June 2025 Quarterly Activities Report
HIGHLIGHTS
Peru – Copper-Gold
❑
Stage 2 Reverse Circulation (RC) drilling at Cangallo materially expands the size of the
porphyry copper system both laterally and at depth, with more assays to come.
❑
High copper values (>0.3% Cu) continue to be intersected from near-surface, with most
drill-holes also ending in mineralisation.
❑
All copper intersections to date occur within the volcanic host rocks or narrow tonalite
(porphyry) dykes. The presence of higher grades within the dykes implies the potential for
increased copper grades when the causative porphyry is intersected.
❑
Preliminary metallurgical test-work on RC samples suggests that the copper oxides could
be amenable to heap leaching.
❑
Diamond drilling is planned to commence in late August to test the depth extent of copper
mineralisation and provide geological data to help vector to the causative porphyry.
❑
Drill permits for an expanded Stage 3 RC drilling program are expected in the coming
months.
❑
New rock chip surface sampling 1,200m south of the current drilling highlights the
potential large scale of the Cangallo mineralised system.
Australia – Copper, Zinc, Nickel, Gold, Iron
❑
At Balladonia, the RC drilling program (42 holes for a total of 8,006m) designed to test
multiple magnetic, gravity and electromagnetic (EM) targets intersected prospective host
rocks for base metal mineralisation. Assessment of multi-element geochemical data is in
progress.
❑
Significant thicknesses of coarse-grained magnetite were intersected in at least four of the
six targets tested by RC drilling at the Morrisey Project. Assays and Davis Tube Recovery
(DTR) test results are awaited.
❑
At the Coober Pedy Project (SA), Induced Polarisation (IP) targets were located by the
MIMDAS IP/MT survey, highlighting potential drill targets for Iron-Oxide Copper-gold
(IOCG) mineralisation.
❑
Heritage clearance was received for target drilling at the Mt Davis Project in Western
Australia (WA).
Corporate
❑
Quarter-end cash position of ~$7.2 million, with additional funds expected in Q3 CY2025
under the Strategic Alliance Agreement (SAA) with a wholly-owned subsidiary of
South32 (South32), for agreed work programs.
Figure 1: Project Locations – Australia and Peru.
OVERVIEW
During the June Quarter, the second phase of
drilling at the Cangallo porphyry copper-gold
discovery was centre stage, with the Company
aiming to build on earlier results and confirm
a significant new greenfields copper-gold
discovery in Peru. In Western Australia,
advancing the Balladonia base metal and
Morrisey magnetite projects was a priority,
with target definition surveys for IOCG
mineralisation at Coober Pedy in South
Australia also completed.
In Peru, the Stage 2 RC drilling program at
Cangallo commenced following receipt of
drill permits, with initial assay results
received subsequent to the end of the Quarter.
Drill permits for the Stage 3 RC drilling
program were advanced along with permits
for drilling at the Company’s other prospects
along strike from Cangallo (Lantana and
Playa Kali).
In Australia, drilling at Balladonia and
Morrisey projects, together with geophysical
(IP) surveys at Coober Pedy in South
Australia, were completed with initial results
being received around the end of the Quarter.
Heritage clearance for drilling was completed
at Mt Davis.
PERU COPPER-GOLD PROJECTS
AusQuest has assembled a strong portfolio of
copper-gold prospects along the southern
coastal belt of Peru in South America, with
numerous targets identified for drilling as
possible porphyry copper and/or replacement
style (manto) IOCG targets with size potential
being of significance to AusQuest (Figure 2).
Peru is one of the world’s most prominent
destinations for copper exploration and is
considered a prime location for world-class
exploration opportunities.
Figure 2: Project Locations – Southern Peru.
