December 2025 Quarterly Activities Report
HIGHLIGHTS
Peru – Cangallo Copper-Gold Project
❑ Stage 3 Reverse Circulation (RC) drilling significantly increased the size of the porphyry
copper-gold system(s) at Cangallo, extending it more than 500 metres to the south, with
potential for further growth as drilling continues.
❑ Diamond drilling extended the known copper-gold mineralisation to depths of more than
800m, confirming the extensive nature of the porphyry system.
❑ Diamond drill-hole CANDD002 intersected 555 metres @ 0.26% Cu and 0.06g/t Au
from 5 metres depth, extending the higher-grade intersections from earlier drilling.
❑ Pending assay results from Stage 3 drilling will be used to guide the next stage of diamond
drilling.
❑ Permitting for Stage 4 RC drilling was initiated, with approvals expected around mid-
2026. Drill permits for the Lantana and Playa Kali copper prospects are imminent.
Australia – Copper, Zinc, Nickel, Gold, Iron
❑ At Balladonia, further drill programs to test for lead-zinc and copper-gold mineralisation
have been designed for consideration under the Strategic Alliance Agreement (SAA) with
a wholly-owned subsidiary of South32 Limited (South32).
❑ Further high-grade magnetite occurrences were confirmed at the Morrisey Project by Davis
Tube Recovery (DTR) test work, which achieved iron grades >70% Fe at four new
prospects, enhancing the future commercial potential of the Project.
❑ Drill testing of Iron-Oxide Copper-Gold (IOCG) targets at the Coober Pedy Project in
South Australia is expected to commence in Q2 CY2026.
❑ Reconnaissance drilling at Mt Davis (WA) provided early signs of base metal potential
associated with VTEM and soil geochemical anomalies.
Corporate
❑ The Company completed a successful Placement raising $10 million (before costs) to
expand the Stage 3 RC and diamond drilling at Cangallo.
❑ The SAA between AusQuest and a wholly-owned subsidiary of South32 Limited
(South32) was extended for a further two years to December 2027.
Figure 1: Project Locations – Australia and Peru.
OVERVIEW
During the December Quarter, AusQuest
continued to advance exploration activities at
the exciting Cangallo porphyry copper-gold
discovery in Peru. To this end, the Company
completed a $10 million placement to expand
and accelerate drill programs at Cangallo
following very encouraging results from its
earlier drill programs and the receipt of
additional drill permits. Stage 3 RC drilling
commenced during the Quarter.
In Australia, target definition for IOCG
mineralisation was completed at Coober Pedy
(SA) and a drilling program was designed.
DTR results for the Morrisey magnetite
project were received and target definition for
base metals continued at Balladonia (WA). A
maiden drilling program at Mt Davis (WA)
was also completed to help determine the
prospectivity of the project.
PERU COPPER-GOLD PROJECTS
AusQuest has assembled a strong portfolio of
copper-gold prospects along the southern
coastal belt of Peru in South America, with
numerous targets identified for drilling as
possible porphyry copper and/or replacement
style (manto) IOCG targets with size potential
being of significance to AusQuest (Figure 2).
Peru is one of the world’s most prominent
destinations for copper exploration and is
considered a prime location for world-class
exploration opportunities.
Cangallo Copper-Gold Project (100%
AQD)
The Cangallo Project is located
approximately 20km west of the Company’s
Cerro de Fierro Project in southern Peru,
along the same E-W structures that appear to
control the emplacement of potential
porphyry copper systems in the area. The
tenements, which cover an area of ~ 60km²,
are very well located, ~10km from the coast
and close to infrastructure, at an elevation of
between 500 and 1,200 metres. Geological
mapping and rock-chip sampling identified a
partially exposed copper (+/- gold) porphyry
system within a large-scale (minimum 3km x
2km) caldera-like structure containing
extensive colluvial and younger sediment
cover.
Figure 2: Project Locations – Southern Peru.
During the Quarter, diamond and Reverse
Circulation (RC) drilling significantly
expanded the scale of the porphyry copper-
gold system.
