Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
Visit Investor Hub for a video update
September 2025 Quarterly Activities Report
HIGHLIGHTS
Peru – Cangallo – Copper-Gold
❑ Cangallo porphyry copper-gold discovery continues to grow, with significant intersections
from broad-spaced Stage 2 Reverse Circulation (RC) drilling including:
• 324 metres @ 0.30% Cu, 0.07ppm Au (CANRC012) including:
160 metres @ 0.45% Cu and 0.09ppm Au
• 330 metres @ 0.30% Cu, 0.06ppm Au (CANRC014), including:
178 metres @ 0.40% Cu and 0.08 ppm Au
• 234 metres @ 0.30% Cu, 0.06ppm Au (CANRC013), including:
142 metres @ 0.39% Cu and 0.06 ppm Au
• 304 metres @ 0.30% Cu, 0.06ppm Au (CANRC008), including:
56 metres @ 0.40% Cu and 0.06ppm Au
• 154 metres @ 0.37% Cu, 0.06ppm Au (CANRC003), including:
44 metres @ 0.47% Cu and 0.08ppm Au
• 188 metres @ 0.28% Cu, 0.07ppm Au (CANRC002), including:
38 metres @ 0.40% Cu and 0.09ppm Au
• 348 metres @ 0.26% Cu, 0.06ppm Au (CANRC001), including:
34 metres @ 0.39% Cu and 0.08ppm Au
❑ Diamond drilling (two holes for ~1,600m) commenced at the end of the Quarter to test the
extent of copper sulphides below the current drilling limits, and to establish geological
controls on the mineralisation. Assay results expected around mid-December.
❑ Permits for Stage 3 RC drilling advanced, with drilling expected to commence in mid-to-late
November, testing the southern extension of the porphyry copper system.
❑ High copper values (>0.30% Cu) continue to be intersected from near surface to depths of
more than 300m, with most holes ending in mineralisation at the limit of the RC drill rig.
❑ Mineralisation now defined over an area of ~800m x 500m with further step-out drilling
planned for Q4 CY2025.
❑ Sericite alteration is closely associated with the copper mineralisation, highlighting the area
south of the current drilling as a priority target for additional oxide and sulphide copper
mineralisation.
❑ Copper intersected to date occurs within the volcanic host rocks and is often oxidised to
depths of more than 250 metres, indicating that copper could be recoverable by heap
leaching methods.
Australia – Copper, Zinc, Nickel, Gold, Iron
❑ At Balladonia, compilation of multi-element geochemical data with other datasets has
highlighted additional target areas for testing which will be subject to consideration under
the Strategic Alliance Agreement (SAA) with a wholly-owned subsidiary of South32
Limited (South32).
❑ Final Davis Tube Recovery (DTR) test results for the magnetite intersections at the
Morrisey Project (ASX report 29 July 2025) are expected around early November.
❑ At the Coober Pedy Project (SA), modelling of magnetic and gravity data identified several
target areas to be tested for Iron-Oxide Copper-Gold (IOCG) mineralisation.
❑ Drilling at the Mt Davis Project in WA commenced late in the Quarter, to test large-scale
VTEM targets and soil geochemical anomalies for their base metal prospectivity.
Corporate
❑ Quarter-end cash position of ~$3.8 million, with additional funds expected in Q4 CY2025
under the SAA for agreed work programs.
Figure 1: Project Locations – Australia and Peru.
OVERVIEW
During the September Quarter, a key focus
for the Company was receipt and
interpretation of the results received from
drilling at the Cangallo Project in Peru as
well as obtaining permits for further drilling
in order to continue expanding the drill
coverage over the new copper-gold discovery
announced in January 2025.
In Australia, target definition for base metals
continued at Balladonia (WA) and Coober
Pedy (SA), with drill preparations completed
at Mt Davis (WA) to enable drilling to
commence late in the Quarter. Results from
drilling at the Morrisey magnetite project
were still pending at the end of the Quarter.
PERU COPPER-GOLD PROJECTS
AusQuest has assembled a strong portfolio of
copper-gold prospects along the southern
coastal belt of Peru in South America, with
numerous targets identified for drilling as
possible porphyry copper and/or replacement
style (manto) IOCG targets with size potential
being of significance to AusQuest (Figure 2).