Cangallo Copper-Gold Project (100%
AQD)
The
Cangallo
Project
is
located
approximately 20km west of the Company’s
Cerro de Fierro Project in southern Peru,
along the same E-W structures that appear to
control the emplacement of potential
porphyry copper systems in the area. The
tenements, which cover an area of ~ 60km²,
are very well located, ~10km from the coast
and close to infrastructure, at an elevation of
between 500 and 1,200 metres. Geological
mapping and rock-chip sampling has
identified a partially exposed copper (+/gold) porphyry system within a large-scale
(minimum 3km x 2km) caldera-like structure
containing extensive colluvial and younger
sediment cover.
Immediately subsequent to Quarter-end,
AusQuest received results from the first four
RC drill-holes from the Stage 2 drilling
program at Cangallo, extending the known
mineralisation both laterally and at depth and
providing further strong support for a new
large-scale porphyry copper discovery (ASX
release 21st July 2025).
Assay results continued to confirm the
presence of broad zones of copper
mineralisation – both as oxides (malachite,
chrysocolla, and atacamite) and sulphides
(chalcopyrite, bornite and chalcocite)
extending from near-surface to depths in
excess of 300 metres. Significant assays are
provided in Table 1 below and drill-hole
locations are shown in Figure 3.
All copper intersections in drill-holes
CANRC009 to CANRC012 occur within the
host volcanics, which are variably veined and
fractured, or within narrow tonalite dykes
(with higher copper grades) that are thought
to emanate from the causative porphyry.
These dykes could provide vectors to the
main porphyry and, potentially, higher-grade
copper mineralisation.
So far, the causative porphyry stock or centre
of the system has not been intersected,
reinforcing the significant upside potential at
the Cangallo Project. Further drilling is
planned to help vector towards the centre of
the mineralised system, including deep
diamond holes commencing in late August
and the Stage 3 RC drilling program, which
will commence as soon as permits for the
planned drill pads are received within the next
month or two.
Figure 3: Cangallo Porphyry Copper Prospect showing drill-hole locations and significant intersections.
Assay results from CANRC012 (160m @
0.45% Cu and 0.09ppm Au from 36m)
extend the higher copper grades that were
reported from the maiden drilling program in
holes CANRC03 and CANRC08 (see ASX
release on February 6th 2025) and provide a
level of confidence that ore grade forming
processes are active in the area.
Table 1: Significant assay results for drill-holes CANRC02 to CANRC012:
Hole Number
CANRC009
Including
CANRC010
Including
CANRC011
Including
CANRC012
Including
From (m)
18
166
130
36
96
18
226
378
62
226
36
36
388
To (m)
148
408 (EOH)
148
310
134
142
352
400 (EOH)
80
298
360
196
432 (EOH)
Interval (m)
130
242
18
274
38
124
126
22
18
32
324
160
44
Cu %
0.23
0.16
0.31
0.19
0.36
0.16
0.23
0.16
0.31
0.37
0.30
0.45
0.18
Au ppm
0.06
0.03
0.04
0.03
0.06
0.04
0.03
0.03
0.04
0.04
0.07
0.09
0.05
Mo ppm
38
43
61
32
34
26
30
19
32
32
14
13
15
Ag ppm
0.13
0.21
0.42
0.24
0.26
0.16
0.22
0.18
0.06
0.36
0.27
0.3
0.12
(Broad copper intervals were determined using a 0.1% Cu cut-off and an internal waste of 6 metres. Gold, molybdenum
and silver values were averaged over the same intervals as determined by the Cu intersections. Higher grade intervals
(including) were determined using 0.3% Cu cut-off and 6 metre internal waste intervals.)
The oxide zone, which starts from nearsurface and extends to depths in excess of
200m, contains zones of higher copper grades
and mineralogy that reflect the potential for a
supergene enrichment process occurring in
this area, and possibly across the whole
prospect.
Assay results from CANRC009 and
CANRC011
indicate
that
copper
mineralisation extends further south than the
current drill coverage, both laterally and at
depth (both holes ended in mineralisation).
This highlights the potential for a significant
expansion in size of the porphyry system(s) to
the south, where new drill pads are currently
being permitted (Figure 4).
