MD Presentation - IMARC
Released
Released
Announcement PDF
October 2026
INVESTOR PRESENTATION
AUSQUEST LTD (ASX:AQD) | AUSQUEST.COM.AU
Forging New Growth in South
America’s Prosperous Copper Belt
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
INVESTMENT HIGHLIGHTS
A 100%-owned porphyry copper system drilled from surface to 800m depth, 8–10km from the Pacific coast
2
A large copper system in a coastal, low-elevation, low-cost setting, copper from surface
MAJOR COPPER DISCOVERY
A large, growing porphyry system
• 54 RC and 5 diamond holes,
25,000m drilled since December
2024
• Mineralisation continuous over
1.5km+ of strike, 250–500m wide
and to 800m depth
• Open along strike and at depth;
source porphyry not yet
intersected
DEVELOPMENT ADVANTAGE
Coastal. Low elevation. Copper from
surface
• 8–10km from the coast at 500–
1,200m elevation, on the Pan-
American highway
• First copper at ~10–50m depth;
oxide and supergene copper to
~300m
• Grid power corridor and potential
port access nearby
EARLY-STAGE
Still early on the discovery curve
• 25,000m drilled at 250–300m
spacing – large areas untested
• Regional peer Marimaca (Chile)
drilled ~135,000m to define its
oxide deposit¹
• Deep drilling shows evidence of a
strongly mineralised source
porphyry nearby (ASX 3 Sep 2026)
PEER CONTEXT
Coastal Belt development
• Coastal heap-leach projects
advancing: Tía María (under
construction)2, Marimaca (DFS;
construction decision pending) –
both oxide copper resources
• Lower capital and operating cost
environment
• Cangallo 100%-owned through a
wholly-owned Peruvian subsidiary
NEAR-TERM CATALYSTS
Active news flow ahead
• Stage 4 drill permits (MINEM)
received – RC and diamond
drilling of southern extensions
planned
• Stage 4 drilling to extend scale,
depth and porphyry centre(s)
• Metallurgical test-work on oxide
and supergene copper planned
for Q4 2026 – H1 2027
1.5km+
STRIKE LENGTH
25,000m
DRILLED TO DATE
555m
@ 0.26% Cu (CANDD002)
800m
VERTICAL DEPTH
100%
OWNED; OPEN AT STRIKE & DEPTH
¹ Marimaca Copper Corp corporate presentation, June 2026 – cumulative drilling at the Marimaca Oxide Deposit since 2016; not a like-for-like comparison. ² Tia Maria development: Reuters Oct 29 2025.
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
WHY COPPER, WHY NOW?
Record prices, a collapsing discovery pipeline and 17-year lead times increase the value of new copper discoveries
3
Record copper prices, and a discovery pipeline that has not kept pace with demand
Sources: LME cash settlement via Westmetall (record US$14,737/t on 8 Sep 2026; US$14,238.50/t on 11 Sep 2026); Bloomberg via Mining.com, 7 Sep 2026 (+17% over past year); BHP Insights, "How copper will shape our future", Sep 2024 (grade decline, demand to 2050); S&P Global, 8 Jan 2026 (17-year lead time; ~10Mt shortfall by 2040) and S&P Global
Market Intelligence major discoveries dataset 1990–2023 (Sep 2024); BloombergNEF, "Tracking Copper in Data Centers 2025–2035", Aug 2025; IEA, Mar 2026 (TC/RC); ICSG Copper Market Forecast, 27 Apr 2026. Chart: S&P Global Market Intelligence via Tribeca Investment Partners. Figures approximate and subject to revision by the sources.