Peru is one of the world’s most prominent
destinations for copper exploration and is
considered a prime location for world-class
exploration opportunities.
Figure 2: Project Locations – Southern Peru.
Cangallo Copper-Gold Project (100%
AQD)
The Cangallo Project is located
approximately 20km west of the Company’s
Cerro de Fierro Project in southern Peru,
along the same E-W structures that appear to
control the emplacement of potential
porphyry copper systems in the area. The
tenements, which cover an area of ~ 60km²,
are very well located, ~10km from the coast
and close to infrastructure, at an elevation of
between 500 and 1,200 metres. Geological
mapping and rock-chip sampling identified a
partially exposed copper (+/- gold) porphyry
system within a large-scale (minimum 3km x
2km) caldera-like structure containing
extensive colluvial and younger sediment
cover.
During the Quarter, assay data from the Stage
2 Reverse Circulation (RC) drilling program
were received, significantly expanding the
area of porphyry copper-gold mineralisation
to ~800m x 500m in size, with the
mineralisation still open in multiple
directions, including at depth (Figure 3).
Figure 3: Cangallo Porphyry Copper Prospect showing drill-hole locations and significant intersections.
These results strongly suggest that Cangallo
could become a significant new porphyry
copper discovery with more drilling, given its
proximity to infrastructure and its strategic
location within 10km of the coast (ASX
releases 21st
July and 28th
August 2025).
Broad zones of mineralisation, including both
copper oxides and copper sulphides, have
now been reported from near-surface to the
bottom of hole (~350m depth) in at least 15 of
the 21 holes drilled to date. Copper occurs in
veins and fractures within the volcanic host
rocks and is often oxidised to depths of more
than ~250 metres, indicating that it could be
recoverable by heap leaching methods.
Significant assays received during the Quarter
are provided in Table 1 below with all drill-
hole locations shown in Figure 3.
Table 1: Significant assay results for drill-holes CANRC013 to CANRC021
Hole Number From (m) To (m) Interval (m) Cu % Au ppm Mo ppm Ag ppm
CANRC013 32 90 58 0.33 0.05 28 0.07
110 344 234 0.3 0.06 30 0.57
Including 36 88 52 0.35 0.05 28 0.05
110 252 142 0.39 0.06 20 0.76
CANRC014 32 362(EOH) 330 0.30 0.06 15 0.37
Including 34 212 178 0.40 0.08 15 0.44
CANRC016 278 292 14 0.14 0.02 38 0.09
CANRC017 10 50 40 0.14 0.08 12 0.06
74 112 38 0.18 0.08 48 0.31
122 144 22 0.23 0.12 45 0.23
174 254 80 0.27 0.01 43 0.60
276 426(EOH) 150 0.21 0.05 36 0.33
Including 174 196 22 0.37 0.08 39 0.95
218 234 16 0.37 0.06 18 0.62
312 324 12 0.33 0.07 37 0.33
CANRC018 14 56 42 0.2 0.02 18 0.07
CANRC019 12 96 84 0.16 0.05 28 0.38
106 420(EOH) 314 0.20 0.04 27 0.33
Including 154 170 16 0.35 0.06 17 0.22
196 230 34 0.30 0.04 19 0.05
CANRC021 2 158 156 0.16 0.05 10 0.14
192 384 192 0.17 0.07 21 0.26
Including 76 92 16 0.43 0.11 33 0.43
268 284 16 0.41 0.17 43 0.41
Broad copper intervals determined using a 0.1% Cu cut-off and an internal waste of 6 metres.
Gold, molybdenum and silver values were averaged for same intervals as the copper intersections
Higher grade intervals (including) were determined using 0.3% Cu cut-off and 6 metre waste intervals and a
minimum 10m interval
Higher copper grades shown in drill-holes
CANRC013 (142m @ 0.39% Cu) and
CANRC014 (178m @ 0.40% Cu) occur at
shallow depths within the oxide zone,
suggesting that a supergene enrichment
process may be active in at least parts of the
system.
Analysis of the multi-element geochemical
data from the drilling database suggests that
the copper mineralisation is closely associated
with late-stage sericite alteration.