Recent geological mapping and rock chip
sampling supports the extension of
mineralisation to the south, where highly
anomalous copper (>0.5% Cu) and gold
values (>1.0ppm Au) were found to occur
within dykes intruding the volcanics,
suggesting the presence of further porphyry
mineralisation at least 1,200m south of the
current drilling.
Figure 4: Cangallo Prospect showing surface copper assays (LHS) and gold assays (RHS) in relation to
Stage 1 and 2 drill programs as well as the planned Stage 3 drill-pads.
The Stage 2 drill program (13 RC drill-holes
for ~5,000m) is expected to be completed by
the end of July with all assays available
around the end of August. This program is
only testing a small fraction of the prospective
target area, with permits to enable drilling to
the south of the current coverage (Stage 3)
expected within the next two months (Figure
4).
Planning for deep diamond drilling is in
progress with a diamond rig expected on site
in the second half of August. Diamond
drilling will be used to test the depth extent of
copper sulphides found in the bottom of
current drill holes, as well as define potential
vectors to the porphyry centre that could be
located below the near-surface mineralisation
or beneath the cover.
Preliminary metallurgical test work on 10
selected RC samples from the maiden drill
program has been completed by Plenge
Laboratory in Lima under the supervision of
Ausenco Ltd, to provide an early indication of
the leachability of copper from a range of
depths and mineralogy types.
While the results are very early and not
conclusive, at least seven of the 10 samples
were reported to have “generally good but
variable oxide leach performance” with
copper recoveries between 60 and 80%, and
acid consumption (sulphuric acid) at low to
moderate (<28 kg/t) levels. The remaining
three samples had copper recoveries between
33% and 50%. The distribution of the mineral
species that were subject to the metallurgical
test work is not known at this time.
Cerro de Fierro Copper Project (100%
AQD)
The Cerro de Fierro Project (CDF) is located
at the southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~150km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), which is being
developed by the Marcobre Joint Venture.
Surface indicators of porphyry copper
mineralisation have been identified within the
Pirata Project area, approximately 20km east
of Cangallo, associated with a major E-W
structure that is considered to be a priority
target zone for porphyry copper deposits
within the coastal belt of southern Peru.
During the Quarter, final drill permits for
eight of the 20 drill pads were received with
the remainder expected shortly. The drill pads
have been sighted to test the Lantana
porphyry copper prospect, which is
considered to be a high-priority porphyry
copper target due to its scale (~2,000m x
800m) and the widespread occurrence of
highly anomalous copper, molybdenum and
bismuth values obtained from rock-chip
sampling programs completed in 2023.
Playa Kali IOCG Project (100% AQD)
The Playa Kali Project is located ~10km east
of the town of Chala and ~120km south-east
of the Mina Justa copper deposit (~475Mt @
0.68% Cu). It consists of four mineral claims
covering an area of ~40km² and was acquired
after manto-style mineralisation (including
massive magnetite layers with patchy copper
and gold values) was located within a
sequence of sediments similar to those found
in the vicinity of the Marcona and Mina Justa
deposits to the north. Geological mapping,
rock-chip sampling and ground magnetic
surveys have been completed over the
tenements, defining target areas for further
exploration targeting manto-style copper-gold
deposits.
During the Quarter, the drill permitting
process continued for 20 drill pads designed
to test the Playa Kali IOCG prospect.
Approvals for surface access from the SBN
(National Supervisor of State Assets) is
expected within the next 1-2 months. At Playa
Kali, numerous manto (Fe) outcrops with
visual evidence of copper mineralisation have
been located, providing strong evidence for
extensive manto development in the area.
Ground magnetic surveys have outlined a
number of targets beneath cover, that are
considered priority targets for manto-style
copper (and potentially gold) mineralisation.
Parcoy IOCG Project (100% AQD)
The Parcoy Project is located near the
southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~100km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), and ~50km northwest of the Company’s Cerro de Fierro
Project. Geological mapping and rock-chip
sampling
has
identified
significant
concentrations of copper (+/- gold) at
surface, reflecting potential manto-style
mineralisation
within
the
volcanic
stratigraphy.