US$14,737/t
LME cash record, 8 Sep 2026 (LME; US$14,239/t on 11
Sep)
+17%
LME copper price, 12 months to 7 Sep 2026
(Bloomberg)
–40%
Decline in average copper mine grade since 1991
(BHP, 2024)
~17 years
Average discovery-to-production for new copper
mines (S&P Global, Jan 2026)
DEMAND DRIVERS
• AI & data centres (BNEF)
• Grid & electrification
• Demand +70% by 2050 (BHP)
• ~10Mt/yr gap by 2040 (S&P)
SUPPLY IS CONSTRAINED
• Grades –40% since 1991
• 4 major finds in 2019–23 (S&P)
• ~17-year lead times
• TC/RCs at US$0/t (2026)
WHY DISCOVERY MATTERS
Few discoveries create meaningful new supply
• 239 copper deposits found 1990–2023; only 4 in the last five years (S&P)
• Grassroots exploration share at a record-low 28% (2023)
• Chile and Peru host ~44% of copper discovered since 1990
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0
20
40
60
80
100
120
140
160
180
US$bn
Mt
Cu
Major copper discoveries (Mt contained Cu) vs exploration budgets (US$bn)
Copper in major discoveries (Mt) Copper exploration budget (US$bn)
The near-term balance is contested – ICSG (Apr
2026) forecasts modest refined surpluses in 2026–27
– but the market is pricing the 2030s supply gap.
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
PERU - THE NEXT MAJOR INVESTMENT DESTINATION
A new pro-investment government, a US critical-minerals partnership and a US$64bn pipeline are re-rating Peru’s copper regions
US$33bn+
mining investment targeted over the 2026–
2031 term
240
exploration and mining projects to be
authorised in 2026
–40%
target cut in investment-project
processing times
US$61.8bn
mineral exports in 2025; mining is ~10% of
GDP
NEW GOVERNMENT, OPEN FOR BUSINESS
✓ New Government took office on 28 Jul 2026 on a
market-oriented, pro-investment platform
✓ About 100 mining permit requirements are under
review and 27 are already identified for removal
✓ The government says approvals will speed up without
lowering environmental standards
✓ New Government intent on providing predictable
and investor-friendly regulatory environment moving
forward
THE UNITED STATES IS LEANING IN
✓ US–Peru critical minerals MOU signed in Feb 2026, with
a joint working group to follow
✓ US DFC is seeking critical-minerals, energy and
infrastructure deals and will send a mission to Peru
✓ Secretary of State Rubio visited in Sep 2026 and
pointed to new mining opportunities
✓ Mines Minister expects greater US mining investment;
US and Chinese firms are both lining up
WHERE IT LANDS: SOUTHERN PERU
✓ ~70% of the US$64bn pipeline is copper; 45% sits in the
southern region, including Arequipa
✓ Southern Peru hosts Cerro Verde, Toquepala and
Mina Justa, with Tía María under construction
✓ Miners have stepped up engagement with the
ministry to revive stalled projects
✓ Cangallo sits 8–10km from the coast at 500–1,200m
elevation; Stage 4 permits have been received
Why it matters for Cangallo: Peru’s policy reset, US backing and a US$64bn pipeline all point at copper in the southern coastal region, where Cangallo is drilling.
Peru open for investment – and Cangallo sits in prime coastal copper region
Sources: Reuters / Mining.com, 20 Aug 2026 (US$33bn target, 240 projects); Reuters, 25 Sep 2026 (permit reform, US interest, 70% copper, ~US$7bn 2026 spend); Herbert Smith Freehills Kramer, 7 Jul 2026 (40% processing-time target, ~10% of GDP, US$61.8bn mineral exports 2025 per World Bank, impeachment context); Industrial
Info Resources, 4 Aug 2026 (nine presidents in ten years); US Department of State, 30 Jul 2026 (critical minerals MOU, DFC); MINEM Cartera de Proyectos de Inversión Minera 2026 (US$64bn, 45% southern region); company data (Cangallo). Peru’s mining and Investment guide 2026/2027 EY. Policy intentions are not yet delivered
outcomes.
4
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026 5
WHY CANGALLO IS DIFFERENT
A rare combination of location, near-surface copper and processing optionality
8–10km
DISTANCE TO COAST
500–1,200m
ELEVATION
~200–250m
OXIDE PROFILE, MIXED TO ~300m
250–300m
DRILL SPACING TODAY
Combines discovery scale with a coastal, low-elevation, low-cost setting that few large copper discoveries share.