Figure 4: Cangallo Prospect showing surface copper assays (LHS) and molybdenum assays (RHS) in
relation to Stage 1 and 2 drill programs as well as the planned Stage 3 drill-pads.
Rock-chip sample data, supported by recent
geological mapping, indicates that sericite
alteration is more widespread south of the
current drilling, highlighting this area as a
high-priority target for additional oxide
copper, with the possibility of locating the
centre of the porphyry system where higher
copper grades may occur. This is supported
by the highly anomalous copper (up to 0.6%
Cu) and molybdenum (up to 25ppm Mo)
values reported from rock chip sampling in
this area.
The Stage 3 RC drilling program, which is
planned to commence in late November
subject to receipt of final drilling permits, has
been designed to test this priority area (Figure
4).
Deep diamond drilling commenced late in the
Quarter within the currently drilled area to
test the depth extent of copper (and gold)
mineralisation below the limit of RC drilling
(~350m depth), and to provide a first look at
the geological controls on the mineralisation.
Assay results are expected in mid- December
(Figure 3).
Ground magnetic surveys were extended to
cover the project area using 100m spaced
traverse lines and continuous readings, to help
identify structures and potential alteration
effects within the volcanics that may be
related to the porphyry mineralisation.
Figure 5: Cangallo Prospect showing Total Magnetic Intensity Image relative to the interpreted area of
sericite alteration and various stages of drilling completed and planned.
Results suggest that most of the copper
intersected to date is associated with low
magnetic responses (red colours on Total
Magnetic Intensity (TMI) map), which appear
to be more prevalent south of the current drill
coverage, supporting the high drilling priority
(Stage 3) assigned to this area by
interpretation of the geochemical data (Figure
5).
Sequential copper assays have been initiated
for five of the Stage 1 and 2 RC drill-holes to
help determine the leachability characteristics
of copper within the thick oxidised zone
intersected from surface by the initial drilling
programs. Results are pending.
Cerro de Fierro Copper Project (100%
AQD)
The Cerro de Fierro Project (CDF) is located
at the southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~150km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), which is being
developed by the Marcobre Joint Venture.
Surface indicators of porphyry copper
mineralisation have been identified within the
Pirata Project area, approximately 20km east
of Cangallo, associated with a major E-W
structure that is considered to be a priority
target zone for porphyry copper deposits
within the coastal belt of southern Peru.
Final drill permits for 8 of the 20 drill pads at
the Lantana Prospect have been received, with
the remainder still pending. The drill pads
have been sighted to test a porphyry copper
prospect which is considered to be a high-
priority copper target due to its scale
(~2,000m x 800m) and the widespread
occurrence of highly anomalous copper,
molybdenum and bismuth values obtained
from rock-chip sampling programs completed
in 2023.
Playa Kali IOCG Project (100% AQD)
The Playa Kali Project is located ~10km east
of the town of Chala and ~120km south-east
of the Mina Justa copper deposit (~475Mt @
0.68% Cu). It consists of six mineral claims
covering an area of ~33km² and was acquired
after manto-style mineralisation (including
massive magnetite layers with up to 1m thick
bands of sulphides containing anomalous
copper and gold values up to 1.9% Cu and 1
g/t Au), was located within a sequence of
sediments similar to those found in the
vicinity of the Marcona and Mina Justa
deposits to the north. Geological mapping,
rock-chip sampling and ground magnetic
surveys have been completed over the
tenements, defining target areas for further
exploration targeting manto-style copper-gold
deposits.
During the Quarter, drill permits for 18 of the
20 drill pads were approved with the final
sign-off by MINEM expected shortly. These
pads were located to test several magnetic
targets for IOCG mineralisation.
Numerous manto (Fe) outcrops with visual
evidence of copper mineralisation have been
located at Playa Kali, providing strong
evidence for extensive manto development in
the area. Ground magnetic surveys outlined a
number of targets beneath the cover that are
considered high priority for manto-style
copper (and potentially gold) mineralisation.
Parcoy IOCG Project (100% AQD)
The Parcoy Project is located near the
southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~100km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), and ~50km north-
west of the Company’s Cerro de Fierro
Project. Geological mapping and rock-chip
sampling has identified significant
concentrations of copper (+/- gold) at
surface, reflecting potential manto-style
mineralisation within the volcanic
stratigraphy.
