Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
Visit Investor Hub for a video update
March 2025 Quarterly Activities Report
HIGHLIGHTS
Peru – Copper-Gold
❑
New large-scale porphyry copper-gold system confirmed by maiden drilling at the
Cangallo Project in southern Peru, close to infrastructure and within 10km of the coast.
❑
Significant intercepts include:
•
•
•
•
•
•
•
•
348 metres @ 0.26% Cu, 0.06 ppm Au from 6m (CANRC001)
188 metres @ 0.28% Cu, 0.07ppm Au from 214m (CANRC002)
154 metres @ 0.37% Cu, 0.06 ppm Au from 36m (CANRC003)
136 metres @ 0.24% Cu, 0.06ppm Au from 230m (CANRC003)
226 metres @ 0.22% Cu, 0.07ppm Au from 4m (CANRC005)
136 metres @ 0.25% Cu, 0.06ppm Au from 22m (CANRC007)
121 metres @ 0.26% Cu, 0.04ppm Au from 256m (CANRC007)
304 metres @ 0.30% Cu, 0.06ppm Au from 34m (CANRC008)
❑
Mineralisation occurs from near-surface and is open in all directions including at depth,
demonstrating the potential for a shallow copper oxide resource as well as deeper sulphide
mineralisation.
❑
Pathfinder elements and copper distribution within the host volcanics suggests that the
centre of the porphyry system is located beneath the cover, to the west and south of current
drilling.
❑
Higher copper grades (up to 1.1% Cu) within thin tonalite porphyry dykes, coupled with
strong evidence for supergene enrichment, highlights the potential for increased copper
grades at the centre of the porphyry system.
❑
Stage 2 Reverse Circulation (RC) drilling (~5,000m) is expected to start in late May with
deep diamond and further RC drilling also planned for H2 CY2025.
❑
Drill permitting for the Lantana and Playa Kali Copper Projects has progressed through the
Mines Department (MINEM) and is currently with the SBN (National Supervisor of State
Assets) for surface access approval.
Australia – Copper, Zinc, Nickel, Gold, Iron
❑
At Balladonia, a major RC drilling program (~7,000m) commenced to test multiple
magnetic, gravity and electromagnetic (EM) targets for copper, lead and zinc
mineralisation similar to that found in the Broken Hill area of NSW. This project is funded
under the Strategic Alliance Agreement (SAA) with a subsidiary of South32 Limited
(South32).
❑
A major RC drilling program (~5,000m) to test five new magnetite targets at Morrisey was
planned under the SAA and will commence once the Balladonia drilling program has been
completed. Results will determine the overall magnetite resource potential of the project.
❑
At the Coober Pedy Project in South Australia (SA), a major IP survey was contracted to
commence in Q2 CY2025 to identify drill targets for iron-oxide copper-gold (IOCG)
mineralisation associated with magnetic and gravity anomalies.
❑
The Mt Davis Project in Western Australia (WA) was accepted by South32 under the SAA
as a new ‘Exploration Opportunity’ with drilling planned for later in 2025.
Corporate
❑
A Placement to institutional, sophisticated and professional investors successfully raised a
total of $7.5 million (before costs) to provide funds to accelerate drilling at the Company’s
recent copper-gold porphyry discovery at the Cangallo Project in southern Peru.
❑
Quarter-end cash position of ~$8.5 million, with additional funds expected in Q2 CY2025
under the SAA for the work program at Morrisey.
Figure 1: Project Locations – Australia and Peru.
OVERVIEW
During the March Quarter, assay results
received from the maiden drilling program at
the Cangallo Project in Peru were centre stage
for the Company, defining a significant new
greenfields copper-gold discovery. Planning
for further exploration at both the Peruvian
and Australian Projects was the key focus
during the Quarter, following a successful
Placement that raised sufficient funds ($7.5
million) to facilitate an active drilling
program in 2025.
In Peru, interpretation of drill results from the
Cangallo Project was completed following the
success of the maiden drilling program.
Modifications to drill permits were also made
given the Company’s enhanced understanding
of the geology and the need to optimise drill
sites ahead of Stage 2 drilling. Drill
permitting for the Lantana and Playa Kali
Prospects also continued so that drilling at
these prospects can take place in CY2025.