Preliminary visual inspection of drill-chips
from the first six RC drill-holes completed
late in the Quarter indicates that copper
oxides and sulphides are present in all drill-
holes to varying degrees, extending the strike
length of the mineralisation at least 500
metres to the south of the Stage 1 and 2
drilling, effectively increasing the size of the
overall porphyry system to more than 1.0
kilometre from north to south (Figure 3).
Copper continues to be identified in
stockwork veins and veinlets within the host
volcanics, but in some drill-holes there is
evidence of porphyry dykes that appear to be
mineralised. RC drill samples have been sent
to the ALS laboratory in Lima for analysis.
Initial assay results are expected in late
January – early February 2026.
(Cautionary Statement: Visual estimates of
mineral abundance should never be
considered a proxy or substitute for
laboratory analyses where concentrations or
grades are the factor of principal economic
interest. Visual estimates also potentially
provide no information regarding impurities
or deleterious physical properties relevant to
valuations.)
Initial diamond drilling (two holes in Stage 2
for a total of 1,630m) has been completed to
test the depth extent of the hypogene copper
(sulphide mineralisation) below the current
level of RC drilling, and to provide insights
into the geological relationships and controls
on the mineralisation.
Significant intersections from these drill-holes
are provided in the Table below. Drill-hole
locations are shown in Figure 4.
Figure 3: Cangallo Prospect showing location of completed and planned Stage 3 RC drill-holes.
Significant intersections from the diamond drill-holes include:
Hole Number From (m) To (m) Interval (m) Cu % Au ppm Mo ppm Ag ppm
CANDD001 212 220 8 0.11 0.02 53 0.08
284 294 10 0.12 0.02 43 0.41
430 442 12 0.12 0.03 55 0.20
458 478 20 0.14 0.03 55 0.20
546 624 78 0.17 0.04 27 0.33
662 676 14 0.12 0.02 51 0.20
686 830 EOH 144 0.15 0.04 30 0.29
CANDD002 5 560 555 0.26 0.06 16 0.36
including 32 68 36 0.38 0.11 5 0.06
120 130 10 0.5 0.08 22 0.40
350 380 30 0.5 0.08 19 0.63
406 426 20 0.42 0.08 16 0.57
456 480 24 0.40 0.08 27 0.37
500 522 22 0.41 0.11 26 0.82
542 556 14 0.44 0.11 21 1.02
580 610 30 0.19 0.07 45 0.34
622 664 42 0.17 0.04 16 0.30
Broad copper intervals determined using a 0.1% Cu cut-off and an internal waste of 6 metres.
Gold, molybdenum and silver values were averaged for same intervals as the copper intersections
Higher grade intervals (including) were determined using 0.3% Cu cut-off and 6 metre waste intervals and a
minimum 10m interval
Figure 4: Cangallo Porphyry Copper Prospect showing drill-hole locations and significant intersections.
The mineralisation occurs dominantly in
stockwork veins and veinlets within both the
andesitic and dacitic volcanics. Hypogene
copper (primary sulphides) is closely
associated with chlorite and
sericite/muscovite alteration within veins that
can be up to 2cm thick (Figures 5 and 6). The
amount of copper in the rock – and hence
grade – appears to be controlled by the
density of the mineralised veins within the
host volcanics.
Figure 5: Core photo from CANDD002 at 581m, showing mineralised vein within the host volcanics –
chalcopyrite (brassy yellow colour) and pyrite with chlorite and sericite within the central vein surrounded by
a potassic alteration selvage (quartz and K feldspar).
Figure 6: Core photo from CANDD002 at 379m, showing multiple vein sets within the host volcanics and
quartz sericite veins containing chalcopyrite (brassy yellow colour).
All drill-core has been orientated to obtain
structural measurements on the various vein
sets in order to provide vectors to the stronger
parts of the mineralised system where veining
is expected to be more intense. Up to four
different mineralised vein sets have been
identified. Structural interpretation of this
data is in progress to determine potential
vectors to the causative intrusions.
The presence of hypogene copper (sulphide
mineralisation) within stockwork veins and
fractures, accompanied by a variety of
mineral assemblages associated with
porphyry systems, provides evidence that a
strongly mineralised porphyry stock could
occur nearby.
