034 – both of which ended in
mineralisation, provides strong evidence that the mineralisation will extend further to the south,
beyond the areas that have already been drilled, with the strong possibility of higher grades in
this area (Figure 3 and 4).
4
This is supported by surface sampling results (both copper and molybdenum) which also
highlighted the prospectivity of this southern area.
Figure 2: Cangallo Prospect showing location of Stage 3 RC drill-holes and significant intersections
averaging greater than 0.3% Cu.
Next Steps
A full assessment of the multi-element geochemistry and geology from the RC drilling program
is in progress to identify areas within this large-scale system where higher-grade hypogene
copper mineralisation is more likely to occur. Vectors from this work will be used to guide deeper
diamond drilling to test targets identified by this process. Diamond drilling is scheduled to
commence in the second half of April.
Preparations for the next phase of RC drilling are underway with a major new program
comprising +5,000m of RC is expected to commence around the middle of March. This drilling
will provided necessary data to help target higher grade mineralisation within the copper corridor,
as well as provide an initial test of potential extensions to the south ahead of the Stage 4 RC
drilling program planned for H2 2026.
5
Figure 3: Cangallo RC drill section 8244200N showing copper intersections averaging +0.30% Cu –
(NB: intersection for CANRC033 is based on 0.1%Cu cut off shown in Table 2)
Figure 4: Cangallo Long Section A-A’ showing the open-ended extent of copper mineralisation defined
to date by the RC drilling program.
6
Commenting on the latest results, AusQuest’s Managing Director, Graeme Drew, said:
“We are very pleased with progress at Cangallo as the known footprint of copper mineralisation
continues to expand the more we drill and remains open in multiple directions even though we
have tested roughly 1,500 metres of strike demonstrating the significant scale potential.
“Our focus to date has been on determining the size and outer limits of the mineralisation, and
we are pleased that the scale of this porphyry system is living up to our expectations.
“The potential for higher copper grades in excess of 0.5% Cu within the mineralised system is
also starting to emerge, which is an exciting development for the project given the broad
spaced nature of our current drilling.
“We are also encouraged to see that copper continues to occur from surface and is oxidised
to depths of 200 to 250m, making it a viable proposition for an early open-cut operation, with
the shallow copper potentially recoverable by heap leaching – a low-cost processing option.
Continuity of copper mineralisation averaging over 0.3% Cu is also very encouraging given
much of this mineralisation is potentially recoverable by heap leaching techniques.
Deeper hypogene sulphide mineralisation that is associated with multiphase vein systems
containing chalcopyrite and bornite, and potential porphyry stock systems, will be targeted by
diamond drilling once the RC drilling results have been fully assessed.
“RC drilling is set to restart in a couple of weeks and we look forward to keeping shareholders
updated on results as they become available.”
Peru: Scale and Grade / Early comparisons
Peru is the second largest copper producer in the world behind Chile, with around 2.8Mt of
copper being mined and processed per annum. The bulk of this production comes from large
porphyry copper projects that are located along the Andean Belt that extends from Chile in the
south to Ecuador in the north.
Porphyry deposits are typically large (often over 1 billion tonnes of ore) and usually open-
cuttable with low waste to ore ratios. The shallower parts of these ore bodies are usually oxide
ores that can be processed using heap leach methods, resulting in lower development and
operational costs and positive short-term cash flow.
Copper grades for the oxidised ores are generally lower (except where there is a supergene
enriched zone) than the deeper hypogene ores which require more expensive mining and
processing methods.
There are a number of profitable large-scale porphyry copper operations within the Arequipa
District where Cangallo is located as well as potential developments at Zafranal and Tia Maria,
using head grades between 0.20% and 0.40% Cu. These mines have multi-decade mine-lives
and are long-lived assets.
The economic viability of the Peruvian resources is often affected by a range of issues
including location, altitude, proximity to infrastructure and water, as well as land usage conflicts
with local communities. In this regard Cangallo is well placed.
7
The Cangallo Project is particularly well located with respect to the above, being close to
significant infrastructure, 25km east of the town of Chala and at low altitudes within 10km of
the coast. Community consultation has formed part of the Company’s exploration process, with
no critical issues identified to date.
Peru is a stable country and the government is supportive of new mine developments as they
add significantly to the Peruvian economy and the communities where they are located.