In Australia, planning for the upcoming drill
programs at Balladonia and Morrisey, plus
geophysical surveys at Coober Pedy and the
presentation of the Mt Davis results to
South32, were the main focus for the
Company during the March Quarter.
PERU COPPER-GOLD PROJECTS
AusQuest has assembled a strong portfolio of
copper-gold prospects along the southern
coastal belt of Peru in South America, with
numerous targets identified for drilling as
possible porphyry copper and/or replacement
style (manto) IOCG targets with size potential
being of significance to AusQuest (Figure 2).
Peru is one of the world’s most prominent
destinations for copper exploration and is
considered a prime location for world-class
exploration opportunities.
Figure 2: Project Locations – Southern Peru.
Cangallo Copper-Gold Project (100%
AQD)
The
Cangallo
Project
is
located
approximately 20km west of the Company’s
Cerro de Fierro Project in southern Peru,
along the same E-W structures that appear to
control the emplacement of potential
porphyry copper systems in the area. The
tenements, which cover an area of ~ 60km²,
are very well located, ~10km from the coast
and close to infrastructure, at an elevation of
between 500 and 1,200 metres. Geological
mapping and rock-chip sampling has
identified a partially exposed copper (+/gold) porphyry system within a large-scale
(minimum 3km x 2km) caldera-like structure
containing extensive colluvial and younger
sediment cover.
During the Quarter, assay results from the
maiden drilling program (eight RC drill-holes
for a total of ~3,000m) confirmed a new,
large-scale porphyry copper discovery with
broad zones of copper mineralisation in the
form of both oxides (malachite, chrysocolla
and brochantite) and sulphides (mainly
chalcocite and chalcopyrite) encountered
within seven of the eight holes drilled (ASX
releases 23 January, 6 February and 5 March
2025). Significant assay results are provided
in Table 1. Drill-hole locations and crosssections are provided in Figures 3, 4 and 5.
Figure 3: Cangallo Porphyry Copper Prospect showing drill-hole locations and significant intersections.
The vast majority of the copper and gold
mineralisation intersected by the maiden RC
drilling program occurs within the volcanic
host rocks (andesites and dacites). Copper
enrichment, veining and hydrothermal
alteration (potassic and sericitic) are
widespread, and are thought to reflect the
margins of a much larger porphyry system.
Tonalite dykes that are recognised at surface
and in the RC drill-holes are believed to
reflect the source of the hydrothermal fluids
and base metals, however the small number of
dykes is insufficient to explain the large
amount of alteration and widespread metal
distribution that is evident in the drilling,
highlighting excellent potential for a largescale intrusive stock nearby.
The presence of higher copper grades within
or proximal to these dykes suggests that there
is also excellent potential for the porphyry
stock to be more strongly mineralised.
The depth of oxidation is highly variable,
extending to more than 200 metres in several
drill-holes. There is strong evidence for
supergene processes being active in the area,
especially within drill-holes CANRC001,
003, and 008 – where copper is present as
oxide minerals near-surface – and high
copper/low sulphur minerals (e.g., chalcocite)
at depth.
The possibility of an enriched supergene
blanket with high copper grades occurring
beneath the extensive cover should not be
discounted.
Mineralogical studies have been initiated to
characterise the variability in copper species
with depth, in order to better understand the
impact on copper and gold recoveries.
Preliminary metallurgical test-work to
determine possible leachability of copper (+
gold) has also been initiated.