These results provide strong evidence that
Cangallo could become a significant new
porphyry copper discovery with more drilling,
given its proximity to infrastructure and its
strategic location within 10km of the coast
(ASX releases 21st
July, 28th
August, 12th
November 2025 and 6th
January 2026).
Sequential copper assays have been initiated
for Stage 3 RC drill-holes to help determine
the leachability characteristics of copper
within the thick oxidised zone intersected
from surface. Results are pending.
Cerro de Fierro Copper Project (100%
AQD)
The Cerro de Fierro Project (CDF) is located
at the southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~150km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), which is being
developed by the Marcobre Joint Venture.
Surface indicators of porphyry copper
mineralisation have been identified within the
Pirata Project area, approximately 20km east
of Cangallo, associated with a major E-W
structure that is considered to be a priority
target zone for porphyry copper deposits
within the coastal belt of southern Peru.
During the Quarter, surface easement rights
for all planned drill pads and access tracks at
the Lantana porphyry copper prospect were
received with final approval for RC and
diamond drilling expected in Q1 CY2026.
Drill timing will be considered once all
approvals have been received.
The drill pads have been sighted to test a
porphyry copper prospect which is considered
to be a high-priority target, due to its scale
(~2,000m x 800m) and the widespread
occurrence of highly anomalous copper,
molybdenum and bismuth values obtained
from rock-chip sampling programs completed
in 2023.
Playa Kali IOCG Project (100% AQD)
The Playa Kali Project is located ~10km east
of the coastal town of Chala and ~120km
south-east of the Mina Justa copper deposit
(~475Mt @ 0.68% Cu). It consists of six
mineral claims covering an area of ~33km²
and was acquired after manto-style
mineralisation (including massive magnetite
layers with up to 1m thick bands of sulphides
containing anomalous copper and gold values
up to 1.9% Cu and 1 g/t Au), was located
within a sequence of sediments similar to
those found in the vicinity of the Marcona and
Mina Justa deposits to the north. Geological
mapping, rock-chip sampling and ground
magnetic surveys have been completed over
the tenements, defining target areas for
drilling targeting manto-style copper-gold
deposits.
During the Quarter, surface easement rights
for planned drill pads and access tracks were
received with final approval for RC and
diamond drilling expected in Q1 CY2026.
Drill timing will be considered once all
approvals have been received.
Numerous manto (Fe) outcrops with visual
evidence of copper mineralisation have been
located at Playa Kali, providing strong
evidence for extensive manto development in
the area. Ground magnetic surveys outlined a
number of targets beneath the cover that are
considered high priority for manto-style
copper (and potentially gold) mineralisation.
Parcoy IOCG Project (100% AQD)
The Parcoy Project is located near the
southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~100km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), and ~50km north-
west of the Company’s Cerro de Fierro
Project. Geological mapping and rock-chip
sampling has identified significant
concentrations of copper (+/- gold) at
surface, reflecting potential manto-style
mineralisation within the volcanic
stratigraphy.
No work was completed during the Quarter
while efforts were focused on the nearby
Cangallo Project. The Company believes that
there are copper targets at Parcoy that were
not tested by the initial wide-spaced drilling
programs and is re-considering its options for
the project.
AUSTRALIA – BASE METAL
PROJECTS (Copper, Zinc, Nickel & REE)
Balladonia Zinc-Copper (+/- Nickel and
REE) Project (100% AQD, subject to SAA)
The Balladonia Project is located ~50km
south of the Nova–Bollinger nickel-copper
deposit. It consists of 12 Exploration Licences
(six granted and six applications) covering an
area of ~1,400km² and is located within a
structurally complex region of the Fraser
Range Terrane. Exploration at Balladonia
has indicated potential for multiple
mineralisation styles with many priority
targets identified. This includes the potential
for nickel and copper mineralisation similar
to the Nova deposit, as well as iron-oxide
copper-gold (IOCG) and Broken Hill Type
(BHT) deposits similar to those found in the
Eastern Succession (NW Queensland) and in
NSW. More recently, the potential for rare
earth elements (REE) associated with
carbonatite intrusions has also been
recognised. Many of the tenements lie within
the Dundas Reserve. Exploration work at
Balladonia is funded under the SAA.
