Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
March 2026 Quarterly Activities Report
HIGHLIGHTS
Peru – Cangallo Copper-Gold Project
❑ Broad-spaced RC drilling has defined a large corridor of continuous mineralisation
extending over a strike length of +1,500m, widths of 250-500m and to depths exceeding
400m.
❑ Significant results from the southern-most drill section include:
• 172 metres @ 0.33% Cu, 0.07gpt Au from 154m (CANRC032), including:
▪ 36 metres @ 0.54% Cu and 0.06gpt Au
▪ 46 metres @ 0.38% Cu and 0.08gpt Au
• 164 metres @ 0.33% Cu, 0.07gpt Au from 304m (CANRC034), including:
▪ 54 metres @ 0.42% Cu and 0.07gpt Au
▪ 26 metres @ 0.42% Cu and 0.09gpt Au
❑ Results to date have also delivered multiple broad >0.5% Cu intervals, confirming the
system’s capacity to generate higher copper grades. Significant results include:
▪ 68 metres @ 0.52% Cu from 36m (CANRC012)
▪ 30 metres @ 0.60% Cu from 156m (CANRC032)
▪ 18 metres @ 0.62% Cu from 134m (CANRC014)
▪ 10 metres @ 0.72% Cu from 36m (CANRC008)
▪ 10 metres @ 0.65% Cu from 10m (CANRC032)
▪ 20 metres @ 0.56% Cu from 354m (CANRC002)
▪ 18 metres @ 0.59% Cu from 354m (CANDD002)
▪ 10 metres @ 0.53% Cu from 470m (CANDD002)
❑ Reverse Circulation (RC) drilling (+5,000m) re-commenced to expand the copper-gold
mineralisation and help locate higher-grade mineralisation beneath the oxide zone. Drilling
is expected to be completed by early May, with final assays due by the end of May 2026.
❑ Diamond drilling (+5,000m) to test deeper hypogene targets is scheduled to commence in
late May 2026, once RC drilling complete and results assessed.
❑ Permitting for Stage 4 drilling to allow testing of the southern extension of the Cangallo
porphyry system advanced, with final approvals expected in Q3 CY2026.
❑ The potential of this exciting new copper discovery continues to grow, with results
confirming extensive near-surface copper oxide mineralisation and the potential for higher-
grade hypogene mineralisation, in an excellent location close to the coast and key
infrastructure.
Peru – Playa Kali and Lantana Copper-Gold Projects
❑ Drill permits were received for the Playa Kali and Lantana Copper-Gold Projects, which
are located close to the Cangallo porphyry copper discovery.
❑ Maiden Reverse Circulation (RC) drilling (two +4,000m programs) is planned across both
prospects to test IOCG (manto) targets at Playa Kali and a large-scale, high-grade
porphyry copper target at Lantana.
Australia – Copper, Zinc, Nickel, Gold, Iron
❑ At Balladonia (WA), Native Title Heritage Surveys were successfully completed ahead of
an RC drill program (~8,000m) to test a range of lead-zinc and copper-gold targets.
❑ Native Title Heritage Surveys were completed in April to allow RC drilling (~4,500m) of
Iron-Oxide Copper-Gold (IOCG) targets at the Coober Pedy Project in South Australia to
commence.
❑ At Mt Davis (WA), ground geophysical surveys were planned under the Strategic Alliance
Agreement (SAA) with a wholly-owned subsidiary of South32 Limited (South32) to
identify targets for further drilling.
Corporate
❑ Quarter-end cash position of ~$10.2 million, which includes funds provided by South32 to
complete drilling programs at Balladonia and Coober Pedy.
Figure 1: Project Locations – Australia and Peru.
OVERVIEW
During the March Quarter, AusQuest
continued its drilling campaign at the exciting
Cangallo porphyry copper-gold discovery in
Peru and finalised drill permits for the nearby
Playa Kali and Lantana Prospects to advance
the Company’s evaluation of the Cangallo
District’s potential to host significant copper-
gold resources.
In Australia, preparations for exploration
programs – including drilling at the
Balladonia, Coober Pedy Projects – were
finalised under the SAA and clearance
approvals sought to allow drilling programs to
commence during Q2 CY2026.
PERU COPPER-GOLD PROJECTS
AusQuest has assembled a strong portfolio of
copper-gold prospects along the southern
coastal belt of Peru in South America, with
numerous targets identified for drilling as
possible porphyry copper and/or replacement
style (manto) IOCG targets with size potential
being of significance to AusQuest (Figure 2).
Peru is one of the world’s most prominent
destinations for copper exploration and is
considered a prime location for world-class
exploration opportunities.
Figure 2: Project Locations – Southern Peru.