Table 1: Significant assay results from the maiden RC drilling program:
Hole Number From (m) To (m)
CANRC001
6
354 EOH
Including
10
26
Including
58
84
Including
252
264
Including
316
350
CANRC002
18
134
138
148
180
208
214
402 EOH
Including
222
234
Including
312
322
Including
342
380
CANRC003
Including
Including
Including
Including
Interval (m)
348
16
26
12
34
116
10
28
188
12
10
38
Cu %
0.26
0.43
0.36
0.53
0.39
0.19
0.48
0.18
0.28
0.5
0.43
0.40
Au ppm
0.06
0.08
0.07
0.27
0.08
0.04
0.07
0.04
0.07
0.07
0.09
0.09
Mo ppm
12
6
6
32
31
28
72
59
39
72
16
33
Ag ppm
0.31
0.09
0.57
1.09
0.44
0.08
0.03
0.58
0.38
0.67
0.41
0.46
36
40
86
128
146
190
76
110
138
190
154
36
24
10
44
0.37
0.37
0.42
0.42
0.47
0.06
0.05
0.06
0.06
0.08
18
15
12
15
33
0.19
0.07
0.12
0.39
0.25
230
366 EOH
136
0.24
0.06
36
0.28
Including
CANRC004
258
228
272
288
238
276 EOH
30
10
4
0.37
0.17
0.33
0.07
0.07
0.02
34
30
26
0.41
0.18
0.87
CANRC005
Including
Including
CANRC006
4
20
54
4
36
110
164
206
270
230
32
82
20
92
122
192
262
408 EOH
226
12
28
16
56
12
28
56
138
0.22
0.33
0.33
0.15
0.12
0.12
0.12
0.13
0.17
0.07
0.04
0.11
0.05
0.03
0.02
0.02
0.03
0.03
9
4
10
5
4
21
10
14
31
0.22
0.07
0.09
0.07
0.05
0.08
0.21
0.26
0.26
CANRC007
22
158
136
0.25
0.06
62
0.15
Including
138
150
12
0.43
0.07
111
0.51
Including
Including
256
264
352
377 EOH
298
364
121
34
12
0.26
0.36
0.48
0.04
0.03
0.08
43
37
69
0.32
0.32
0.44
CANRC008
Including
Including
Including
Including
34
36
120
186
216
338
64
176
206
234
304
28
56
20
18
0.30
0.56
0.40
0.33
0.35
0.06
0.03
0.06
0.08
0.08
18
11
12
25
20
0.05
0.06
0.34
0.29
0.40
350
414 EOH
64
0.23
0.05
20
0.20
380
394
14
0.37
0.10
23
0.31
Including
(Broad copper intervals were determined using a 0.1% Cu cut-off and an internal waste of 4 metres. Gold, molybdenum and silver
values were averaged over the same intervals as determined by the Cu intersections. Higher grade intervals (including) were
determined using 0.3% Cu cut-off and 4 metre internal waste intervals.)
Figure 4: Cangallo Drill Section showing RC drill traces with copper and gold grades to the right and left.
Figure 5: Cangallo Drill Section showing RC drill traces with copper and gold grades to the right and left.
Copper and gold mineralisation remains open
in all directions, including at depth. A variety
of geological and geochemical criteria
including tonalite dyke abundance, alteration
(potassic), pathfinder ratios (Cu/Zn, Mo/Mn),
spectral mineralogy (sericite) and white mica
composition (high temperature clays) suggest
that the centre of the buried porphyry system
is still to be found, and is located under the
shallow cover, outside of the current drill-hole
locations.
The maiden drilling program only tested a
very small fraction of the Cangallo prospect,
with geological mapping and rock-chip
sampling indicating a partially exposed
copper (+/- gold) porphyry system, within a
large-scale (3km x 2km) caldera-like
structure.
Stage 2 RC drilling (~5,000m) has been
designed to extend the original copper-gold
intersections by re-directing drill holes from
the original drill pads as well as stepping out
to the west, south and north to help locate the
centre of the porphyry system(s), which is
considered to be the source of the widespread
copper-gold mineralisation encountered to
date (ASX release 24 April 2025) (Figure 6).
Stage 2 drilling is expected to start in late
May 2025, with deep diamond drilling to test
the depth extent of the mineralisation, and
further RC drilling to test the more southerly
extensions of the porphyry system, being
planned for H2 CY2025.
Figure 6: Cangallo Copper Prospect showing planned Stage 2 RC drill-hole locations.
For Context, Peru is currently the second
largest copper producer in the world. The
bulk of this production comes from copper
porphyry deposits that are located along the
Andean Belt that extends from Chile in the
south to Ecuador in the north.
