Drilling Commences at Coober Pedy
Released
Released
Announcement PDF
JOIN AUSQUEST’S INTERACTIVE INVESTOR HUB.
Visit AUSQUEST.COM.AU for AusQuest’s interactive Investor Hub
AusQuest Limited ABN 35 091 542 451 | 8 Kearns Crescent Ardross WA 6153
June 11th 2026
DRILLING COMMENCES AT THE COOBER PEDY IOCG
PROJECT, SOUTH AUSTRALIA
• Project located within the Olympic Dam IOCG Province in South Australia.
• Drilling to test geophysical and geochemical targets.
• Coober Pedy is subject to a Strategic Alliance Agreement.
AusQuest Limited (ASX: AQD) is pleased to advise that a Reverse Circulation (RC) drilling
program has commenced at the Coober Pedy Iron-Oxide Copper-Gold (IOCG) Project, located
at the northern end of the Olympic Dam IOCG Province in South Australia (Figure 1).
The drilling is centred on magnetic/gravity and Induced Polarisation (IP) targets (see ASX
announcement dated July 17 2025) and historical drilling completed by Vale. The Coober Pedy
Project is subject to the Strategic Alliance Agreement (SAA) with a wholly-owned subsidiary of
South32 Ltd (South32).
AusQuest plans to drill ten (10) to fifteen (15) vertical RC drill holes to a planned depth of
350m. Previous drilling by Vale identified strong potassic alteration below an 80m cover
sequence. An experienced South Australian drilling contractor has been engaged to drill the
compelling targets, which are located 10km from the opal town of Coober Pedy. The drilling is
expected to take four weeks to complete with final assays expected approximately four weeks
after completion of drilling.
Figure 1: Coober Pedy Project Location Plan showing major deposits in the area.
2
Unlike many other IOCG targets where the cover is over 500m thick, the Coober Pedy targets
have a relatively thin sedimentary cover of between 50m to 150m. Modelling of geochemical
data, Induced Polarisation (IP), gravity and magnetic data have been applied to optimise the
drill sites.
The IP survey completed in 2025 was designed to test large-scale, semi-coincident gravity and
magnetic anomalies that are considered priority targets for IOCG-style mineralisation.
Historical drilling (two wide-spaced diamond drill-holes) intersected strong potassic alteration
within the eastern-most drill-hole (GAW_RC01), suggesting the presence of nearby IOCG-
style mineralisation.
Two IP targets with weak to moderate chargeabilities and associated low apparent resistivities
were outlined by the IP survey, highlighting the possibility of disseminated sulphide source
rocks. Modelling suggests that the source rocks occur at depths of ~250m to 500m.
Compilation of the IP results with the available gravity and magnetic data indicates that the IP
targets are semi-coincident with discrete gravity highs (~2 milligals) that occur adjacent to the
interpreted Elizabeth Creek Fault zone (Figure 2).
Figure 2: Magnetic (1VD) Image, gravity contours and location of IP targets in relation to interpreted
structures.
AusQuest’s Managing Director, Graeme Drew, said drilling represents the next key step for
this highly prospective target area.
“The Coober Pedy Project has a great address – being located at the northern end of a world-
class IOCG Province which hosts the world-class Olympic Dam, Carrapateena and Prominent
Hill deposits.
“We are now in the testing phase to advance these highly prospective targets and look forward
to reporting on results when they become available.”
3
Figure 3: Reverse Circulation (RC) drilling rig on site at Coober Pedy drilling the priority IOCG targets.
Graeme Drew
Managing Director Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining
and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as a
Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in the report of
the matters based upon his information in the form and context in which it appears.
NO NEW INFORMATION
To the extent that this announcement contains references to prior exploration results which have been cross
referenced to previous market announcements made by the Company, unless explicitly stated, the Company
confirms that it is not aware of any new information or data that materially affects the information included in the
relevant market announcements.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on management’s
beliefs, opinions and estimates as of the dates the forward looking statements are made and no obligation is
assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect
other future developments.
Share your feedback
Discover