DISCOVERY LOCATION
Coastal Peru
• 8–10km from the coastline; on the
Pan-American highway
• Good access to water
• Low elevation (500–1,200m)
• Existing power and road corridors
• Potential port access nearby (San
Juan; Matarani; new port)
Simpler logistics than remote, high-
altitude Andean projects
DEVELOPMENT PROFILE
Copper Starts Near Surface
• Mineralisation encountered from
surface
• First copper at ~10–50m depth
• Low strip ratio potential
• Oxide copper present over large
areas
Near-surface mineralisation can
materially influence future
development economics
PROCESSING OPTIONALITY
Oxide + Sulphide System
• Oxide to ~200–250m; mixed
oxide/secondary sulphide to
~300m
• Heap leach amenability to be
tested (Q4 2026 – H1 2027)
• Large underlying hypogene
sulphide system (>700m)
Creates multiple potential
development pathways as the
project advances
Sources: AusQuest ASX announcements (23 Jan 2025 – 3 Sep 2026) and Quarterly Reports; elevation and distances from Company project data. Oxide and supergene depths are geological logging observations; heap-leach amenability has not been tested. Drill spacing 250–300m; no Mineral Resource has been estimated.
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
Coastal, low-altitude projects are believed to carry among the lowest capital intensities in the Andes
6
LOCATION IS A CAPEX & OPEX ADVANTAGE
TYPICAL ANDEAN COPPER
PROJECT
• High altitude (3,000–4,500m)
• Remote logistics
• Water and land-use challenges
• Complex permitting environment
• Significant infrastructure
requirements
CANGALLO
ADVANTAGES
✓ Lower altitude than most Andean
projects
✓ Coastal logistics; access to water;
and Pan-American highway
✓ No competing land use at the
project site
✓ Grid power corridor nearby
✓ Potential port access
✓ Heap leach optionality (to be
tested)
Most large copper discoveries are remote and high-altitude. Cangallo combines scale potential with coastal setting
8–10km From Coast 500–1,200m Elevation
Grid Power
Corridor Nearby
No Competing
Land Use
Sources: AusQuest Company data (Cangallo elevation, distance to coast, infrastructure). Typical Andean project characteristics drawn from published studies of Los Azules (McEwen Copper FS, Oct 2025) and Quebrada Blanca 2 (Teck). Heap-leach amenability is untested; no development study has been completed.
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026 7
DISCOVERY GROWTH POTENTIAL
LARGE PORPHYRY COPPER SYSTEM THAT CONTINUES TO GROW
Copper is continuous over 1.5km+ of strike and to depths of more than 800 metres, and remains open along strike and at depth
• Copper is continuous within a north–south corridor extending
over 1.5km
• Broad zones (+200m) of +0.3% Cu are common, with multiple
intercepts grading +0.5% Cu
• Hypogene mineralisation continues to depths >700m;
CANDD003 ended in mineralisation at 880m
• High copper (+0.5% Cu) grades emerging in the north and
south – mineralisation open along strike and at depth
• Potential to grow the system and locate higher Cu grades
near surface and at depth – Stage 4 drill permits received
* Drilling and sampling results released to ASX on 30 Mar and 9 Nov 2023; 23 Jan, 6 Feb, 5 Mar, 21 Jul, 28 Aug, 30 Sep and 12 Nov 2025; 6 Jan, 11 Feb, 4 Mar, 6 and 29 May, 22 Jul, 20 Aug, 3 Sep and 20 Oct 2026, and Quarterly Reports. Intercepts are down-hole lengths (0.1% Cu cut-off, up to 6m internal waste); true widths are
not yet known. .