During the Quarter, assessment of the multi-
element geochemical data from the 2025 RC
drilling program was completed and new drill
targets were identified.
The 2025 drilling program focused to the
north of the Dundas Nature Reserve (DNR)
and provided a greater understanding of the
geology and geochemistry of the Tea Tree
Trend, confirming the presence of anomalous
lead associated with quartz-garnet-magnetite
(QGM) rocks in the eastern half of the
sequence, and identifying a copper-iron
hydrothermal signature proximal to the
faulted western contact of the Tea Tree
sequence, at the western end of two drill
sections.
Drill-holes 25BDRC020 and 25BDRC037
intersected thick intervals (>28m) containing
anomalous bismuth (up to 48ppm Bi),
molybdenum (up to 46ppm Mo), tellurium
(up to 8.9ppm Te), +/- silver (up to 1.5gpt
Ag) and gold (up to 135ppb Au) with
associated copper values (up to 990ppm Cu)
within drill-hole 25BDRC020 (Figures 6, 7).
Both anomalous intervals are open to the
west, with further drilling planned along these
sections in order to test the potential for
copper and gold mineralisation closer to the
faulted western contact of the Tea Tree Trend.
Figure 7: Balladonia Knee Prospect: NE drill section showing anomalous Bi and Cu in relation to the
magnetic model plus additional planned drill-holes.
Figure 8: Balladonia Tea Tree Prospect: southern drill section showing anomalous Bi and Cu in relation to
the magnetic model plus additional planned drill-holes.
Potential targets for Broken Hill Type (BHT)
lead zinc and/or IOCG mineralisation within
the DNR have also been identified for drill
testing based on interpretation of magnetic
and gravity data using data acquired from the
2025 RC drill program (Figure 9).
Priority has been given to structural sites
within and adjacent to the main Tea Tree
sequence.
Figure 9: Balladonia South: Magnetic Image showing target locations and planned drill-holes.
A proposal to drill up to ten targets within the
DNR is currently being considered under the
SAA.
A submission for exploration drilling and
possible geophysical surveys inside the
Dundas Nature Reserve will be prepared for
the Department of Biodiversity Conservation
and Attractions (DBCA) under the
Company’s Management Plan, once the drill
program is finalised.
Morrisey Magnetite, Nickel-Copper-PGE
Project (100% AQD, subject to SAA)
The Morrisey Project is located ~500km north
of Perth in Western Australia within Western
Australia’s Midwest mining district. The
project occurs within the high grade
metamorphic Narryer Terrane, which forms
the north-western margin of the Yilgarn
Craton. It consists of three granted
Exploration Licences and one application
covering an area of ~1,130km² and is located
~120km north of the town of Mullewa, where
there is rail access to the Port of Geraldton,
some 80km away. Reconnaissance drilling to
test magnetic targets intersected coarse
grained magnetite which could be upgraded
via magnetic separation methods to a
premium iron product (>70%Fe) potentially
suitable for green iron smelting. Exploration
work at Morrisey is funded under the SAA.
During the Quarter, Davis Tube Recovery
(DTR) test results from the reconnaissance
drilling program that tested six prospects with
magnetic and gravity responses similar to
those found over the Waterfall Prospect,
confirmed four of the prospects could produce
a premium iron product (>70% Fe) similar to
Waterfall (ASX release 17th
November 2025).
Magnetite in these prospects (Murchison,
Murchison South, Sandfly and Waterfall
North) occurs in high grade metamorphic iron
formation (IF) similar to that found at the
Waterfall Prospect, and could be upgraded to
>70% Fe using a coarse grind size (75um),
with magnetite recoveries averaging ~30%.
Magnetite within mafic host rocks (as at Deep
Bore and Bilga Rocks) was only upgradable
to ~65% Fe at the same grind size, and with
lower recoveries.
DTR test results for drill-holes at Waterfall
North, which is located ~2km north of the
Waterfall Prospect, provided the best results
with all three drill-holes intersecting relatively
thick IF (12m to ~100m) at shallow depths
(~40m down-hole) (Figure 10).
