Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
Visit Investor Hub for a video update
June 2024 Quarterly Activities Report
HIGHLIGHTS
Australia – Copper, Zinc, Nickel, Gold
❑
Significant thicknesses of coarse-grained magnetite intersected in multiple drill-holes at
the Waterfall Prospect (Morrisey Project).
❑
Assays indicate the potential to delineate a magnetite resource capable of producing a
premium product (>70% Fe). Davis Tube Recovery (DTR) test work is now underway.
❑
At Balladonia, detailed gravity surveys commenced to identify drill targets along the
prospective Tea Tree Trend (15km), where strong indications of Broken Hill style
mineralisation have been identified by drilling.
❑
Electromagnetic (EM) surveys are planned at Balladonia to prioritise VTEM targets ahead
of further drilling. Surveys to commence in August.
❑
Approvals to further drill test the Latham Prospect (Moora Project) were received, with
drilling planned for Q4 2024.
Peru – Copper-Gold
❑
At the Cerro de Fierro IOCG prospect, drilling confirmed the continuity of copper (+/gold) mineralisation across the prospect with evidence for possible better grades at depth.
A full review is in progress.
❑
Recognition of outcropping manto copper mineralisation at the Playa Kali Project
upgraded this area to drill status. Drill planning is underway.
❑
Discussions (including site visits) continued with potential joint venture partners over the
Company’s copper projects in Peru.
Corporate
❑
Quarter-end cash position of ~$1.1 million, with additional funds of $962,000 received in
July for work programs at Balladonia, Morrisey and Moora under the Strategic Alliance
Agreement (SAA) with a subsidiary of South32 Ltd (South32).
Figure 1: Project Locations – Australia and Peru.
OVERVIEW
During the June Quarter, drilling was
completed at the Morrisey Magnetite Project
in Western Australia and at the Cerro de
Fierro Copper-Gold Project in Peru. Ground
geophysical surveys were planned and
contractors engaged to allow geophysical
surveys to commence at several projects in
Q3 2024.
In Australia, gravity and electromagnetic
surveys are expected to commence at
Balladonia in July and August to define
targets for Broken Hill Type (BHT)
mineralisation that could be drill tested later
in the year under the SAA with South32.
Geophysical surveys were also planned for
the Mt Davis and Coober Pedy Projects as
part of the initial assessment of their
prospectivity.
In Peru, the focus was on permitting for
drilling at three of the Company’s Copper
Projects – Cangallo (completed), Lantana (in
progress) Playa Kali (initiated). Discussions
continued with major companies who have
expressed interest in one or more of the
Company’s copper projects, with further site
visits being planned.
AUSTRALIA – BASE METAL
PROJECTS (Copper, Zinc, Nickel & REE)
Balladonia Nickel-Copper and REE
Project (100% AQD, subject to SAA)
The Balladonia Project is located ~50km
south of the Nova–Bollinger nickel-copper
deposit. It consists of 10 Exploration Licences
(six granted and four applications) covering
an area of ~1,200km² and is located within a
structurally complex region of the Fraser
Range Terrane. Exploration at Balladonia
has indicated the potential for multiple
mineralisation styles with many potential
targets identified. This includes the possibility
for nickel and copper mineralisation similar
to the Nova deposit as well as iron-oxide
copper-gold (IOCG) and Broken Hill Type
(BHT) deposits similar to those found in the
Eastern Succession (NW Queensland) and in
NSW. More recently, the potential for rare
earth elements (REE) associated with
carbonatite intrusions has also been
recognised. Many of the tenements lie within
the Dundas Reserve. Exploration work at
Balladonia is funded under the SAA.
During the Quarter, plans for a detailed
gravity survey (400m x 100m) to test along
the Tea Tree Trend (~15km) were finalised.
This area had been identified as being highly
prospective for BHT deposits by previous
drilling. Drill-holes 23BDDD019 and
23BDDD021, located along the northern
portion of the Tea Tree Trend, previously
intersected alteration and host rocks similar to
those found near the Cannington deposit in
NW Queensland and at Broken Hill in NSW.
Gravity surveying (400m x 100m) is also
planned to cover strong magnetic anomalies
immediately west of Tea Tree which are
thought to reflect the same magnetic
stratigraphy (banded iron formations (BIF)) as
occurs at Tea Tree (Figure 2).