N
S
Cangallo growing with every drill program. Cu to expand south & north. New CSAMT targets add to the potential
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
A large discovery footprint is already defined, yet the system remains open and diamond drilling has extended it to 800m
8
* Drilling and sampling results released to ASX on 23 Jan, 6 Feb, 5 Mar, 21 Jul, 28 Aug, 30 Sep and 12 Nov 2025, 6 Jan, 11 Feb, 4 Mar, 6 and 29 May, 22 Jul, 20 Aug, 3 Sep and 20 Oct 2026, and Quarterly Reports. Intercepts are down-hole lengths (0.1% Cu cut-off, up to 6m internal waste); true widths are not yet known. Some drill-
hole traces are projected onto sections. ¹ Source: Marimaca Copper Corporation corporate presentation, June 2026 – cumulative drilling metres at the Marimaca Oxide Deposit since 2016. Not a like-for-like comparison (different deposit styles, jurisdictions and development stages); provided for illustrative context only.
DISCOVERY SCALE & GROWTH POTENTIAL
WHY THE DISCOVERY CAN GROW
✓ Open to north and south
✓ Open to east
✓ Open at depth (hypogene to >700m)
✓ Wide drill spacing (250–300m)
✓ Stage 4 drilling planned, permits received
DISCOVERY FOOTPRINT CONTINUES TO EXPAND
• Copper mineralisation remains open along strike and at depth
• Broad zones of +0.3% Cu are common, with multiple intercepts
above 0.5% Cu
• Diamond drilling has extended the system to 800m; CANDD003
ended in mineralisation at 880m
• Stage 4 is planned to test southern extensions and locate a
porphyry source(s)
Significant upside growth potential – large areas remain untested by drilling – 2 new targets identified
25,000m
AusQuest – drilled at Cangallo to date
~135,000m
Marimaca Copper Corp – drilled at the
Marimaca Oxide Deposit, since 2016¹
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
HIGHER GRADE ZONES EMERGING
Multiple higher-grade copper zones, near surface and at depth, indicate a fertile porphyry system
9
“Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.”
CANDD003
382m
CANDD002
379m
CANDD002
356m
* Drilling and sampling results released to ASX on 23 Jan, 6 Feb, 5 Mar, 21 Jul, 28 Aug, 30 Sep and 12 Nov 2025, 6 Jan, 11 Feb, 4 Mar, 6 and 29 May, 22 Jul, 20 Aug, 3 Sep and 20 Oct 2026, and Quarterly Reports. Intercepts are down-hole lengths (0.1% Cu cut-off, up to 6m internal waste); true widths are not yet known..
WHY IT MATTERS
✓ Multiple intersections + 0.5% Cu
✓ Higher-grade zones in RC and
diamond holes, north and south
✓ Bornite and chalcopyrite in
stockwork veins at depth
✓ Hypogene mineralisation to >700m
✓ Evidence for a strongly mineralised
source porphyry nearby
SELECTED HIGH-GRADE INTERCEPTS
HIGH GRADES AT DEPTH
Higher-grade zones near surface and at depth indicate fertility of the system and
support search for source porphyry(s)
CANRC048 12m @ 1.10% Cu, 0.01 g/t Au (112-124m)
CANRC008 10m @ 0.72% Cu, 0.03 g/t Au (36- 46m)
CANRC032 30m @ 0.60% Cu, 0.04 g/t Au (156m-186m)
CANRC012 68m @ 0.52% Cu, 0.10 g/t Au (36m-104m)
CANDD003 10m @ 0.56% Cu, 0.14 g/t Au (376-386m)
CANDD002 30m @ 0.50% Cu, 0.08 g/t Au (350-380m)
CANRC002 10m @ 0.57% Cu, 0.15 g/t Au (362-372m)
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026 10
DISCOVERY GROWTH POTENTIAL
NEW TARGETS HIGHLIGHTED BY GEOPHYSICAL SURVEY
• 2.5km x 1.0km porphyry system outlined
• Large portions of the mineralised footprint still to
be tested by drilling
• Two new target areas identified with resistivity
signatures similar to the main copper porphyry
system
• Drill coverage to be extended to cover targets
identified by CSAMT
• Potential to grow the system and locate higher
Cu grades near surface and at depth – Stage 4
drill permits received
* Drilling and sampling results released to ASX on 30 Mar and 09 Nov 2023; 23 Jan, 6 Feb, 5 Mar, 21 Jul, 28 Aug, 30 Sep and 12 Nov 2025; 6 Jan, 11 Feb, 4 Mar, 6 and 29 May, 22 Jul, 20 Aug 3 Sep and 6 Oct 2026, and Quarterly Reports. Intercepts are down-hole lengths (0.1% Cu cut-off, up to 6m internal waste); true widths are
not yet known. .