Porphyry deposits are typically large opencuttable resources with low waste to ore
ratios. The shallower parts of these deposits
are usually oxide ores that can be processed
by low-cost heap leach methods. The sulphide
ores, which can be very depth extensive, are
more expensive to process but can add
significantly to the size of a porphyry deposit.
There are a number of profitable large-scale
operations located within the Arequipa
District (where Cangallo is situated) that are
mining and processing ores with head grades
between 0.20% and 0.40% Cu.
Cerro de Fierro Copper Project (100%
AQD)
The Cerro de Fierro Project (CDF) is located
at the southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~150km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), which is being
developed by the Marcobre Joint Venture.
Surface indicators of porphyry copper
mineralisation have been identified within the
Pirata Project area, approximately 20km east
of Cangallo, associated with a major E-W
structure that is considered to be a priority
target zone for porphyry copper deposits
within the coastal belt of southern Peru.
During the Quarter, drill permits for 20 drill
pads designed to test the Lantana porphyry
copper prospect were approved by the Mines
Department (MINEM) and have now been
forwarded to the SBN (National Supervisor of
State Assets) for surface access, which is
expected to be approved within the next 2-3
months.
The Lantana prospect is considered to be a
high-priority porphyry copper target due to its
scale (~2,000m x 800m) and the widespread
occurrence of highly anomalous copper,
molybdenum and bismuth values obtained
from systematic rock-chip sampling programs
completed in 2023 (Figure 4) (Quarterly
Report, March 2023).
Figure 7: Lantana Porphyry Copper Prospect showing geology and surface sampling results and planned
drill-hole locations.
Playa Kali IOCG Project (100% AQD)
The Playa Kali Project is located ~10km east
of the town of Chala and ~120km south-east
of the Mina Justa copper deposit (~475Mt @
0.68% Cu). It consists of four mineral claims
covering an area of ~40km² and was acquired
after manto-style mineralisation (including
massive magnetite layers with patchy copper
and gold values) was located within a
sequence of sediments similar to those found
in the vicinity of the Marcona and Mina Justa
deposits to the north. Geological mapping,
rock-chip sampling and ground magnetic
surveys have been completed over the
tenements, defining target areas for further
exploration targeting manto-style copper-gold
deposits.
During the Quarter, drill permits for 20 drill
pads designed to test the Playa Kali IOCG
prospect were approved by the Mines
Department (MINEM) and have now been
forwarded to the SBN (National Supervisor of
State Assets) for surface access, which is
expected to be approved within the next 2-3
months.
At Playa Kali, numerous manto (Fe) outcrops
with visual evidence of copper mineralisation
have been located, providing strong evidence
for extensive manto development in the area.
Ground magnetic surveys have outlined a
number of targets beneath the extensive
cover, that are considered priority targets for
manto-style copper (and potentially gold)
mineralisation (Figure 5) (Quarterly Report
June 2024).
Figure 8: Playa Kali Prospect showing magnetic modelling, priority targets and planned drill pads.
Parcoy IOCG Project (100% AQD)
The Parcoy Project is located near the
southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~100km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), and ~50km northwest of the Company’s Cerro de Fierro
Project. Geological mapping and rock-chip
sampling
has
identified
significant
concentrations of copper (+/- gold) at
surface, reflecting potential manto-style
mineralisation
within
the
volcanic
stratigraphy.
The Company believes that there are copper
targets at Parcoy that were not tested by the
initial wide-spaced drilling programs and is
re-considering its options following the
encouraging results received from its
Cangallo Prospect, located ~40km to the
south-east.
New Opportunities (Peru)
The search for new copper opportunities has
been put on hold while the Company focuses
on its porphyry copper-gold discovery at the
Cangallo Project as well as several nearby
prospects where drilling permits are expected
shortly. These Projects have the potential to
significantly impact on the value of the
Company.