Figure 2: Magnetic and Gravity data over the Balladonia Project showing planned survey outline
Integration of gravity and magnetic data will
be undertaken to outline priority target areas
for further drilling. Surveys commenced in
the second half of July and should be
completed in early August.
Ground electromagnetic (EM) surveys were
also planned to follow up bedrock conductors
located by the VTEM survey completed in Q4
2023. At least eight anomalies will be
surveyed. The conductors are discrete in
nature and have strong late-time VTEM
responses with anomalous time constant
values indicative of possible massive sulphide
mineralisation (Figure 3).
Ground EM surveys are scheduled to
commence in August and will take several
weeks to complete. A reconnaissance field
trip to each of the targets failed to find any
surface expression to explain the cause of
these anomalies.
The results of the ground EM surveys will be
used to prioritise targets for future drilling.
Figure 3: Magnetic and VTEM data over the Balladonia Project showing bedrock conductors planned for
ground survey work.
Morrisey Magnetite, Nickel-Copper-PGE
Project (100% AQD, subject to SAA)
The Morrisey Project is located ~500km north
of Perth in Western Australia within the
Narryer Terrane, which forms the northwestern margin of the Yilgarn Craton. It
consists of four granted Exploration Licences
(EL’s) covering an area of ~1,000km² parallel
to the Yilgarn Craton boundary. The
discovery of the Julimar nickel-copper-PGE
deposit, north of Perth, highlighted the
untested nickel-copper-PGE potential of this
Western Yilgarn Craton margin. Exploration
work at Morrisey is funded under the SAA.
Reconnaissance drilling at Morrisey has
intersected magnetite mineralisation with
encouraging metallurgical properties.
During the Quarter, Reverse Circulation (RC)
drilling was completed over the Waterfall (15
holes/3,060m), Bilga South (1 hole/228m)
and Toola (2 holes/362m) prospects,
confirming the presence of magnetite
mineralisation at Waterfall and Bilga South.
At the Waterfall Prospect, high average iron
grades (averaging 22-35% Fe) were recorded
within banded iron formation (BIF) over
thicknesses up to 116 metres. Low levels of
aluminium (0.7-2.7% Al), sulphur (0-1.6% S),
and phosphorous (0.03-0.06% P) suggest that
the BIF is a relatively clean sediment with
only small amounts of deleterious material
(ASX release June 12th 2024).
Subsequent petrographic work on selected
samples from 12 drill-holes across the
Waterfall prospect indicated that the
magnetite grains occur within layers with
quartz and amphibole as the other main
minerals.
Grain sizes vary up to a maximum of 2mm,
with magnetite grains having sharp
boundaries and internal fractures, which is
considered favourable for the separation of
magnetite from the other minerals using
magnetic separation methods and a grind size
of 75 micron (0.075mm) (ASX release 23rd
July 2024).
Figure 4: Waterfall Prospect: Gravity image showing the location of RC drill-holes and significant Fe
assays. Sections 1 and 3 are presented below as Figures 5 and 6.
Davis Tube Recovery (DTR) test work has
been initiated on 95 composite samples (6m10m composites) from the RC drilling
program in order to better understand the
potential recoveries and product grades across
the Waterfall Prospect that could be produced
through beneficiation. The samples were
selected on the basis of high Fe assay results
(>20% Fe) and high magnetic susceptibility
readings (>0.2 SI units).
Results from the DTR test work are expected
around the middle of August and will
determine the future direction of the project,
including drilling priorities. DTR test results
from the initial drill-hole (22MYRC001) at
Waterfall showed that a premium iron product
(>70% Fe) could be produced from the BIF in
this area (see ASX release – 24 January
2023).
The BIF at Waterfall has been intersected
over a strike length of ~750 metres, with the
mineralisation still open in all directions
(Figure 4). The mineralisation appears to have
a relatively shallow easterly dip (~30 to 45°)
and occurs below the depth of oxidation at
shallow depths (<50 metres) on most sections
drilled (Figures 5 and 6).
Initial RC drilling at the Bilga South and
Toola Prospects intersected magnetite
mineralisation but with a much finer grainsize, and within more mafic host rocks.
Composite samples from the Bilga South
drill-hole have been submitted for DTR test
work before considering further drilling at
this prospect. The results from the Toola
Prospect are not considered to be favourable
for beneficiation.