The Company believes that there are copper
targets at Parcoy that were not tested by the
initial wide-spaced drilling programs and is
re-considering its options following the
encouraging results received from its
Cangallo Prospect, located ~40km to the
south-east.
New Opportunities (Peru)
The search for new copper opportunities has
been put on hold while the Company focuses
on its porphyry copper-gold discovery at the
Cangallo Project, which has the potential to
significantly impact the value of the
Company.
AUSTRALIA – BASE METAL
PROJECTS (Copper, Zinc, Nickel & REE)
Balladonia Nickel-Copper and REE
Project (100% AQD, subject to SAA)
The Balladonia Project is located ~50km
south of the Nova–Bollinger nickel-copper
deposit. It consists of 12 Exploration Licences
(six granted and six applications) covering an
area of ~1,400km² and is located within a
structurally complex region of the Fraser
Range Terrane. Exploration at Balladonia
has indicated potential for multiple
mineralisation styles with many priority
targets identified. This includes the potential
for nickel and copper mineralisation similar
to the Nova deposit, as well as iron-oxide
copper-gold (IOCG) and Broken Hill Type
(BHT) deposits similar to those found in the
Eastern Succession (NW Queensland) and in
NSW. More recently, the potential for rare
earth elements (REE) associated with
carbonatite intrusions has also been
recognised. Many of the tenements lie within
the Dundas Reserve. Exploration work at
Balladonia is funded under the SAA.
During the Quarter, an extensive RC drill
program (42 holes for a total of 8,006m) was
completed to test a range of priority magnetic,
gravity and electromagnetic (EM) targets for
base and precious metals within host rocks
considered to be similar to those found in NW
Queensland and in the Broken Hill District,
where numerous base metal mines have been
discovered (Figure 5).
The drilling was semi-regional in nature
(600m x 200m) providing broad coverage
over the Tea Tree Prospect, where Broken
Hill type (BHT) stratigraphy and alteration
had been identified by earlier diamond
drilling, as well as testing EM conductors
within the adjoining sequences (ASX Release
10 June 2025).
Figure 5: Detailed magnetic (image) showing the location of the RC drill-holes.
Geological logging of the RC drill chips
reported numerous banded iron formation and
garnet quartzite intervals, supporting the
concept of an extensive belt of prospective
host rocks for base metal mineralisation.
Final assay data were received late in the
Quarter and are currently being assessed and
compiled with other datasets in order to
identify potential target areas for further
exploration, including drilling.
Drill-holes designed to test EM targets
intersected graphitic intervals coincident with
the modelled conductor positions at three of
the four targets tested. The fourth and deepest
target (Anomaly K at ~300m depth) was not
explained by the drilling.
Down-hole EM (DHEM) at Anomaly K,
confirmed that the drill-hole had not
intersected the EM target, which is interpreted
to occur below the trace of the hole based on
modelling of the DHEM data. Deeper drilling
will be considered once assay data from the
RC drilling program have been properly
assessed.
During the Quarter a draft submission for
drilling and geophysical surveys inside the
Dundas Nature Reserve was submitted to the
Department of Biodiversity Conservation and
Attractions (DBCA) for review under the
Company’s agreed Management Plan. Their
response is pending.
Morrisey Magnetite, Nickel-Copper-PGE
Project (100% AQD, subject to SAA)
The Morrisey Project is located ~500km north
of Perth in Western Australia within Western
Australia’s Midwest mining district. The
project occurs within the high grade
metamorphic Narryer Terrane, which forms
the north-western margin of the Yilgarn
Craton. It consists of three granted
Exploration Licences and one application
covering an area of ~1,130km² and is located
~120km north of the town of Mullewa, where
there is rail access to the Port of Geraldton,
some 80km away. Reconnaissance drilling to
test magnetic targets intersected coarse
grained magnetite which could be upgraded
via magnetic separation methods to a
premium iron product (>70%Fe) potentially
suitable for green iron smelting. Exploration
work at Morrisey is funded under the SAA.