New targets identified - large areas of Cu mineralised footprint still to be tested by drilling – Stage 4 drilling permits received
New geophysical targets (1 and 2) have potential to significantly add to the Project’s copper inventory.
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
Work Program Oct Nov Dec Jan
Cangallo Porphyry Cu-Au
Stage 3 Diamond Drill Assays
Stage 4 RC and Diamond Drilling
Assays
Stage 4 Drill Permits
Metallurgical Test-work
Future Drill Permitting & Planning
Community & Government
LOOKING AHEAD
Drilling, assays, metallurgy and permitting are scheduled to deliver a steady flow of results.
.
.
.
.
.
.
11
Current Work Program
✓ Stage 3 diamond drilling testing depth extent &
grade of Cu sulphides in areas highlighted by RC
drilling - results pending
✓ Stage 4 drill permits received - additional 20 drill
pads focussed in the south
✓ Preparations being completed for multi drill rig
operation
✓ Metallurgical test-work on recovery profile
across resource
✓ Permits for detailed infill drilling being prepared
✓ Increased drilling intensity – with more pads to
come
✓ Potential to add to oxide resource and initial
read on depth extent of hypogene Cu
sulphides
✓ Better understanding of metallurgical and
mining/ process options
What will this deliver
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
CANGALLO INVESTMENT SUMMARY
Scale, near-surface copper, a coastal setting and a catalyst-rich programme
12
Scale
Large porphyry system: 1.5km+ strike, 250–500m wide,
800m deep, mineralization from surface
Growth Potential
Open along strike and at depth; source porphyry not
yet found; 60km+ prospective corridor; Geophysics
identifies additional targets
Grade
Broad intercepts of 0.23–0.38% Cu over 154–555m with
higher-grade zones to 1.10% Cu
Heap Leach Optionality
Oxide and supergene copper from surface to ~300m
– leach amenability to be tested Q4 2026 – H1 2027
Major Cost Advantage
Coastal environment, close to water, 500–1,200m
elevation, highway and grid power – potential for
lower-capital-intensity project
Catalysts
Stage 4 permits, drilling, metallurgy, and a pathway to
a maiden Mineral Resource
A Provincially significant copper discovery in Peru’s coastal copper belt
AUSQUEST LTD | ASX:AQD | AUSQUEST.COM.AU OCTOBER 2026
0
20,000,000
40,000,000
60,000,000
80,000,000
100,000,000
120,000,000
140,000,000
160,000,000
$0.000
$0.010
$0.020
$0.030
$0.040
$0.050
$0.060
$0.070
$0.080
$0.090
AQD
Share
Price
Volume
(shares
traded
per
day)
CORPORATE & MANAGEMENT OVERVIEW
An experienced board, a tight register and a ~A$74 million market capitalisation against a 100%-owned copper discovery
13
1) Includes 35.7 million options expiring at 30-Nov-26 ex $0.0300,
94.6 million options expiring at 11-Nov-27 ex $0.0120,
15 million options expiring at 11-Nov-27 ex $0.0160 &
20 million options expiring at 6-Feb-29 ex $0.0705
SIGNIFICANT SHAREHOLDERS
Directors 20.4%
Ita Vero Pty Ltd 4.59%
Top 20 (approx) 51.6%
CAPITAL STRUCTURE
ASX Code AQD
Shares on Issue 1,642.2 million
Options on Issue (listed) Nil
Options on Issue (unlisted)1
165.3 million
Market Cap. (at A$0.04) ~A$65.7 million
Cash (as at 30 June 2026) ~A$6.4 million
Enterprise Value ~A$59.3 million
Cangallo Discovery
KEY STAFF
Christopher Ellis
Non-Executive Director
Graeme Drew
Managing Director
Greg Hancock
Non-Executive Chairman
Michael Sherington
Chief Operating Officer – Peru
Enterprise value = market capitalisation less cash at 30 June 2026 (before September-quarter expenditure). Share price and volume chart: ASX daily data to 12 October 2026. Register data per Company records, October 2026.