Figure 10: Waterfall Prospect showing drill hole locations and a drill cross section highlighting DTR test
results for the intervals sampled.
Modelling of gravity and magnetic data
associated with the IF magnetite prospects is
in progress to determine the potential size of
the combined magnetite resources identified
by the drill program.
The next steps in the evaluation of the
Morrisey Project are being considered under
the SAA.
Coober Pedy Copper-Gold Project (100%
AQD, subject to SAA)
The Coober Pedy Project is located ~15km
SW of the town of Coober Pedy, South
Australia, on the north-eastern margin of the
Gawler Craton, approximately 100km NW of
the Prominent Hill Copper Gold deposit. The
Project, which consists of one Exploration
Licence covering an area of ~170km², was
acquired to explore for iron-oxide copper-
gold (IOCG) deposits. Regional magnetic and
gravity data, plus analytical results from
historic drilling (five holes) highlighted the
prospectivity of the area. Exploration work at
Coober Pedy is funded under the SAA
During the Quarter, an RC drilling program
(~13 holes for a total of ~4,500m) was
finalised, to test a combination of geophysical
targets located close to the interpreted
position of the Elizabeth Creek Fault zone,
which is one of the regional structures
considered to be associated with the IOCG
mineralisation in the region.
Drilling is designed to provide an initial test
of four prospects:
• Jack Russell and Greyhound, where
potential sulphide mineralisation
partly coincident with gravity and
magnetic responses was inferred by
the IP survey;
• The Bulldog gravity/magnetic
prospect, which is located close to
historic drill-hole GAW_RC001 that
intersected potassic alteration
suggesting proximity to an IOCG
system; and
• The Basset Hound prospect, which is a
semi-coincident magnetic/gravity
target adjacent to the Elizabeth Creek
Fault (Figure 11).
Drilling is expected to commence in Q2
CY2026 once all approvals have been
received.
Figure 11: Coober Pedy Prospect showing targets defined by geophysical surveys and planned drill sites.
Mt Davis Lead-Zinc-Copper Project (100%
AQD, subject to SAA)
The Mt Davis Project is located ~180km NNE
of Wiluna, Western Australia, along the
northern margin of the Earaheedy Basin. It
consists of two Exploration Licences (one
granted and one application) covering an
area of ~970km². The project was acquired
following the discovery of extensive zinc and
copper mineralisation by Rumble Resources
at its Chinook Prospect, located on the
southern side of the Basin, where
mineralisation is stratigraphically controlled
and located below the Frere Iron Formation.
The Mt Davis tenements are believed to
contain similar stratigraphy but in an area of
greater structural complexity which has been
reported as an important factor in the
localisation of higher grades at Chinook.
Exploration work at Mt Davis is funded under
the SAA.
During the Quarter, assay results from the
reconnaissance RC drilling program (9 holes
for 1,884m) were received, highlighting the
potential for sediment-hosted base metal
mineralisation in the area (ASX release 23
December 2025).
The RC program was designed to provide an
initial test across a discrete electromagnetic
(VTEM) target thought to reflect a shallow-
dipping conductor within the sedimentary
sequence, bounded by regional structures and
associated with anomalous soil geochemistry
(Figure 12).
Three of the nine drill-holes returned
encouraging base metal values within the
weathered portion of the section, including:
18m @ 2,010ppm Pb and 583ppm Cu
(MDRC02), 24m @ 3,586ppm Pb and 0.47g/t
Ag (MDRC04) and 8m @ 9,485ppm Pb and
0.44g/t Ag (MDRC03), with a maximum lead
value of 2.8% Pb from 80m depth in
MDRC03 (Figure 13).
A detailed analysis of the multi-element
geochemistry has been initiated as well as
further modelling of magnetic data to help
determine the next steps at this prospect and
within the broader project area in consultation
with South32 under the SAA.
Exploration at the Mt Davis Project is
targeting sediment-hosted copper, lead and
zinc deposits similar to those found in north-
west Queensland.