Graeme Drew
Managing Director Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining
and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as a
Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in the report of
the matters based upon his information in the form and context in which it appears.
FORWARD-LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on management’s
beliefs, opinions and estimates as of the dates the forward looking statements are made and no obligation is
assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect
other future developments
*Announcements to ASX for the Cangallo Project
2023 – 2025 Quarterly Activities and Cashflow Reports
11/02/2026 Cangallo delivers significant Cu extensions extending the porphyry discovery to over 1500m
06/01/2026 Diamond and RC drilling substantially expands scale of copper mineralization at Cangallo
02/12/2025 Stage 3 Drilling commences at the Cangallo Copper-Gold Discovery in Peru
13/11/2025 RC Drilling set to commence at Cangallo
12/11/2025 Diamond Drilling more than doubles depth extent of copper mineralisation at Cangallo
30/09/2025 Diamond Drilling Commences at Cangallo
28/08/2025 Cangallo Porphyry Copper Discovery continues to grow
21/07/2025 Cangallo Drilling Progress Report
12/06/2025 Drilling Commences at Cangallo
24/04/2025 Drilling set to commence at Cangallo
05/03/2025 Drilling to extend Cangallo Cu-Au discovery
06/02/2025 Cangallo Discovery Confirmed
23/01/2025 Significant Porphyry Copper Discovery at Cangallo
17/12/2024 Drilling commences at Cangallo in Peru
8
Table 1: Significant intersections averaging +0.3% Cu from within the 0.1% Cu envelope
Hole_id From (m) To (m) Width (m) Cu_ppm Au_ppm Mo_ppm Ag_ppm
CANRC001 6 88 82 3054 0.07 6 0.10
CANRC001 224 278 54 3001 0.10 16 0.51
CANRC001 288 354 66 3090 0.07 22 0.39
CANRC002 130 148 18 3209 0.06 69 0.03
CANRC002 214 248 34 3028 0.06 71 0.49
CANRC002 266 278 12 3221 0.04 30 0.43
CANRC002 292 402 (EOH) 110 3010 0.07 26 0.41
CANRC003 36 190 154 3695 0.06 18 0.19
CANRC003 236 288 52 3077 0.06 42 0.33
CANRC005 20 34 14 3104 0.04 4 0.07
CANRC005 54 96 42 3033 0.10 13 0.12
CANRC005 100 112 12 3067 0.10 5 0.27
CANRC007 58 70 12 3047 0.06 44 0.17
CANRC007 78 158 80 3012 0.07 90 0.21
CANRC007 258 312 54 3019 0.03 36 0.38
CANRC007 334 364 30 3060 0.05 48 0.28
CANRC008 34 338 304 3040 0.06 18 0.23
CANRC008 372 398 26 3015 0.08 20 0.23
CANRC009 38 50 12 3121 0.07 23 0.07
CANRC009 130 148 18 3056 0.04 61 0.43
CANRC010 50 72 22 3010 0.07 19 0.09
CANRC010 94 146 52 3081 0.06 34 0.27
CANRC011 62 82 20 3011 0.05 31 0.06
CANRC011 256 310 54 3037 0.03 28 0.31
CANRC012 36 346 310 3066 0.07 14 0.28
CANRC013 32 90 58 3286 0.05 28 0.07
CANRC013 110 340 230 3009 0.06 30 0.58
CANRC014 32 362 330 3032 0.06 15 0.37
CANRC017 174 236 62 3216 0.06 33 0.72
CANRC017 280 298 18 3097 0.08 27 0.59
CANRC017 304 324 20 3081 0.06 34 0.44
CANRC019 142 174 32 3042 0.05 15 0.16
CANRC019 196 230 34 3033 0.04 19 0.50
CANRC021 68 108 40 3049 0.08 21 0.23
CANRC021 262 296 34 3067 0.12 35 0.52
CANRC022 66 88 22 3020 0.10 10 0.06
CANRC022 96 110 14 3179 0.03 13 0.04
CANRC022 184 202 18 3018 0.02 14 0.34
CANRC022 260 270 10 3188 0.05 13 0.65
CANRC023 78 130 52 3386 0.03 11 0.11
CANRC026 66 116 50 3048 0.02 14 0.11
CANRC026 208 218 10 3080 0.05 26 0.63
9
CANRC027 226 286 60 3025 0.04 15 0.61
CANRC027 378 388 10 3180 0.06 12 0.77
CANRC027 410 435 (EOH) 25 3026 0.07 48 0.57
CANRC032 6 22 16 4498 0.05 6 0.05
CANRC032 154 326 172 3337 0.07 13 0.67
CANRC032 344 406 62 3138 0.06 23 0.54
CANRC032 420 430 10 3150 0.06 5 0.55
CANRC032 434 444 (EOH) 10 3160 0.08 9 0.28
CANRC034 112 144 32 3010 0.07 10 0.43
CANRC034 236 288 52 3092 0.10 14 0.77
CANRC034 304 468 (EOH) 164 3319 0.07 20 0.66
CANDD002 16 130 114 3005 0.08 9 0.16
CANDD002 138 148 10 3185 0.11 6 0.70
CANDD002 294 566 272 3038 0.07 19 0.45
Copper intervals calculated using the 0.1% Cu cut-off envelope, an average Cu grade >0.3% Cu, an
internal waste of 6 metres, and a minimum width of 10 metres.