Figure 5: Waterfall Prospect: Section 1 showing down-hole magnetic susceptibility readings to the right and
Fe grades on the left of the drill trace. Zones shown in red have Fe grades >30% Fe.
Figure 6: Waterfall Prospect: Section 3 showing down-hole magnetic susceptibility readings to the right and
Fe grades on the left of the drill trace. Zones shown in red have Fe grades >30% Fe.
Jubilee Lake Nickel-Copper-PGE Project
(100% AQD, subject to SAA)
The Jubilee Lake Project is located ~500km
east of Kalgoorlie in Western Australia,
within the northern portion of the Eucla
Basin. It consists of three granted Exploration
Licences covering a total area of ~1,800km².
The Project is situated within a large flood
basalt terrane close to the south-eastern
margin of the Yilgarn Craton and is centred
over the Rodona Shear, which shows strong
evidence as being a key feeder structure to the
surrounding flood basalts. Mafic/ultramafic
intrusions associated with feeder structures to
flood basalt terranes are considered prime
targets for Ni-Cu-PGE sulphide deposits,
similar to those found at the giant Norilsk
deposits in Russia, and more locally at NeboBabel (Oz Minerals) and possibly at NovaBollinger (IGO). Exploration work at Jubilee
is funded under the SAA.
No field work was undertaken during the
Quarter, pending advice from Central Desert
Native Title Services and the Traditional
Owners regarding proposed heritage clearance
surveys for drilling designed to test the
Company’s concept of a new nickel-copper
province.
Moora Nickel-Copper Project (100% AQD,
subject to SAA)
The Moora Project is located ~150km north
of Perth, Western Australia, within the
Jimperding Metamorphic Belt, which forms
the south-western margin to the Yilgarn
Craton. It consists of two Exploration
Licences and covers an area of ~370km². The
area became the focus of industry attention
following the discovery of the Julimar nickelcopper-PGE deposit north of Perth, which
highlighted the untested nickel-copper-PGE
potential of the Western Yilgarn Craton
margin. Exploration work at Moora is funded
under the SAA.
An RC drilling program (two holes/~500m)
has been planned to test for magnetic
ultramafic rocks beneath the gabbro that was
intersected by the initial drill program. Fertile
ultramafic host rocks at the Julimar deposit,
north of Perth, are known to be strongly
magnetic, suggesting that similar magnetic
ultramafic rocks within the Latham Intrusion
would be priority targets for nickel-copperPGE mineralisation.
Communications with local landowners have
been maintained to facilitate access to the
planned drill sites later this year – in Q4 2024.
Hamilton Copper-Gold Project (100%
AQD)
The Hamilton Project is located in north-west
Queensland, ~120km south of the world-class
Cannington mine and ~70km south of the
Osborne copper mine. It consists of two
Exploration Licences covering an area of
~260km². Exploration is targeting iron oxide,
copper, gold (IOCG) and Broken Hill Type
(BHT) mineralisation beneath the extensive
cover in the region. Limited drilling
completed to date to test magnetic and gravity
targets, provides evidence for “near-miss”
situations which are the focus of the
Company’s exploration.
An application to renew the two Exploration
Licences for a further two-year period was
submitted to Government – with a response
pending.
At least one target has been identified at the
Hamilton South prospect, where strong
potassic, calcic and iron alteration has defined
a magnetic target that was not tested by the
original drilling.
Mt Davis Lead-Zinc-Copper Project (100%
AQD)
The Mt Davis Project is located ~180km NNE
of Wiluna, Western Australia, along the
northern margin of the Earaheedy Basin. It
consists of one Exploration Licence covering
an area of ~380km². The project was acquired
following the discovery of extensive zinc and
copper mineralisation by Rumble Resources
at its Chinook Prospect, located on the
southern side of the Basin, where
mineralisation is stratigraphically controlled
and located below the Frere Iron Formation.
The Mt Davis tenements are believed to
contain similar stratigraphy but in an area of
greater structural complexity which has been
reported as an important factor in the
localisation of higher grades at Chinook.
During the Quarter, a detailed VTEM Max
survey over key target areas commenced to
help identify potential base metal targets for
future exploration, including drilling. The
survey is part-funded (50%) under the WA
Government’s
“Co-Funded
Geophysics
Program”.