No work was completed during the Quarter
while efforts were focused on the nearby
Cangallo Project. The Company believes that
there are copper targets at Parcoy that were
not tested by the initial wide-spaced drilling
programs and is re-considering its options for
the project.
New Opportunities (Peru)
The search for new copper opportunities has
been put on hold while the Company focuses
on its porphyry copper-gold discovery at the
Cangallo Project, which has the potential to
significantly impact the value of the
Company.
AUSTRALIA – BASE METAL
PROJECTS (Copper, Zinc, Nickel & REE)
Balladonia Nickel-Copper and REE
Project (100% AQD, subject to SAA)
The Balladonia Project is located ~50km
south of the Nova–Bollinger nickel-copper
deposit. It consists of 12 Exploration Licences
(six granted and six applications) covering an
area of ~1,400km² and is located within a
structurally complex region of the Fraser
Range Terrane. Exploration at Balladonia
has indicated potential for multiple
mineralisation styles with many priority
targets identified. This includes the potential
for nickel and copper mineralisation similar
to the Nova deposit, as well as iron-oxide
copper-gold (IOCG) and Broken Hill Type
(BHT) deposits similar to those found in the
Eastern Succession (NW Queensland) and in
NSW. More recently, the potential for rare
earth elements (REE) associated with
carbonatite intrusions has also been
recognised. Many of the tenements lie within
the Dundas Reserve. Exploration work at
Balladonia is funded under the SAA.
During the Quarter, interpretation of the
multi-element geochemical data from the RC
drilling program completed during the June
Quarter continued.
The drilling program was semi-regional in
nature (600m x 200m), providing broad and
systematic coverage over the Tea Tree
magnetic/gravity trend, where prospective
host rocks for base metal mineralisation had
been identified by earlier diamond drilling
(ASX Release 10 June 2025).
Numerous intersections of banded iron
formation and garnet quartzite support the
concept of an extensive belt of prospective
host rocks for base metal mineralisation, as
these rocks are commonly associated with
Broken Hill Type (BHT) deposits found
elsewhere around the world.
Drilling was focused in areas with more
complex magnetic signatures (probably due to
structural complications) and increased
gravity responses, as these characteristics
were considered indicative of BHT
environments based on analogies with known
BHT deposits in NW Queensland and at
Broken Hill.
Figure 6: Balladonia magnetics and gravity images showing drill-hole locations and target areas.
Several of the target areas were found to
contain low levels of anomalous metals
(mainly lead and copper) which were often
associated with either manganese and/or
potassic enrichment. This is considered to be
indicative of nearby mineralisation.
Drill-hole cross-sections for key alteration
and pathfinder elements as well as anomalous
metals are currently being prepared to help
interpret the multi-element geochemical data.
Key cross-sections will be provided in future
ASX releases once they have been completed.
Several priority target areas for further
exploration have already been identified along
the same structural trend to the south of
current drilling, where structural
complexities, potential host rocks and gravity
targets have been interpreted (Figure 6).
A submission for exploration drilling and
geophysical surveys inside the Dundas Nature
Reserve is being prepared for the Department
of Biodiversity Conservation and Attractions
(DBCA) under the Company’s agreed
Management Plan.
Morrisey Magnetite, Nickel-Copper-PGE
Project (100% AQD, subject to SAA)
The Morrisey Project is located ~500km north
of Perth in Western Australia within Western
Australia’s Midwest mining district. The
project occurs within the high grade
metamorphic Narryer Terrane, which forms
the north-western margin of the Yilgarn
Craton. It consists of three granted
Exploration Licences and one application
covering an area of ~1,130km² and is located
~120km north of the town of Mullewa, where
there is rail access to the Port of Geraldton,
some 80km away. Reconnaissance drilling to
test magnetic targets intersected coarse
grained magnetite which could be upgraded
via magnetic separation methods to a
premium iron product (>70%Fe) potentially
suitable for green iron smelting. Exploration
work at Morrisey is funded under the SAA.