Gold, molybdenum and silver values were averaged for same intervals as the copper intersections.
Table 2: Significant intersections from Stage 3 RC drilling program include:
Hole Number From (m) To (m) Width (m) Cu % Au ppm Mo ppm Ag ppm
CANRC033 46 74 28 0.13 0.05 6 0.08
110 128 18 0.15 0.25 6 0.17
140 254 114 0.15 0.06 15 0.34
342
408
(EOH) 66 0.14 0.06 8 0.24
CANRC034 40 284 244 0.23 0.07 10 0.35
304
468
(EOH) 164 0.33 0.07 20 0.65
including 124 144 20 0.35 0.06 10 0.52
246 256 10 0.42 0.08 21 1.10
260 278 18 0.41 0.09 12 0.88
306 360 54 0.42 0.07 22 0.91
380 406 26 0.42 0.09 25 0.76
416 442 26 0.34 0.08 14 0.60
CANRC035 42 86 44 0.22 0.05 11 0.05
152 174 22 0.18 0.1 10 0.40
CANRC037 14 120 106 0.13 0.05 16 0.07
130 170 40 0.12 0.04 17 0.30
CANRC038 14 160 146 0.13 0.04 31 0.12
CANRC039 58 98 40 0.12 0.03 17 0.05
126 140 14 0.13 0.14 95 0.09
Broad copper intervals determined using a 0.1% Cu cut-off and an internal waste of 6 metres.
Gold, molybdenum and silver values were averaged for same intervals as the copper intersections.
Higher grade intervals(including) were determined using 0.3% Cu cut-off and 6 metre waste
intervals and a minimum 10 metre width.
1
JORC Code, 2012 Edition – Table 1 report, Reverse Circulation Drilling at Cangallo
in Peru
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public Report.
• In cases where ‘industry standard’ work has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Samples are collected using a tube sampler by spearing
into each one metre sample bag and compositing samples
on a two-metre basis.
• Sample depths are determined by the length of the rod-
string and confirmed by counting the number of samples
and bags at the drill platform as per standard industry
practice.
• A ~4kg sample is collected for representivity.
Drilling techniques • Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
• RC Drilling with a face sampling bit has been used with a
hole diameter of approximately 132mm.
• Down-hole surveys are recorded at 10m intervals using a
down-hole gyroscope probe.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and results
assessed.
• Measures taken to maximise sample recovery and ensure representative nature of the
samples.
• Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
• Experienced RC drillers and an appropriate rig were used
to provide maximum sample recovery.
• Minimal to no water was encountered in all drill holes.
• The weight of every bulk 1 metre sample was recorded
and checked for sample recovery estimates. Sample
recovery was acceptable to industry standard.
• The sample weight of every laboratory sample was also
collected and weighed on site for future reference.
• At this early stage of exploration, it is not known if there
is a relationship between sample recovery and assay
grade.
2
Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant intersections logged.
• RC sample chips were collected into chip trays and are
stored for future reference.
• RC samples were logged on site during the drilling by
experienced geologists to identify key rock types and
mineralization styles.
• Sample logging was qualitative with visual estimates of
mineralization made for later comparison with assay
results.