A total of ~ 900km of VTEM Max is planned
(Figure 7), using 200m spaced north-south
flight lines, with the EM sensor located below
the helicopter, at a height of ~35 metres above
ground level. Final results from this survey
should be available in August.
Detailed magnetics acquired by the Company
over the Mt Davis Project provided strong
evidence for the presence of either structurally
disjointed Frere Iron Formation or extensive
thick mafic intrusions, or both – which are
being targeted for base metals by the VTEM
survey.
Figure 7: Mt Davis Project: Detailed aeromagnetic image showing location of interpreted Frere Iron
Formation and/or mafic intrusions, structures and the VTEM Survey areas.
Coober Pedy Copper-Gold Project (100%
AQD)
The Coober Pedy Project is located ~15km
SW of the town of Coober Pedy, South
Australia, on the north-eastern margin of the
Gawler Craton, approximately 100km NW of
the Prominent Hill Copper Gold deposit. The
Project, which consists of one Exploration
Licence covering an area of ~170km², was
acquired to explore for IOCG deposits.
Regional magnetic and gravity data, plus
analytical results from historic drilling (five
holes) highlighted at least one drill-hole that
is considered to be proximal to IOCG-style
mineralisation.
During the Quarter, Native Title clearance
was obtained for an in-fill gravity survey over
the area where historic drilling had identified
potential
for
nearby
copper-gold
mineralisation similar to other deposits in the
region.
A total of ~600 gravity stations are planned
on a 400m x 100m grid, with the survey
scheduled to be completed in late August.
Gravity data will be integrated with available
magnetic data to help identify potential
targets for drilling.
New Opportunities (Australia):
New opportunities within Australia continue
to be assessed by the Company’s consultants.
PERU COPPER-GOLD PROJECTS
AusQuest has assembled a strong portfolio of
copper-gold prospects along the southern
coastal belt of Peru in South America, with
numerous targets identified for drilling as
possible porphyry copper and/or replacement
style (manto) IOCG targets with the size
potential being of significance to AusQuest
(Figure 8). Peru is one of the world’s most
prominent destinations for copper exploration
and is considered a prime location for worldclass exploration opportunities.
During the Quarter, the search for new joint
venture partners continued with companies
reviewing the Cerro de Fierro, Pirata,
Cangallo, Parcoy and Playa Kali Projects.
Several site visits were also undertaken.
Discussions with interested parties are
ongoing. If no reasonable offers are received,
the Company will consider drilling selected
porphyry and manto copper targets as part of
its ongoing exploration activities.
Figure 8: Project Locations – Southern Peru.
Cerro de Fierro Copper Project (100%
AQD)
The Cerro de Fierro Project (CDF) is located
at the southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~150km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), which is being
developed by the Marcobre Joint Venture.
Surface indicators of porphyry copper
mineralisation have been identified within the
Pirata Project area approximately 5km due
east of CDF, associated with a major E-W
structure that is considered to be a priority
target zone for porphyry copper deposits
within the coastal belt of southern Peru.
During the Quarter, an RC drilling program
(comprising four holes for a total of 1,012m)
was completed to test a recently identified
copper-gold structural target that had not been
previously drilled. Assay results from this
program confirmed the continuity of copper
mineralisation across the prospect, returning
similar results to those reported from earlier
drilling (Figure 9) – (ASX release 18th July
2024).
Several zones of copper (+/- gold and silver)
mineralisation were intersected within the
andesitic volcanics in three of the four holes
drilled (see Table 1).
Table 1: Significant intersections from the recent RC drilling program
Drillhole
CDFRC018
CDFRC019
CDFRC019
CDFRC021
From (m)
266
124
216
104
To (m)
276
136
248
132
Interval (m)
10
12
32
28
Drill-holes CDFRC018 and CDFRC019,
which were terminated in andesite, showed
increasing amounts of alteration and sulphides
(chalcopyrite and bornite) below depths of
~200m, suggesting mineralisation may be
improving with depth, close to the copper and
Cu %
0.32
0.19
0.15
0.21
Au g/t
0.08
0.18
0.08
-
Ag g/t
1.7
0.6
0.4
0.8
gold intersected in CDFDD003 (30m @
0.43% Cu, 0.16g/t Au; 43m @ 0.43% Cu,
0.35g/t Au; 28m @ 0.42% Cu, 0.15g/t Au and
33m @ 0.24% Cu, 0.13g/t Au) during an
earlier phase of drilling.