Figure 12: Magnetic image showing RC drill-hole locations in relation to soil anomalies, major faults and the
VTEM target outline.
Figure 13: Mt Davis drill cross section 323400E showing anomalous lead and copper values.
Hamilton Copper-Gold Project (100%
AQD)
The Hamilton Project is located in north-west
Queensland, ~120km south of the world-class
Cannington mine and ~70km south of the
Osborne copper mine. It consists of two
Exploration Licences covering an area of
~260km². Exploration is targeting iron oxide,
copper, gold (IOCG) and Broken Hill Type
(BHT) mineralisation beneath the extensive
cover in the region. Limited drilling
completed to date to test magnetic and gravity
targets, provided evidence for “near-miss”
situations which are the focus of the
Company’s ongoing exploration.
During the Quarter, a proposal to undertake
further drilling at the Hamilton South
prospect was re-submitted to the Queensland
Government under their Collaborative
Exploration Initiative program. The Company
is awaiting feedback on this proposal.
New Opportunities (Australia):
New opportunities within Australia continue
to be assessed by the Company’s consultants.
CORPORATE
During the Quarter, the Company completed a
Placement comprising approximately 212.8
million fully-paid ordinary shares in the
Company at an issue price of $0.047 per share
to raise A$10 million (before costs). The
Placement was strongly supported by a range
of international and domestic institutional,
sophisticated and professional investors as
well as new and existing shareholders. Euroz
Hartleys Limited acted as Sole Lead Manager
to the Placement (ASX release 5th
December).
The SAA between AusQuest and a wholly-
owned subsidiary of South32 Limited
(South32) which was originally established in
February 2017, was extended for a further
two years to December 2027. The two
companies have developed a strong working
relationship over the past nine years and will
continue to work together to develop a
pipeline of high-potential exploration
opportunities focused in Australia. Targeted
commodities generally include copper and
zinc with potential for associated gold, and
silver credits.
At the end of the December Quarter, the
Company had approximately $9.9 million in
cash after investing ~$2.9 million in
exploration. The Company expects to receive
additional funds from South32 during Q1
CY2026 to cover work programs in Australia
that are agreed under the SAA.
The Company’s Cashflow Report (Appendix
5B) for the Quarter ended 31 December 2025
is appended to this report. Payments to related
parties as shown in Section 6 of this report
include director salary and superannuation
payments of $56,000, and payments of
$12,000 for corporate consulting fees to a
director.
The Company advises that its appeal to the
Administrative Judiciary against payments
requested by the SBN (National Supervisor of
State Assets) for temporary access to State-
Owned land for drilling purposes at the
Chololo Prospect has been dismissed. No
judicial collection proceedings have been
initiated and the final costs are not yet
determined. A similar case involving the
Cerro de Fierro project has been accepted by
the Supreme Court as being well-founded, but
the Court is yet to decide on the legality of
this case. The Company continues to monitor
the position and will keep shareholders
advised of any significant developments.
None of these activities effect the security of
the Company’s tenements.
KEY ACTIVITIES – MARCH 2026
QUARTER
• Peru (Cu-Mo-Au) – Complete Stage 3
RC drilling (+12,000m) at Cangallo
and commence diamond drilling of
deeper targets.
• Peru (Cu-Mo-Au) – Advance drill
permitting for Stage 4 RC drilling at
Cangallo (20 additional drill pads;
+50,000m RC/diamond drilling).
• Peru (Cu-Mo-Au) – Commence
geological and resource modelling at
Cangallo.
• Peru (Cu-Mo-Au) – Initiate further
early-stage metallurgical test work at
Cangallo
• Peru (Cu-Mo-Au) – Complete revised
drill-permitting for Lantana and Playa
Kali Prospects.
• Balladonia (Cu-Zn-Au) – Finalise next
phase of drilling and commence
access preparation.
• Morrisey (Magnetite) – Complete
assessment of DTR results and plan
next steps.
• Coober Pedy (Cu-Au) – Heritage
Clearance and access preparation for
RC drill program.
• Mt Davis (Cu-Pb-Zn) – Complete
assessment of drill results and plan
next steps.