During the Quarter, RC drilling (25 holes for
a total of 4,990m) tested six prospects defined
by magnetic and gravity data, to determine
the overall magnetite potential of the area and
the future commercial possibilities for the
Project (ASX release 29th July 2025).
Significant intersections of high magnetic
susceptibility (>200 x 10-3 SI Units), which is
an indicator of the presence of magnetite, are
provided in the table below. At least four
prospects have produced highly encouraging
results.
The drill holes were reconnaissance in nature
with between three and five holes drilled per
prospect to identify the cause of the
magnetic/gravity
anomalies.
Drill-hole
locations are shown in Figures 6 to 8.
DTR results for drill samples from the
Waterfall Prospect (see ASX release 25
November 2024) confirmed that a premium
iron product (>70% Fe) could be produced
from magnetite occurrences in this area using
coarse grind sizes (106µm and 75µm),
highlighting the commercial potential of the
Project.
All magnetite intervals from the drilling
program have been sent to the Intertek
Genalysis laboratory in Perth for Davis Tube
Recovery (DTR) test work, to determine the
potential for upgrading to a premium iron
product. The results of the DTR test work are
expected to be available within 4 – 6 weeks.
Table 2: Significant magnetite intersections from RC drilling at the Morrisey Project
Prospect
Drill-Hole
From (m) To (m) Interval (m) Magsus SI x 10-3
Murchison South
Murchison South
Murchison South
Murchison
Murchison
Murchison
Sandfly
Sandfly
Sandfly
Sandfly
Waterfall
Waterfall
Waterfall
Waterfall
Waterfall
MYRC022
MYRC022
MYRC024
MYRC030
MYRC031
MYRC032
MYRC033
MYRC033
MYRC034
MYRC035
MYRC038
MYRC039
MYRC040
MYRC041
MYRC044
118
157
86
85
118
124
32
145
107
178
138
40
130
34
97
129
185
99
108
179
168
68
171
170
240
184
133
192
69
119
11
28
13
23
61
44
36
26
63
62
46
93
62
35
22
399
427
335
304
510
403
489
450
450
435
419
452
320
425
503
(Broad magnetite intervals are based on length weighted average of magnetic susceptibilities
(magsus) > 200 x 10-3 SI Units and including a maximum internal waste of 6 metres).
(In relation to the disclosure of visual mineralisation, the Company cautions that estimates of
magnetite abundance from drill chip logging should not be considered a proxy for quantitative
analysis of laboratory assay results which are required to determine the actual widths and grade of
the visible mineralisation).
Figure 6: Deep Bore & Murchison South Prospects showing drill hole locations with respect to the magnetic
and gravity anomalies being tested
Figure 7: Murchison and Sandfly Prospects showing drill hole locations with respect to the magnetic and
gravity anomalies being tested
Figure 8: Waterfall and Bilga South Prospects showing drill hole locations with respect to the magnetic and
gravity anomalies being tested
Coober Pedy Copper-Gold Project (100%
AQD, subject to SAA)
The Coober Pedy Project is located ~15km
SW of the town of Coober Pedy, South
Australia, on the north-eastern margin of the
Gawler Craton, approximately 100km NW of
the Prominent Hill Copper Gold deposit. The
Project, which consists of one Exploration
Licence covering an area of ~170km², was
acquired to explore for iron-oxide coppergold (IOCG) deposits. Regional magnetic and
gravity data, plus analytical results from
historic drilling (five holes) highlighted the
prospectivity of the area. Exploration work at
Coober Pedy is funded under the SAA
During the Quarter, a MIMDAS Induced
Polarisation (IP) and magnetotelluric (MT)
survey (~41km of pole-dipole IP) using 200m
dipoles along lines 400m to 800m apart was
completed to test for sulphide mineralisation
associated with magnetic and gravity
anomalies thought to reflect a favourable
IOCG environment (ASX Release 17th July
2025).
