Early Drill Results Confirm Prospectivity at Balladonia
Released
Released
Announcement PDF
July 25th, 2023
EARLY DRILL RESULTS AT BALLADONIA CONFIRM PROSPECTIVE
TERRANE FOR BROKEN HILL TYPE DEPOSITS
•
•
•
Initial drilling of seven targets (10 holes for 3,677m) successfully completed.
Prospective host rocks for BHT mineralisation intersected in 7 of the 10 holes.
Potential Pb-Zn-Cd-Sn ‘lode horizon’ defined at the Tea Tree Prospect.
AusQuest Limited (ASX: AQD) is pleased to advise that its reconnaissance diamond drilling
program at the Balladonia Base Metal Project in the Fraser Range region of Western
Australia has been successfully completed. The Balladonia Project is subject to the Strategic
Alliance Agreement (SAA) with a wholly-owned subsidiary of South32 Limited.
The program was designed to provide an initial test of Broken Hill Type (BHT) geophysical
targets to confirm the base metal prospectivity of the region. Drilling was completed at seven
targets, including additional drilling (three holes for 1,411m) at the Tea Tree prospect, where
previous drill results indicated the presence of BHT host rocks (ASX release 30 June 2022).
Initial assay data have been received from the Tea Tree prospect (three drill-holes) with final
assays for the remaining six targets expected by the end of August.
Figure 1: Detailed magnetic and gravity surveys showing the location of drill-holes.
The targets tested were defined by a combination of detailed gravity and magnetic surveys
which outlined strong anomalies indicative of prospective host stratigraphy and potential
base metal mineralisation similar to that found in the Cloncurry Region of NW Queensland
(host to the Cannington deposit) and the Broken Hill area of NSW.
At the Tea Tree prospect, drilling along strike and beneath the initial drilled section
intersected prospective host rocks as defined by the presence of banded iron formations
(BIF’s) and garnetiferous quartzites. Preliminary interpretation of the assay data from drillholes 23BDDD018, 019 and 020 outlined a potential ‘lode horizon’ (~50m thick) within the
prospective host stratigraphy containing elevated values of lead (up to 507ppm Pb), zinc (up
to 1,258ppm Zn) cadmium (up to 32ppm Cd) and tin (up to 20ppm Sn) (Figure 2).
The inferred lode horizon – which could contain high grade base metal mineralisation along
its strike length – is interpreted to extend well beyond the limits of the current drill coverage
(possibly for kilometres) based on interpretation of the aeromagnetic and gravity data. This
provides a strong focus for ongoing exploration for BHT mineralisation in the area.
Assay data for drill-holes 23BDDD023 and 024 at the Half Way prospects and 23BDDD021
at Tea Tree North are still pending. Significant amounts of BIF stratigraphy were intersected
within all three holes, suggesting similarities with the Tea Tree prospect. A full assessment of
these prospects will be made once final assay results have been received.
Drilling at the Telegraph West prospect (23BDDD027) intersected a similar rock sequence to
Tea Tree, suggesting that the potential for BHT mineralisation is widespread within the
tenements. The presence of garnetiferous quartzites closely associated with BIF stratigraphy
is considered a strong indication of prospectivity for base metals in this environment. Assays
are pending.
At Telegraph East, drilling (drill-holes 23BDDD025 and 026) intersected a gabbroic (+/pyroxenite) rock with possible carbonatite affinities that may be related to the carbonatite
intrusion intersected at the Telegraph Prospect, ~5km to the west (ASX release 1 April
2020).
Drilling at the Halfway South prospect (drill-hole 23BDDD022) also intersected possible
carbonatitic rocks, suggesting that they may be widespread throughout the area.
2
Carbonatites can be a source of rare earth metals as well as base metal mineralisation. A
more complete assessment of the potential for carbonatites and associated metals will be
undertaken once all assay data are available.
AusQuest’s Managing Director, Graeme Drew, said: “Initial assay results from the Tea Tree
drilling support the presence of prospective host rocks for large-scale BHT style base metal
deposits at Balladonia within an extensive ‘lode package’ with a strong geochemical
signature. This gives us considerable encouragement that our exploration methodology is
correct and provides us with a clear direction for ongoing exploration, targeting base metals
in the area.