Authorised for release on behalf of the
Company by:
Graeme Drew
Managing Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr Graeme Drew, a
full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining and Metallurgy (AUSIMM)
and has sufficient experience in the activity which he is undertaking to qualify as a Competent Person as defined in the December
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
Mr Drew consents to the inclusion in the report of the matters based upon his information in the form and context in which it
appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements concerning
mining reserves and resources may also be deemed to be forward looking statements in that they involve estimates based on
specific assumptions. Forward-looking statements are not statements of historical fact and actual events and results may differ
materially from those described in the forward looking statements as a result of a variety of risks, uncertainties and other factors.
Forward looking statements are based on management’s beliefs, opinions and estimates as of the dates the forward looking
statements are made and no obligation is assumed to update forward looking statements if these beliefs, opinions and estimates
should change or to reflect other future developments.
AusQuest Limited: Tenement Schedule as at 31 December 2025
Tenement Location
Interest Held:
Start of Quarter
Interest Held:
End of Quarter
Registered Holder
Australia
E69/3558 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3559 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3671 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3825 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3932 WA, Balladonia 100% 100% AusQuest Ltd.
E63/2486 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3859 ** WA, Jubilee Lake 100% Nil AusQuest Ltd.
E70/5383 WA, Morrisey Well 100% 100% AusQuest Ltd.
E09/2397 WA, Morrisey Well 100% 100% AusQuest Ltd.
E59/2526 WA, Morrisey Well 100% 100% AusQuest Ltd.
E69/3896 WA, Mount Davis 100% 100% AusQuest Ltd.
E69/4282 * WA, Mount Davis Nil 100% AusQuest Ltd.
EPM 26681 QLD, Hamilton 100% 100% AusQuest Ltd.
EPM 26682 QLD, Hamilton 100% 100% AusQuest Ltd.
EL 6798 SA, Coober Pedy 100% 100% AusQuest Ltd.
Peru
Cangallo 1 Arequipa 100% 100% Questdor SAC
Cangallo 2 Arequipa 100% 100% Questdor SAC
Cangallo 3 Arequipa 100% 100% Questdor SAC
Cangallo 4 Arequipa 100% 100% Questdor SAC
Cangallo 5 Arequipa 100% 100% Questdor SAC
Cangallo 6 Arequipa 100% 100% Questdor SAC
Cangallo 7 Arequipa 100% 100% Questdor SAC
Cangallo 7A Arequipa 100% 100% Questdor SAC
Cangallo 9 Arequipa 100% 100% Questdor SAC
Cangallo 10 Arequipa 100% 100% Questdor SAC
Cangallo 14 Arequipa 100% 100% Questdor SAC
Cangallo 15 Arequipa 100% 100% Questdor SAC
Cangallo 16 Arequipa 100% 100% Questdor SAC
Cerro De Fierro B Arequipa 100% 100% Questdor SAC
Cerro De Fierro C Arequipa 100% 100% Questdor SAC
Cerro De Fierro E Arequipa 100% 100% Questdor SAC
Cerro De Fierro F Arequipa 100% 100% Questdor SAC
Cerro De Fierro G Arequipa 100% 100% Questdor SAC
Cerro De Fierro H Arequipa 100% 100% Questdor SAC
Cerro De Fierro I Arequipa 100% 100% Questdor SAC
Cerro De Fierro J Arequipa 100% 100% Questdor SAC
Cerro De Fierro L Arequipa 100% 100% Questdor SAC
Cerro De Fierro N Arequipa 100% 100% Questdor SAC
Cerro De Fierro O Arequipa 100% 100% Questdor SAC
Cerro De Fierro P Arequipa 100% 100% Questdor SAC
Cerro De Fierro Q Arequipa 100% 100% Questdor SAC
Chololo 1 Moquegua 100% 100% Questdor SAC
Chololo 2 Moquegua 100% 100% Questdor SAC
El Sello 04 Arequipa 100% 100% Questdor SAC
AusQuest Limited Tenement Schedule as at 31 December 2025- cont’d
Tenement Location
Interest Held:
Start of Quarter
Interest Held:
End of Quarter
Registered Holder
Peru Cont.
Pa