High near-surface conductivities of variable
thickness over the surveyed area made it
relatively difficult to identify chargeable
targets within the underlying bedrock,
however two IP anomalies with moderate
chargeabilities and associated low apparent
resistivities were outlined by the survey.
Figure 9: Gravity Residual Image showing location of IP Targets in relation to interpreted structures.
Figure 10: Magnetic (1VD) Image showing location of IP targets in relation to interpreted structures.
Detailed modelling by GRS Pty Ltd using the
University of British Columbia twodimensional (UBC2D) modelling software
suggests that the source rocks are relatively
deep (at 300m to 500m depth) and discrete.
Comparison of the IP/MT results with the
available gravity and magnetic data indicates
that the IP targets are semi-coincident with
gravity highs (~2 milligals) that occur
adjacent to the interpreted Elizabeth Creek
Fault zone which is one of the regional
structures considered to be associated with the
IOCG mineralisation to the south (Prominent
Hill) (Figures 9 and 10).
Compilation and modelling of IP, gravity and
magnetic data is being initiated to help
optimise potential drill sites for consideration
under the SAA.
Mt Davis Lead-Zinc-Copper Project (100%
AQD, subject to SAA)
The Mt Davis Project is located ~180km NNE
of Wiluna, Western Australia, along the
northern margin of the Earaheedy Basin. It
consists of two Exploration Licences (one
granted and one application) covering an
area of ~970km². The project was acquired
following the discovery of extensive zinc and
copper mineralisation by Rumble Resources
at its Chinook Prospect, located on the
southern side of the Basin, where
mineralisation is stratigraphically controlled
and located below the Frere Iron Formation.
The Mt Davis tenements are believed to
contain similar stratigraphy but in an area of
greater structural complexity which has been
reported as an important factor in the
localisation of higher grades at Chinook.
During the Quarter, a Heritage survey was
completed over planned drill sites and access
tracks that had been proposed as a first step in
testing electromagnetic (VTEM) and soil
geochemical anomalies that are thought to
reflect conductive sediments prospective for
base metals.
Figure 11: Mt Davis: Late Time VTEM Image showing soil anomalies and proposed RC drilling.
Most of the drill holes were cleared by the
survey with drilling now planned to
commence in early Q4 CY2025, subject to
drill rig availability (Figure 11).
The Mt Davis Project is thought to reflect a
structural window into deeper parts of the
Earaheedy Basin or sub-basins, where the
potential for sediment-hosted Cu-Pb-Zn
deposits associated with a basin-wide
mineralising event are most likely to occur.
Jubilee Lake Nickel-Copper-PGE Project
(100% AQD, subject to SAA)
The Jubilee Lake Project is located ~500km
east of Kalgoorlie in Western Australia,
within the northern portion of the Eucla
Basin. It consists of three granted Exploration
Licences covering a total area of ~1,800km².
The Project is situated within a large flood
basalt terrane close to the south-eastern
margin of the Yilgarn Craton and is centred
over the Rodona Shear, which shows strong
evidence as being a key feeder structure to the
surrounding flood basalts. Mafic/ultramafic
intrusions associated with feeder structures to
flood basalt terranes are considered prime
targets for Ni-Cu-PGE sulphide deposits,
similar to those found at the giant Norilsk
deposits in Russia, and more locally at NeboBabel (BHP) and possibly at Nova-Bollinger
(IGO). Exploration work at Jubilee is funded
under the SAA.
Further field work at this project awaits
advice from Central Desert Native Title
Services and the Traditional Owners
regarding proposed heritage clearance surveys
for drilling designed to test the Company’s
concept of a new nickel-copper province.