During the Quarter, Davis Tube Recovery
(DTR) test work on the numerous magnetite
intervals intersected by an earlier RC drilling
program continued. This test work is being
undertaken by Intertek Genalysis in Perth to
determine the overall magnetite potential of
the area and the future commercial
possibilities for the Project (ASX release 29th
July 2025). Final DTR test results have taken
longer than expected but should be available
around early November 2025.
RC drilling completed during the last Quarter
successfully extended the Waterfall Prospect
by up to 2km, as well as identifying
prospective magnetite rich units at a number
of the other prospects.
This program tested five new prospects with
similar magnetic and gravity responses to the
Waterfall Prospect where a premium
magnetite product (>70% Fe) could be
produced from a coarse grind size (106µm
and/or 75µm), highlighting the commercial
potential of the Project. The drill-holes were
reconnaissance in nature with between three
and five holes drilled per prospect, providing
an indication of the magnetite potential of
each prospect.
Coober Pedy Copper-Gold Project (100%
AQD, subject to SAA)
The Coober Pedy Project is located ~15km
SW of the town of Coober Pedy, South
Australia, on the north-eastern margin of the
Gawler Craton, approximately 100km NW of
the Prominent Hill Copper Gold deposit. The
Project, which consists of one Exploration
Licence covering an area of ~170km², was
acquired to explore for iron-oxide copper-
gold (IOCG) deposits. Regional magnetic and
gravity data, plus analytical results from
historic drilling (five holes) highlighted the
prospectivity of the area. Exploration work at
Coober Pedy is funded under the SAA
During the Quarter, computer modelling of
magnetic and gravity data was completed and
compiled with Induced Polarisation (IP)
anomalies, to help plan a potential drill
program to test a range of targets thought to
reflect the presence of IOCG mineralisation
(Figure 7).
Figure 7: Coober Pedy Prospect showing target areas defined by geophysical surveys.
Previous limited drilling on the prospect
suggested there was a near-miss situation in
drill-hole GAWRC001, which is close to at
least two of the targets identified by the
geophysical surveys.
Modelling of the IP/resistivity and magneto-
telluric (MT) data suggests that the cover
sequence is ~100m to 150m thick across
much of the area, suggesting that the
underlying magnetic, gravity and IP targets
could be tested by RC drilling (ASX release
17 July 2025). A program of RC drill-holes
has been designed to test three of the targets
subject to consideration under the SAA.
All targets occur adjacent to the interpreted
Elizabeth Creek Fault zone, which is one of
the regional structures considered to be
associated with the IOCG mineralisation in
the district. Drilling is planned to take place in
H1 2026 subject to heritage clearance
approval.
Mt Davis Lead-Zinc-Copper Project (100%
AQD, subject to SAA)
The Mt Davis Project is located ~180km NNE
of Wiluna, Western Australia, along the
northern margin of the Earaheedy Basin. It
consists of two Exploration Licences (one
granted and one application) covering an
area of ~970km². The project was acquired
following the discovery of extensive zinc and
copper mineralisation by Rumble Resources
at its Chinook Prospect, located on the
southern side of the Basin, where
mineralisation is stratigraphically controlled
and located below the Frere Iron Formation.
The Mt Davis tenements are believed to
contain similar stratigraphy but in an area of
greater structural complexity which has been
reported as an important factor in the
localisation of higher grades at Chinook.
Exploration work at Mt Davis is funded under
the SAA.
During the Quarter, heritage clearance
surveys were completed, allowing RC drilling
to commence late in the Quarter, to test the
source of an electromagnetic (VTEM)
anomaly and associated anomalous soil
geochemical responses interpreted to occur
within or below the Frere Formation
metasediments (ASX release 13th
October).
Drilling consists of 10 drill-holes for
~2,000m, with holes spaced at 200m intervals
along traverses 400m apart (Figure 8).
Drilling is expected to be completed around
the end of October, with assay data expected
within 4-6 weeks after completion of drilling.
Exploration at the Mt Davis Project is
targeting sediment-hosted copper, lead, and
zinc deposits similar to those found in north-
west Queensland. The RC drilling program
was designed as a first step in evaluating
several VTEM targets that are thought to
reflect priority base metal environments
within the Project area.
Figure 8: Mt Davis: Late Time VTEM Image showing soil anomalies and planned RC drill-holes.