Figure 9: Cerro de Fierro Prospect showing historic diamond drilling results in black and intersections from
the current RC drilling program in red.
A compilation of the data collected within the
Cerro de Fierro IOCG prospect area has been
initiated to better understand the controls on
copper and gold mineralisation which are now
known to occur over a large area, to help
determine the future direction of this prospect.
Drill permitting at the nearby Lantana
prospect re-commenced. This prospect is
considered to be a high-priority porphyry
copper target due to its scale (~2,000m x
800m) and the widespread occurrence of
highly anomalous copper values obtained
from rock-chip sampling programs (Quarterly
Report, March 2023).
Cangallo Copper-Gold Project (100%
AQD)
The
Cangallo
Project
is
located
approximately 20km west of the Company’s
Cerro de Fierro Project in southern Peru,
along the same E-W structures that appear to
control the emplacement of potential
porphyry copper systems in the area. The
tenements, which cover an area of ~ 30km²,
are located at an elevation of 1,600 metres,
~10km from the coast, close to infrastructure.
Geological mapping and rock-chip sampling
has identified a partially exposed copper (+/gold) porphyry system within a large-scale
(5km x 2km) caldera-like structure containing
extensive colluvial and younger sediment
cover.
During the Quarter, detailed geological
mapping identified several phases of intrusive
diorites, the southern-most being mineralised
with surface copper values ranging from
500ppm Cu up to 0.25% Cu over an area of
~400m x 400m.
Areas of relatively intense veining (quartz),
which were found to occur within andesitic
volcanics marginal to the intrusives, often
contain higher copper values (up to 0.65%
Cu), with several mineralised samples from
narrow porphyrytic dykes suggesting the
possibility of a buried porphyry copper
target(s) beneath the cover sequence
surrounding the outcrops (Figure 10).
Figure 10: Cangallo Prospect showing geological mapping, surface copper values and permitted drill pads.
Drill permits are now in place to allow drill
testing for copper mineralisation beneath the
cover sequence and in areas of higher surface
copper to commence.
Playa Kali IOCG Project (100% AQD)
The Playa Kali Project is located ~30km east
of the town of Chala and ~120km east of the
Mina Justa copper deposit (~475Mt @ 0.68%
Cu). It consists of four mineral claims
covering an area of ~40km² and was acquired
after manto-style mineralisation (including
massive magnetite layers with patchy copper
and gold values) was located within a
sequence of sediments similar to those found
in the vicinity of the Marcona and Mina Justa
deposits to the north. Geological mapping,
rock-chip sampling and ground magnetic
surveys have been completed over the
tenements, defining target areas for further
exploration targeting manto-style copper-gold
deposits.
During the Quarter, a reconnaissance site visit
located manto (Fe-rich) outcrops closely
associated with magnetic responses that were
outlined by an earlier ground magnetic
survey.
These mantos occur within sediments that
underly andesite volcanics, which are thought
to be the host sequence for the strong
magnetic anomalies that occur several
kilometres inland, beneath cover (Figure 11).
Rock-chip sampling within outcropping areas
has highlighted anomalous copper values
ranging from 250ppm Cu up to 1.0% Cu
scattered throughout the area, some closely
associated with the outcropping mantos.
Anomalous gold values ranging from 25ppb
Au up to 210ppm Au, were also found to be
concentrated along the coastal areas where the
manto outcrops are more prevalent (see
Figure 12).
Figure 11: Playa Kali Prospect showing the relationship between manto (Fe rich) outcrops – stratigraphy
(sediments in blue, volcanics in green), surface copper and magnetic anomalies.
The coincidence of manto (Fe) outcrop with
magnetic responses near the coast suggests
the large complex of magnetic anomalies
several kilometres inland may reflect stronger
manto development with the possibility of
copper and/or gold mineralisation being
present.
Analogies with the Marcona (Fe) and Mina
Justa (Cu/Au) deposits, located ~120km to the
north-west, suggest that mantos within
volcanics (as at Mina Justa) are more likely to
contain copper mineralisation than mantos
within sediments (as at Marcona), suggesting
the magnetic complex outlined should be
regarded as a high-priority target for ongoing
exploration.