Graeme Drew
Managing Director
8 Kearns Cres, Ardross, WA, 6153
Tel: +61 (8) 9364 3866
Email: graeme@ausquest.com.au
www.ausquest.com.au
Register here for
AusQuest’s InvestorHub
AUSQUESTLIMITED AUSQUEST-LIMITED
DISCLAIMERS
Important Notice
This presentation has been prepared by AusQuest Limited (ACN 091 258 023) (“AusQuest” or the “Company”). It is a summary only and does not purport to be complete. It is not a prospectus, product disclosure statement or
other offering document under the Corporations Act 2001 (Cth) or any other law, and it does not constitute an offer, invitation or recommendation to subscribe for or purchase any security. It does not take into account the
investment objectives, financial situation or needs of any person. Recipients should conduct their own investigation and obtain independent professional advice before making any investment decision. Neither the Company
nor its directors, officers, employees or advisers make any representation or warranty as to the accuracy or completeness of the information, and to the maximum extent permitted by law disclaim all liability arising from its
use.
Forward-Looking Statements
This presentation contains forward-looking statements, including statements about exploration plans, permitting, metallurgical test-work, potential development pathways and the copper market. Forward-looking statements
are not statements of historical fact and involve known and unknown risks, uncertainties and other factors, many of which are outside the Company’s control, that may cause actual results to differ materially. They are based
on management’s current beliefs and estimates and no obligation is assumed to update them. No development study of any kind has been completed for the Cangallo Project; any reference to processing routes, capital
intensity or operating costs of other projects is provided for context only and is not a representation about Cangallo.
Exploration Results, Mineral Resources and Exploration Targets
Cangallo is at an early exploration stage. The Company has not estimated a Mineral Resource or an Ore Reserve for Cangallo and has not declared an Exploration Target under the JORC Code (2012). Nothing in this
presentation should be construed as an Exploration Target or as an estimate of the quantity or grade of mineralisation. Drill intercepts are down-hole lengths; true widths are not yet known. Visual estimates of mineral
abundance are not a substitute for laboratory analyses. Statements regarding heap-leach amenability are conceptual: no metallurgical test-work or sequential copper assays have yet been reported.
Competent Person’s Statement
The information in this presentation that relates to Exploration Results is based on, and fairly represents, information compiled by Mr Graeme Drew, a full-time employee of AusQuest Limited and a Fellow of the Australasian
Institute of Mining and Metallurgy. Mr Drew has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the JORC Code (2012). Mr Drew consents to the inclusion in this presentation of the matters based on his information in the form and context in which they appear.
Previously Reported Information
Exploration results in this presentation were previously reported in the Company’s ASX announcements dated 23 January, 6 February, 5 March, 21 July, 28 August, 30 September and 12 November 2025 and 6 January, 11
February, 4 March, 6 May, 29 May, 22 July, 20 August and 3 September 2026, and in its Quarterly Activities Reports. The Company confirms that it is not aware of any new information or data that materially affects the
information included in those announcements.
Third-Party and Market Information
Copper market data, peer company data and project benchmarks are drawn from public sources identified on the relevant slide (company filings, exchange data, ICSG, S&P Global, BloombergNEF, BHP, MINEM and
others) as at the dates shown. The Company has not independently verified this information. Peer projects differ in stage, jurisdiction, deposit style, grade, metallurgy and infrastructure and are not directly comparable to
Cangallo; market capitalisations move daily and are shown for context only. All dollar amounts are Australian dollars unless otherwise stated.
Share your feedback
Discover