The VTEM anomalies are thought to be
caused by conductive sediments occurring in
a similar stratigraphic position to the lead,
zinc (+/- copper) mineralisation (i.e. below
the Frere Iron Formation) discovered by
Rumble Resources Ltd at the Chinook
Prospect, on the southern side of the Basin.
The Mt Davis Project is thought to reflect a
structural window into deeper parts of the
Earaheedy Basin or sub-basins, where the
potential for sediment-hosted Cu-Pb-Zn
deposits associated with a basin-wide
mineralising event are most likely to occur.
Hamilton Copper-Gold Project (100%
AQD)
The Hamilton Project is located in north-west
Queensland, ~120km south of the world-class
Cannington mine and ~70km south of the
Osborne copper mine. It consists of two
Exploration Licences covering an area of
~260km². Exploration is targeting iron oxide,
copper, gold (IOCG) and Broken Hill Type
(BHT) mineralisation beneath the extensive
cover in the region. Limited drilling
completed to date to test magnetic and gravity
targets, provided evidence for “near-miss”
situations which are the focus of the
Company’s ongoing exploration.
During the Quarter, a decision was made to
defer a planned drilling program (a single
500m drill hole) until 2026 due to competing
priorities. The Queensland Government were
advised given that they had agreed to provide
funding assistance under the Collaborative
Exploration Initiative program.
Strong potassic, calcic and iron alteration
intersected by several of the Company’s
earlier drill-holes is thought to reflect
proximity to mineralisation beneath the
is legal, is now under consideration by the
Court. The Company continues to monitor the
position and will keep shareholders advised of
any significant developments.
KEY ACTIVITIES – DECEMBER 2025
QUARTER
• Peru (Cu-Mo-Au) – Complete
permitting and commence Stage 3 RC
drilling at Cangallo.
• Peru (Cu-Mo-Au) – Complete initial
diamond drilling (2 holes / 1600m) at
Cangallo
• Peru (Cu-Mo-Au) – Commence
further early-stage metallurgical test
work at Cangallo
• Peru (Cu-Mo-Au) – Complete drill-
permitting for Lantana and Playa Kali
Prospects.
• Balladonia (Cu-Au-Ni-REE) –
Complete assessment of RC drill data
and plan next steps.
• Morrisey (Magnetite) – Complete
DTR test work, assess results and plan
next steps.
• Coober Pedy (Cu-Au) – Complete
planning for drill testing IOCG targets
and commence Heritage clearance
process.
• Mt Davis (Cu-Pb-Zn) – Complete RC
drilling program and assess results.
Eromanga Basin sediments, which was not
fully tested by the earlier drill programs.
New Opportunities (Australia):
New opportunities within Australia continue
to be assessed by the Company’s consultants.
CORPORATE
At the end of the September Quarter, the
Company had approximately $3.8 million in
cash after investing ~$2.9 million in
exploration. The Company expects to receive
additional funds from South32 during Q4
CY2025 to cover work programs in Australia
that are agreed under the SAA.
The Company’s Cashflow Report (Appendix
5B) for the Quarter ended 30 September 2025
is appended to this report. Payments to related
parties as shown in Section 6 of this report
include director salary and superannuation
payments of $56,000, and payments of
$12,000 for corporate consulting fees to a
director.
The Company advises that its appeal to the
Administrative Judiciary against payments
requested by the SBN (National Supervisor of
State Assets) for temporary access to State-
Owned land for drilling purposes, has been
accepted by the Supreme Court of Peru, and a
decision on whether this request for payment
Authorised for release on behalf of the
Company by:
Graeme Drew
Managing Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr Graeme Drew, a
full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining and Metallurgy (AUSIMM)
and has sufficient experience in the activity which he is undertaking to qualify as a Competent Person as defined in the December
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
Mr Drew consents to the inclusion in the report of the matters based upon his information in the form and context in which it
appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements concerning
mining reserves and resources may also be deemed to be forward looking statements in that they involve estimates based on
specific assumptions. Forward-looking statements are not statements of historical fact and actual events and results may differ
materially from those described in the forward looking statements as a result of a variety of risks, uncertainties and other factors.