“We look forward to receiving the remaining assay data from the completed drilling program,
which will provide us with further insights into the geological comparisons being made with
productive base metal regions in NW Queensland and Broken Hill.”
Graeme Drew
Managing Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of
Mining and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as
a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in
the report of the matters based upon his information in the form and context in which it appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on
management’s beliefs, opinions and estimates as of the dates the forward looking statements are made and no
obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should
change or to reflect other future developments.
3
JORC Code, 2012 Edition – Table 1 report, Diamond Drilling at Balladonia Project
July 2023
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Drill core was sampled at 1 metre intervals. Four metre composite
samples were collected from the RC pre-collar samples.
• Where HQ and NQ2 core was sampled, core was cut in half with
half sent for analysis and half retained for geological and quality
control purposes.
• Sample intervals were measured by tape from depth intervals
shown on core blocks labeled by the drillers, as per standard
industry practice.
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
• Core recovery was determined by comparing core lengths measured
against drilled intervals shown on core blocks and recorded on the
logs.
• Experienced diamond drillers were engaged to ensure maximum
core recovery.
Drilling
techniques
Drill sample
recovery
1
• Diamond drilling with reverse circulation pre-collars through to
bedrock was used for all of the holes completed.
• HQ and NQ2 drill rods used to produce 63.5mm and 50.6mm
diameter core respectively.
• Down-hole surveys were read at ~ 30m intervals and the core was
oriented using an ACT MK3 orientation device
Criteria
JORC Code explanation
Commentary
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• Sample recovery was generally high, negating any sample bias due
to recovery.
Logging
• Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• Drill core and sample chips were logged by experienced geologists
to identify key rock types, alteration and mineralisation styles.
• Core logging is qualitative with visual estimates of mineralisation
made for later comparison with assay results.
• All core was logged and photographed.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/secondhalf sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
• Core samples were collected by cutting core in half along its length
and sampling over 1 metre intervals.
• Reverse Circulation pre-collar samples were collected by collecting
a scoop of sample from individual 1 metre samples and
compositing them over 4 metre intervals.
• The sample sizes are appropriate for the geological materials being
sampled.
Quality of assay
data and
laboratory tests
2
• Assaying of the drill samples is by standard industry practice.
• The samples are sorted and dried. The whole sample is crushed
then split by riffle splitter to obtain a representative sub-sample
which is then pulverized in a vibrating pulveriser.
• A portion of the pulverized sample is then digested and refluxed
using a four acid digest (Hydrofluoric, Nitric, Hydrochloric and
Perchloric) which approximates a total digest for most elements.
Some refractory minerals are not completely dissolved.
• Inductively Coupled Plasma Mass Spectroscopy (ICP-MS and/or
OES) is used to measure Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co,
Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P,
Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y,
Zn, and Zr.
• Gold values are provided by 25gm fire assay.
• Prepared Sample standards are inserted by the Company every 20
metres down hole to provide a control on laboratory processes.
Data from the laboratory’s internal quality procedures (standards,
Criteria
JORC Code explanation
Commentary
repeats and blanks) and AusQuest (standards, repeats and blanks)
are reviewed to check data quality.
• Assays are provided by Intertek Genalysis of 311 Kenwick Road
Maddington WA which is a certified laboratory for mineral
analyses.
• Analytical data is transferred to the company via email and by hard
copy.
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Assay results for only 3 of 10 holes have been received.
• Drilling is early-stage testing across stratigraphy and geophysical
targets to understand geology and implications for base metal
prospectivity of the region.
Data spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Angled drill holes were spaced at approximately 200m intervals at
the Tea Tree prospect to assess the bedrock geology across a
regional magnetic and gravity corridor. Elsewhere magnetic/gravity
targets were generally tested by a single drill-hole.
• Drill hole locations are provided below.
Orientation of
data in relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• The measures taken to ensure sample security.
• Any bias due to the orientation of the drilling is unknown at this
early stage of exploration.