Modelling of the ground magnetic data has
been initiated to help prioritise targets for
further exploration, including drilling.
Figure 12: Playa Kali Photos showing manto (Fe rich) outcrops with copper mineralisation (green)
Parcoy IOCG Project (100% AQD)
The Parcoy Project is located near the
southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~100km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), and ~50km northwest of the Company’s Cerro de Fierro
Project. Geological mapping and rock-chip
sampling
has
identified
significant
concentrations of copper (+/- gold) at
surface, reflecting potential manto-style
mineralisation
within
the
volcanic
stratigraphy.
No field work was undertaken during the
Quarter. The Company believes there are
copper targets at Parcoy that were not tested
by the initial wide-spaced drilling programs
and is seeking a joint venture partner to
progress this project.
New Opportunities (Peru)
The search for new copper opportunities has
been put on hold while the Company seeks
suitable partners for its current projects.
CORPORATE
At the end of the June, the Company had
approximately $1.1 million in cash after
investing $1.556 million in exploration. In
early July, the Company received additional
funds of $962,000 (excluding GST) from
South32 to cover work programs agreed
under the SAA. Further funding under the
SAA is anticipated during H2 2024.
The Company’s Cashflow Report (Appendix
5B) for the Quarter ended 30 June 2024 is
appended to this report. Payments to related
parties as shown in Section 6 of this report
include director salary and superannuation
payments of $54,750, and payments of
$12,000 for corporate consulting fees to a
director.
The Company advises that its appeal to the
Administrative Judiciary against payments
requested by the Ministry of Housing (SBN)
for temporary access to State-Owned land for
drilling purposes, is still with the Supreme
Court of Peru for leave to appeal on the
question of interpretation of the relevant law.
The Company continues to monitor the
position and will keep shareholders advised of
any significant developments.
KEY ACTIVITIES – SEPTEMBER 2024
QUARTER
•
•
•
•
•
Balladonia
(Cu-Au-Ni-REE)
–
Complete gravity and ground EM
surveys to define targets for drilling
under the SAA.
Morrisey (Magnetite, Ni-Cu-PGE) –
Complete assessment of DTR results
at Waterfall, and Bilga South –
commence approvals for further
drilling.
Moora (Ni-Cu-PGE) – Complete
access preparations for RC drilling of
targets in Q4 2024.
•
•
•
Jubilee Lake (Ni-Cu-PGE) – Continue
with heritage clearance protocols for
drilling.
Mt Davis (Cu-Pb-Zn) – Assess VTEM
data and follow-up EM targets.
Coober Pedy (Cu-Au) – Complete
gravity survey to identify IOCG drill
targets.
Peru (Cu-Mo-Au) – Continue to
advance joint venture possibilities
over selected projects.
Peru (Cu-Mo-Au) – Commence drill
permitting for the Playa Kali and
Lantana prospects and access planning
for Cangallo drilling.
Authorised for release on behalf of the Company by:
Graeme Drew
Managing Director
Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr Graeme Drew, a
full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining and Metallurgy (AUSIMM)
and has sufficient experience in the activity which he is undertaking to qualify as a Competent Person as defined in the December
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
Mr Drew consents to the inclusion in the report of the matters based upon his information in the form and context in which it
appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements concerning
mining reserves and resources may also be deemed to be forward looking statements in that they involve estimates based on
specific assumptions. Forward-looking statements are not statements of historical fact and actual events and results may differ
materially from those described in the forward looking statements as a result of a variety of risks, uncertainties and other factors.
Forward looking statements are based on management’s beliefs, opinions and estimates as of the dates the forward looking
statements are made and no obligation is assumed to update forward looking statements if these beliefs, opinions and estimates
should change or to reflect other future developments.
JORC Code, 2012 Edition – Table 1 AusQuest Rock-Chip Sampling at Playa Kali in
Peru
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether core is oriented and if
so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries and results
assessed.
• Measures taken to maximise sample recovery and ensure representative nature
of the samples.
• Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
• Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
• Rock chip sampling comprises the collection of
rocks, usually by hammering an outcrop, with
samples being of variable size and quality.
• Sample locations are recorded by hand-held GPS.
• Samples were collected at intervals on an approx.
200m x 100m over areas of sub-crop with random
intervals over small isolated areas.
• Approximately 1.5 kg of rock was collected fr
Share your feedback
Discover