AUSTRALIA – BASE METAL
PROJECTS (Copper, Zinc, Nickel & REE)
Balladonia Nickel-Copper and REE
Project (100% AQD, subject to SAA)
The Balladonia Project is located ~50km
south of the Nova–Bollinger nickel-copper
deposit. It consists of 12 Exploration Licences
(six granted and six applications) covering an
area of ~1,400km² and is located within a
structurally complex region of the Fraser
Range Terrane. Exploration at Balladonia
has indicated potential for multiple
mineralisation styles with many priority
targets identified. This includes the potential
for nickel and copper mineralisation similar
to the Nova deposit, as well as iron-oxide
copper-gold (IOCG) and Broken Hill Type
(BHT) deposits similar to those found in the
Eastern Succession (NW Queensland) and in
NSW. More recently, the potential for rare
earth elements (REE) associated with
carbonatite intrusions has also been
recognised. Many of the tenements lie within
the Dundas Reserve. Exploration work at
Balladonia is funded under the SAA.
During the Quarter, access preparations were
completed and RC drilling commenced to test
magnetic and gravity targets along the Tea
Tree Trend for Broken Hill Type (BHT)
mineralisation and strong EM conductors
within the adjoining stratigraphy for their
base metal potential (ASX release 3rd April
2025).
The drill program, which consists of
approximately 35 holes for a total of
~7,000m, will provide systematic coverage
(600m x 200m) over the Tea Tree prospect
where Broken Hill type stratigraphy and
alteration has been identified by earlier
diamond drilling, as well as determining the
cause of the strong EM conductors defined by
ground EM follow-up of VTEM anomalies
(Figure 9).
Figure 9: Balladonia Magnetic Image showing cleared drill sites for the current RC drill program.
The program is expected to take
approximately six weeks to complete, with
initial assays likely to be available by late
May - early June 2025.
Drilling along the Tea Tree Trend (Lode
Sequence) is focused on the eastern half of the
Trend where magnetics suggests the presence
of more complex geology (tight folds and
faults), and gravity surveys have outlined
stronger anomalies. Previous drill results
indicate that anomalous lead values and
pathfinder geochemistry for Broken Hill Type
(BHT) deposits are also stronger in the
eastern half of the sequence.
Figure 10: Balladonia Gravity Image showing cleared drill sites for the current RC drill program.
The drilling program is focused outside of the
Dundas Nature Reserve, with approval to drill
priority targets within the Reserve being
subject to compliance with Management
Plans submitted to the Department of
Biodiversity Conservation and Attractions
(DBCA). It is expected that these targets
could be tested later in the year.
there is rail access to the Port of Geraldton,
some 80km away. Reconnaissance drilling to
test magnetic targets intersected coarse
grained magnetite which could be upgraded
via magnetic separation methods to a
premium iron product (>70%Fe) potentially
suitable for green iron smelting. Exploration
work at Morrisey is funded under the SAA.
Morrisey Magnetite, Nickel-Copper-PGE
Project (100% AQD, subject to SAA)
The Morrisey Project is located ~500km north
of Perth in Western Australia within Western
Australia’s Midwest mining district. The
project occurs within the high grade
metamorphic Narryer Terrane, which forms
the north-western margin of the Yilgarn
Craton. It consists of three granted
Exploration Licences and one application
covering an area of ~1,130km² and is located
~120km north of the town of Mullewa, where
During the Quarter, a reconnaissance RC
drilling program was designed to test
magnetic and gravity anomalies similar to
those found over the Waterfall prospect,
where earlier drilling had intersected coarsegrained magnetite which could be upgraded to
a premium iron product (>70% Fe), with
excellent magnetite recoveries (~34%), using
simple magnetic separation techniques.
A total of at least 22 RC drill-holes for
~5,000m has been planned to test an
additional five prospects in order to determine
the overall magnetite potential of the project,
and future commercial possibilities for the
region (Figure 11)
Figure 11: Morrisey Magnetite Project showing magnetic and gravity targets for drilling.
Further drill-holes have also been planned at
the Waterfall Prospect to test strike extensions
of the known magnetite mineralisation.
historic drilling (five holes) highlighted the
prospectivity of the area. Exploration work at
Coober Pedy is funded under the SAA
Drilling is expected to commence during Q2
CY2025 and will take several weeks to
complete. Davis Tube Recovery (DTR) test
work will be undertaken on all samples
containing coarse grained magnetite.