• All one metre drill samples were logged.
Sub-sampling
techniques and
sample preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material being sampled.
• RC samples were collected every 1 metre into large
plastic bags and stored in rows per depth at the drill site.
• Samples were collected using a 50mm tube sampler and
composited on a two metre basis.
• Certified coarse blanks and fine standards are inserted
approximately every 35 samples and duplicates taken
every 20 samples for quality control purposes.
• The sample sizes are considered appropriate for the
geological materials sampled.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and
precision have been established.
• Assaying of the drill samples is by standard industry
practice.
• The samples are sorted, dried, crushed then split to obtain
a representative sub-sample which is then pulverized.
• A portion of the pulverized sample is digested using a
four acid digest (Hydrofluoric, Nitric, Hydrochloric and
Perchloric) which approximates a total digest for most
elements. Some refractory minerals are not completely
dissolved.
• Inductively Coupled Plasma Mass Spectroscopy (ICP-
MS) was used to measure Ag, Al, As, Ba, Be, Bi, Ca, Cd,
Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg,
Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr,
Ta, Te, Th, Ti Tl, U, V, W, Y, Zn, Zr,
• Au assays were provided by 30g fire assay with AA
finish.
• Every 2 metre composite sample is also submitted for
3
Criteria JORC Code explanation Commentary
Hyperspectral analysis using a TerraSpec instrument and
uploaded into the aiSIRISTM
software for mineral
identification and spectral output.
• Assays are provided by ALS del Peru in Lima which is a
certified laboratory for mineral analyses. Analytical data
is transferred to the company via email.
• Data from the laboratory’s internal quality procedures
(standards, repeats and blanks) are provided to check data
quality.
• The Company collects duplicate samples on an
approximate 1: 20 basis, and inserts coarse blanks on a
1:30 basis and fine blanks on a 1:35 basis and fine
standards are inserted on a 1:35 basis.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No verification of intersections was undertaken. Drilling
is still wide spaced and semi-reconnaissance in nature.
• All primary sample data is recorded onto a printed sheet
on site and uploaded to a site laptop, all geological data is
recorded at the drill platform on a site laptop and
downloaded daily and onto an external backup.
• No adjustments have been made to the assay data.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill hole collars including elevation are located by hand
held GPS to an accuracy of approximately 5m.
• All surface location data are in WGS 84 datum, UTM
zone 18S.
Data spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• RC drill-holes were sited to test for mineralization at
shallow depths within a broader intrusive complex and
testing for broad zones of stockwork veining associated
with a hydrothermal mineralised system
• Samples were composited on a 2 metre basis.
Orientation of data
in relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
• Any bias due to the orientation of the drilling is unknown
at this early stage of exploration.
Sample security • The measures taken to ensure sample security. • Sample security is managed by the operator of the Project.
4
Criteria JORC Code explanation Commentary
Procedures match with Industry best practice.
• Samples are collected into securely tied bags and placed
into cable-tied plastic bags for transport to the laboratory.
Each sample batch has a sample submission sheet that
lists the sample numbers and the work required to be done
on each sample.
• Samples were transported to the laboratory by company
vehicle using trusted company personnel.
• Sample pulps (after assay) are held by the laboratory and
returned to the company after 90 days.
Audits or reviews • The results of any audits or reviews of sampling techniques and data. • No reviews or audits of the sampling techniques or data
have been carried out to date.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
• The Cangallo project is located approximately 25 km
east of the town of Chala in the south of Peru.
• The Cangallo project comprises 14 granted mineral
concessions. The tenements are held by Questdor which
is a 100% subsidiary of AusQuest Limited.
• There are no major heritage issues to prevent access to
the tenements. A drill permit (FTA) has been provided
by INGEMMET for the drilling program following
environmental, and community approvals.
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties. • No historic exploration data is available.
Geology • Deposit type, geological setting and style of mineralisation. • The Cangallo project is targeting Porphyry deposits
along the coastal belt of southern Peru. These are large
scale disseminated copper (and gold) deposits found
within orogenic belts that surround the Pacific Rim. The
deposits can be really large requiring significant drilling
to evaluate.
5
Criteria JORC Code explanation Commentary
Drill hole
Information
• A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
• All relevant drill hole data and information are provided
below.
Data aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregatio
Share your feedback
Discover