Forward looking statements are based on management’s beliefs, opinions and estimates as of the dates the forward looking
statements are made and no obligation is assumed to update forward looking statements if these beliefs, opinions and estimates
should change or to reflect other future developments.
AusQuest Limited: Tenement Schedule as at 30 September 2025
Tenement Location
Interest Held:
Start of Quarter
Interest Held:
End of Quarter
Registered Holder
Australia
E69/3558 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3559 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3671 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3825 WA, Balladonia 100% 100% AusQuest Ltd.
E69/3932 WA, Balladonia 100% 100% AusQuest Ltd.
E63/2486 * WA, Balladonia Nil 100% AusQuest Ltd.
E69/3859 WA, Jubilee Lake 100% 100% AusQuest Ltd.
E70/5383 WA, Morrisey Well 100% 100% AusQuest Ltd.
E09/2397 WA, Morrisey Well 100% 100% AusQuest Ltd.
E59/2526 WA, Morrisey Well 100% 100% AusQuest Ltd.
E69/3896 WA, Mount Davis 100% 100% AusQuest Ltd.
EPM 26681 QLD, Hamilton 100% 100% AusQuest Ltd.
EPM 26682 QLD, Hamilton 100% 100% AusQuest Ltd.
EL 6798 SA, Coober Pedy 100% 100% AusQuest Ltd.
Peru
Cangallo 1 Arequipa 100% 100% Questdor SAC
Cangallo 2 Arequipa 100% 100% Questdor SAC
Cangallo 3 Arequipa 100% 100% Questdor SAC
Cangallo 4 Arequipa 100% 100% Questdor SAC
Cangallo 5 Arequipa 100% 100% Questdor SAC
Cangallo 6 Arequipa 100% 100% Questdor SAC
Cangallo 7 Arequipa 100% 100% Questdor SAC
Cangallo 7A Arequipa 100% 100% Questdor SAC
Cangallo 9 Arequipa 100% 100% Questdor SAC
Cangallo 10 Arequipa 100% 100% Questdor SAC
Cangallo 14 * Arequipa Nil 100% Questdor SAC
Cangallo 15 * Arequipa Nil 100% Questdor SAC
Cangallo 16 Arequipa 100% 100% Questdor SAC
Cerro De Fierro B Arequipa 100% 100% Questdor SAC
Cerro De Fierro C Arequipa 100% 100% Questdor SAC
Cerro De Fierro E Arequipa 100% 100% Questdor SAC
Cerro De Fierro F Arequipa 100% 100% Questdor SAC
Cerro De Fierro G Arequipa 100% 100% Questdor SAC
Cerro De Fierro H Arequipa 100% 100% Questdor SAC
Cerro De Fierro I Arequipa 100% 100% Questdor SAC
Cerro De Fierro J Arequipa 100% 100% Questdor SAC
Cerro De Fierro L Arequipa 100% 100% Questdor SAC
Cerro De Fierro N Arequipa 100% 100% Questdor SAC
Cerro De Fierro O Arequipa 100% 100% Questdor SAC
Cerro De Fierro P Arequipa 100% 100% Questdor SAC
Cerro De Fierro Q Arequipa 100% 100% Questdor SAC
Chololo 1 Moquegua 100% 100% Questdor SAC
Chololo 2 Moquegua 100% 100% Questdor SAC
El Sello 04 Arequipa 100% 100% Questdor SAC
AusQuest Limited Tenement Schedule as at 30 September 2025- cont’d
Tenement Location
Interest Held:
Start of Quarter
Interest Held:
End of Quarter
Registered Holder
Peru Cont.
Parcoy 01 Arequipa 100% 100% Questdor SAC
Parcoy 02 Arequipa 100% 100% Questdor SAC
Parcoy 03 Arequipa 100% 100% Questdor SAC
Parcoy 04 Arequipa 100% 100% Questdor SAC
Parcoy 13 Arequipa 100% 100% Questdor SAC
Playa Kali 01 Arequipa 100% 100% Questdor SAC
Playa Kali 02 Arequipa 100% 100% Questdor SAC
Playa Kali 03 Arequipa 100% 100% Questdor SAC
Playa Kali 07 Arequipa 100% 100
Share your feedback