During the Quarter, a large scale Induced
Polarisation (IP) survey was planned in order
to identify sulphide targets ahead of possible
drilling later in the year. Heritage clearance
has been obtained for the survey which is
expected to commence around the middle of
May 2025 and take approximately six weeks
to complete.
Coober Pedy Copper-Gold Project (100%
AQD, subject to SAA)
The Coober Pedy Project is located ~15km
SW of the town of Coober Pedy, South
Australia, on the north-eastern margin of the
Gawler Craton, approximately 100km NW of
the Prominent Hill Copper Gold deposit. The
Project, which consists of one Exploration
Licence covering an area of ~170km², was
acquired to explore for iron-oxide coppergold (IOCG) deposits. Regional magnetic and
gravity data, plus analytical results from
The pole-dipole IP survey (~56-line kms) will
be conducted by GRS Pty Ltd using their
MIMDAS system to record both IP
(chargeability
and
resistivity)
and
magnetotelluric data along traverse lines
spaced 400m apart, using 200m dipoles to
provide IP coverage to depths of at least
500m below surface.
Figure 12: Coober Pedy IOCG Project showing planned IP coverage over magnetics and gravity.
Mt Davis Lead-Zinc-Copper Project (100%
AQD, subject to SAA)
The Mt Davis Project is located ~180km NNE
of Wiluna, Western Australia, along the
northern margin of the Earaheedy Basin. It
consists of two Exploration Licences (one
granted and one application) covering an
area of ~970km². The project was acquired
following the discovery of extensive zinc and
copper mineralisation by Rumble Resources
at its Chinook Prospect, located on the
southern side of the Basin, where
mineralisation is stratigraphically controlled
and located below the Frere Iron Formation.
The Mt Davis tenements are believed to
contain similar stratigraphy but in an area of
greater structural complexity which has been
reported as an important factor in the
localisation of higher grades at Chinook.
During the Quarter, the Mt Davis Project was
accepted as a new Exploration Opportunity
under the SAA with South32 (ASX release
2nd April 2025).
An RC drilling program has been designed as
a first step to test a combination of
electromagnetic
(VTEM)
and
soil
geochemical anomalies that are thought to
reflect conductive sediments prospective for
base metals occurring in a similar
stratigraphic position to the lead, zinc (+/copper) mineralisation discovered on the
southern side of the Basin.
The limited rock exposures at Mt Davis
means that drilling will be an integral part of
ongoing exploration. Drilling is expected to
take place in H2 CY2025, subject to heritage
clearances being obtained and drill rig
availability.
The Mt Davis Project is thought to reflect a
structural window into deeper parts of the
Earaheedy Basin or sub-basins, where the
potential for sediment-hosted Cu-Pb-Zn
deposits associated with a basin-wide
mineralising event are most likely to occur.
Figure 13: Mt Davis: Late Time VTEM Image showing soil anomalies and proposed RC drilling.
Jubilee Lake Nickel-Copper-PGE Project
(100% AQD, subject to SAA)
The Jubilee Lake Project is located ~500km
east of Kalgoorlie in Western Australia,
within the northern portion of the Eucla
Basin. It consists of three granted Exploration
Licences covering a total area of ~1,800km².
The Project is situated within a large flood
basalt terrane close to the south-eastern
margin of the Yilgarn Craton and is centred
over the Rodona Shear, which shows strong
evidence as being a key feeder structure to the
surrounding flood basalts. Mafic/ultramafic
intrusions associated with feeder structures to
flood basalt terranes are considered prime
targets for Ni-Cu-PGE sulphide deposits,
similar to those found at the giant Norilsk
deposits in Russia, and more locally at NeboBabel (BHP) and possibly at Nova-Bollinger
(IGO). Exploration work at Jubilee is funded
under the SAA.
Further field work at this project is still
pending advice from Central Desert Native
Title Services and the Traditional Owners
regarding proposed heritage clearance surveys
for drilling designed to test the Company’s
concept of a new nickel-copper province.