Verification of
sampling and
assaying
Location of data
points
Sample security
3
• Drill hole collars including elevation are located by hand held GPS
to an accuracy of approximately 5m.
• Down hole surveys are carried out every ~30m down hole, and at
the end of the hole.
• All surface location data are in GDA 94 datum, zone 51S.
• Samples are collected into securely tied bags and placed into cabletied polyweave bags for transport to the laboratory. Each sample
batch has a sample submission sheet that lists the sample numbers
and the work required to be done on each sample.
• Reputable freight companies are used to transport samples to the
laboratory.
• Sample pulps (after assay) are held by the laboratory and returned
Criteria
JORC Code explanation
Commentary
to the company after 90 days.
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
• No reviews or audits of the sampling techniques or data have been
carried out to date.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native
title interests, historical sites, wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area
• The Balladonia Project is centered at 6411000N and
515500E (GDA94 Zone 51), approximately 135 km ESE
of Norseman in Western Australia.
• Tenement holdings include five granted Exploration
License’s (E69/3246, 3825, 3671, 3558, 3932) and two
Exploration License applications (E69/3559, and 3672).
• The Balladonia Prospect is subject to a Strategic Alliance
Agreement whereby South32 have the right to earn a 70%
interest by spending US$4.5M.
• Aboriginal heritage surveys and fauna – Flora surveys are
routinely completed ahead of ground disturbing activities.
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties.
• Limited surface exploration has been completed by other
parties. AusQuest is the first exploration company to
complete drilling programs within the tenements.
• The tenements have been covered by regional government
geophysical and geological surveys and partly by regional
GSWA geochemical sampling.
Geology
• Deposit type, geological setting and style of mineralisation.
• The exploration model for the Balladonia Project is based
upon copper and nickel sulphides hosted in mafic rocks as
is the case within the Fraser Range Belt, and base metal
mineralisation in BHT and /or IOCG settings similar to
the Eastern Succession in north-west Queensland and at
Broken Hill in NSW..
Drill hole
Information
• A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
• All relevant drill hole data are tabulated below and
provided in the ASX release.
4
Criteria
JORC Code explanation
•
Data aggregation
methods
•
•
•
Commentary
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly
stated.
These relationships are particularly important in the reporting of Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).
Relationship
between
mineralisation
widths and
intercept lengths
•
•
Diagrams
• Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
• Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
• The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
Balanced reporting
Other substantive
exploration data
Further work
•
5
• No weighting or averaging techniques were used.
• Drilling was reconnaissance in nature. The relationship to
any mineralization is not known at this stage.
• Drill holes are shown on appropriate plans and included
in the ASX release.
• Anomalous ranges of elements are quoted. Drilling still at
the reconnaissance stage.
• The relationship between current drill results and
previously reported exploration data is presented in the
report.
• Further drilling will depend on the assessment of results
from this drilling program.
Diamond drill-hole location details
Hole_No
23BDDD018
23BDDD019
23BDDD020
23BDDD021
23BDDD022
23BDDD023
23BDDD024
23BDDD025
23BDDD026
23BDDD027
Prospect
Tea Tree
Tea Tree
Tea Tree
Tea Tree North
Half Way South
Half Way West
Half Way
Telegraph East
Telegraph East
Telegraph West
Easting
508248
507953
507903
505950
514898
514479
518047
521350
521199
512403
Northing
6418396
6418153
6418699
6422900
6417498
6419601
6419999
6412399
6412200
6411804
RL
238
237
247
248
276
278
269
243
242
262
Datum
GDA94
GDA94
GDA94
GDA94
GDA94
GDA94
GDA94
GDA94
GDA94
GDA94
6
Zone
51
51
51
51
51
51
51
51
51
51
Azimuth
269
266
269
276
268
223
269
89
270
270
Inc
-60
-60
-60
-61
-60
-60
-60
-61
-60
-60
Depth (m)
504
444.6
462.7
396.8
291.9
346.2
399.1
286.9
150.6
393.8
Assays
Received
Received
Received
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Share your feedback
Discover