Hamilton Copper-Gold Project (100%
AQD)
The Hamilton Project is located in north-west
Queensland, ~120km south of the world-class
Cannington mine and ~70km south of the
Osborne copper mine. It consists of two
Exploration Licences covering an area of
~260km². Exploration is targeting iron oxide,
copper, gold (IOCG) and Broken Hill Type
(BHT) mineralisation beneath the extensive
cover in the region. Limited drilling
completed to date to test magnetic and gravity
targets, provided evidence for “near-miss”
situations which are the focus of the
Company’s ongoing exploration.
During the Quarter, agreement was reached
with DDH1 to complete a limited drilling
program (1 x 500m drill hole) following
advice from the Queensland Government that
the Company’s application for funding
assistance
under
the
Collaborative
Exploration Initiative program had been
successful,
Strong potassic, calcic and iron alteration
intersected by several of the Company’s
earlier drill-holes is thought to reflect
proximity to mineralisation beneath the
Eromanga Basin sediments, which was not
fully tested by the earlier drill programs.
Drilling is expected to commence in late
September.
New Opportunities (Australia):
New opportunities within Australia continue
to be assessed by the Company’s consultants.
CORPORATE
In accordance with ASX Listing Rule 3.14,
the Company advises that effective 1 August
2025, its registered office will change to:
c/: Nexia Perth
Level 4, 88 William Street,
Perth Western Australia 6000
All other contact details remain the same.
At the end of the June Quarter, the Company
had approximately $7.2 million in cash after
investing ~$3.6 million in exploration. The
Company expects to receive additional funds
from South32 during Q3 CY2025 to cover
work programs in Australia that have been
agreed under the SAA.
The Company’s Cashflow Report (Appendix
5B) for the Quarter ended 30 December 2024
is appended to this report. Payments to related
parties as shown in Section 6 of this report
include director salary and superannuation
payments of $54,750, and payments of
$12,000 for corporate consulting fees to a
director.
The Company advises that its appeal to the
Administrative Judiciary against payments
requested by the SBN (National Supervisor of
State Assets) for temporary access to StateOwned land for drilling purposes, has been
accepted by the Supreme Court of Peru, and a
decision on whether this request for payment
is legal, is now under consideration by the
Court. The Company continues to monitor the
position and will keep shareholders advised of
any significant developments.
KEY ACTIVITIES – SEPTEMBER 2025
QUARTER
•
•
•
•
Balladonia
(Cu-Au-Ni-REE)
–
Complete assessment of RC drill data
and plan next steps.
Morrisey (Magnetite) – Complete
DTR test work on RC drill samples
and assess magnetite potential of
Project.
Coober Pedy (Cu-Au) – Compiling &
model geophysical data. Optimise drill
sites.
Jubilee Lake (Ni-Cu-PGE) – Continue
Heritage negotiations for drilling.
•
•
•
•
•
Mt Davis (Cu-Pb-Zn) – Commence
access preparation for RC drill
program.
Hamilton (Cu-Au) – Complete
diamond drilling of Hamilton South
prospect.
Peru (Cu-Mo-Au) – Complete Stage 2
RC and initial diamond drilling at
Cangallo.
Peru (Cu-Mo-Au) – Finalise drill
permitting for Stage 3 RC drilling at
Cangallo. Prepare access and drill
pads.
Peru (Cu-Mo-Au) – Complete drillpermitting for Lantana and Playa Kali
Copper Prospects.
Authorised for release on behalf of the
Company by:
Graeme Drew
Managing Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr Graeme Drew, a
full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining and Metallurgy (AUSIMM)
and has sufficient experience in the activity which he is undertaking to qualify as a Competent Person as defined in the December
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
Mr Drew consents to the inclusion in the report of the matters based upon his information in the form and context in which it
appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements concerning
mining reserves and resources may also be deemed to be forward looking statements in that they involve estimates based on
specific assumptions. Forward-looking statements are not statements of historical fact and actual events and results may differ
materially from those described in the forward looking statements as a result of a variety of risks, uncertainties and other factors.
Forward looking statements are based on management’s beliefs, opinions and estimates as of the dates the forward looking
statements are made and no obligation is assumed to update forward looking statements if these beliefs
Share your feedback
Discover