Hamilton Copper-Gold Project (100%
AQD)
The Hamilton Project is located in north-west
Queensland, ~120km south of the world-class
Cannington mine and ~70km south of the
Osborne copper mine. It consists of two
Exploration Licences covering an area of
~260km². Exploration is targeting iron oxide,
copper, gold (IOCG) and Broken Hill Type
(BHT) mineralisation beneath the extensive
cover in the region. Limited drilling
completed to date to test magnetic and gravity
targets, provides evidence for “near-miss”
situations which are the focus of the
Company’s exploration.
During the Quarter, the Company was advised
that the drilling proposal submitted to the
Queensland
Government
under
their
Collaborative Exploration Initiative program
to further test the Hamilton South prospect
had been successful.
Strong potassic, calcic and iron alteration
intersected by several of the Company’s
earlier drill-holes are thought to reflect
proximity to mineralisation beneath the
Eromanga Basin sediments that was not been
fully tested by earlier drilling programs.
Under the Funding Agreement, the Company
will receive up to ~$185,000 to help fund a
deep diamond drill-hole at Hamilton South to
be completed before the end of 2025.
Moora Nickel-Copper Project
Assay results from the recent RC drilling
program at Latham, which was designed to
locate prospective ultramafic rocks close to
the western contact of the Latham Intrusion,
failed to provide evidence for ultramafic
lithologies and /or mineralisation within the
intrusion.
Following discussions under the SAA,
AusQuest decided to surrender these
tenements to allow the Company to focus on
its higher priority projects.
New Opportunities (Australia):
include director salary and superannuation
payments of $54,750, and payments of
$12,000 for corporate consulting fees to a
director.
The Company advises that its appeal to the
Administrative Judiciary against payments
requested by the SBN (National Supervisor of
State Assets) for temporary access to StateOwned land for drilling purposes, is still with
the Supreme Court of Peru for leave to appeal
on the question of interpretation of the
relevant law. The Company continues to
monitor the position and will keep
shareholders advised of any significant
developments.
KEY ACTIVITIES – JUNE 2025
QUARTER
•
•
New opportunities within Australia continue
to be assessed by the Company’s consultants.
CORPORATE
During
the
Quarter,
the
Company
successfully raised a total of $7.5 million
(before costs) via a placement to institutional,
sophisticated and professional investors by
issuing a total of ~208.3 million fully-paid
ordinary shares in the Company at a price of
$0.036 per share, to accelerate drilling at the
Company’s recent porphyry copper-gold
discovery at the Cangallo Project in southern
Peru.
At the end of the March Quarter, the
Company had approximately $8.5 million in
cash after investing $1.35 million in
exploration. The Company expects to receive
additional funds from South32 during Q2
CY2025 to cover work programs in Australia
that have been agreed under the SAA.
The Company’s Cashflow Report (Appendix
5B) for the Quarter ended 30 December 2024
is appended to this report. Payments to related
parties as shown in Section 6 of this report
•
•
•
•
•
•
•
Balladonia
(Cu-Au-Ni-REE)
–
Complete RC drilling (~7,000m) to
test EM and BHT targets.
Morrisey (Magnetite) – Complete
access preparation and commence RC
drilling
(~5,000m)
to
test
magnetic/gravity targets.
Coober Pedy (Cu-Au) – Complete
MIMDAS IP survey (~56km) to test
for IOCG mineralisation.
Jubilee Lake (Ni-Cu-PGE) – Continue
Heritage clearance negotiations for
drilling.
Mt Davis (Cu-Pb-Zn) – Undertake
Heritage Clearance Surveys for RC
drill program.
Hamilton (Cu-Au) – Commence
access preparation for drilling later in
the year.
Peru (Cu-Mo-Au) – Complete ground
magnetics and Stage 2 RC drilling at
Cangallo.
Peru (Cu-Mo-Au) – Commence initial
test work for copper and gold
leachability from Cangallo drill
samples.
Peru (Cu-Mo-Au) – Complete drillpermitting for Lantana and Playa Kali
Copper Prospects.
Authorised for release on behalf of the Company by:
Graeme Drew
Managing Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr Graeme Drew, a
full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining and Metallurgy (AUSIMM)
and has sufficient experience in the activity which he is undertaking to qualify as a Competent Person as