Cangallo Copper-Gold Project (100%
AQD)
The Cangallo Porphyry Copper-Gold
Discovery is located approximately 20km
west of the Company’s Cerro de Fierro
Project in southern Peru, along the same E-W
structures that appear to control the
emplacement of potential porphyry copper
systems in the area. The tenements, which
cover an area of ~ 60km², are very well
located, being ~8km from the coast, close to
infrastructure, and at an elevation between
500 and 1,200 metres. Geological mapping
and rock-chip sampling originally identified a
partially exposed copper (+/- gold) porphyry
system within a large-scale (minimum 3km x
2km) caldera-like structure containing
extensive colluvial and younger sediments.
During the Quarter, final assay results were
received from the first phase of Stage 3
Reverse Circulation (RC) drilling (20 drill-
holes for 7,836m), demonstrating continuity
of the porphyry copper system over a strike
length of more than 1,500 metres, 250-500
metres in width and extending to depths
exceeding 400 metres, with the footprint
expected to expand with further drilling
(Figure 3) (ASX releases 11th
February, and
4th
March 2026).
Copper occurs as oxides and sulphides
dominantly in stockwork veins and veinlets
within the host volcanics and within intrusive
dykes (quartz diorites and tonalites) that
appear to be more prevalent in the south of
the prospect. Copper is closely associated
with chlorite/sericite alteration within the
veins and vein selvages.
Significant intersections from all RC and
diamond drill-holes completed to date are
provided in Appendices 1 and 2, with drill-
hole locations shown in Figure 3.
Figure 3: Cangallo Prospect showing location of Stage 3 RC drill-holes with copper profiles, and potential
extensions inferred by drilling and surface copper anomalism.
A review of copper (Cu) intersections from
the current drilling indicates that a 0.1% Cu
cut-off grade provides a good indication of
the overall size of the porphyry system, but
does not highlight the presence or continuity
of the higher copper grades given the broad-
spaced nature of the drilling completed to
date.
Multiple +0.5% Cu intervals greater that 10
metres in thickness occur within the broader
mineralised envelope, demonstrating the
capability of the porphyry system to produce
higher-grade copper either through supergene
enrichment processes or as hypogene
mineralisation within intrusive dykes
associated with the porphyry system.
Significant +0.5% Cu intersections greater
than 10 metres in thickness are provided in
the table below.
Hole ID From (m) To (m) Int (m) Cu% Hole ID From (m) To (m) Int (m) Cu%
CANRC008 36 46 10 0.72 CANRC002 362 372 10 0.57
CANRC032 10 20 10 0.65 CANRC001 252 264 12 0.53
CANRC014 134 152 18 0.62 CANRC034 388 398 10 0.51
CANRC032 156 186 30 0.60 CANDD002 354 374 20 0.56
CANRC003 164 182 18 0.55 CANDD002 416 426 10 0.51
CANRC012 36 104 68 0.52 CANDD002 470 480 10 0.53
CANRC014 186 200 14 0.52 CANDD002 546 556 10 0.50
CANRC008 50 64 14 0.52
CANRC014 96 120 24 0.50
Copper grades averaging greater than 0.3%
Cu were also calculated to check continuity of
higher-grade intersections, with results
highlighting substantial thicknesses (50-
330m) of +0.3% Cu on all the sections drilled
to date (ASX release 4th March 2026).
Thicker intercepts are evident at the northern
and southern extensions of the prospect,
where mineralisation remains open along
strike and at depth (Figures 3 and 4).
Many of the higher-grade intercepts occur
within the oxide zone and are associated with
copper oxides (malachite, chrysocolla,
atacamite) and/or secondary copper sulphides
(chalcocite, bornite and rare covellite) that
occur within the top 250 to 300 metres of
section and could be recoverable using heap
leaching techniques. Sequential copper assays
for the current RC drill-holes have been
initiated to help determine the leachability
characteristics of copper within the oxidised
zone.
Targeting hypogene copper sulphides
A full assessment of the multi-element
geochemistry from the RC drilling program is
being undertaken to help identify trends and
patterns within the porphyry system that will
be used to guide future diamond drilling to
locate areas of increased veining and/or the
source porphyry, where higher copper grades
are more likely to occur.
The current phase of RC drilling (+5,000m)
which commenced late in the Quarter, is
designed to extend the copper and gold
mineralisation and to provide data to help
locate higher-grade hypogene copper
sulphides that are believed to occur beneath
the oxide mineralisation (Figure 3).
This program will also provide a limited test
of the area south of the current drill coverage,
where both surface and drill-hole data
highlight the potential for significant copper
extensions.
The current RC drilling program should be
completed by early May with final assays
expected by the end of May 2026. Diamond
drilling is expected to commence in late May
after the completion of the RC program.
Permitting was advanced for the Stage 4
drilling program (20 drill pads), which will
allow the southern extension of the porphyry
system to be fully tested. An application was
submitted to Government (MINEM) for initial
approval. Final approvals are expected during
Q3 CY2026.
Figure 4: Cangallo Prospect showing the location of the Stage 3 RC drill-holes and significant intersections
averaging greater than 0.3% Cu.
Lantana Porphyry Copper Prospect (100%
AQD)
The Lantana Prospect is located at the
southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~150km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), which is being
developed by the Marcobre Joint Venture.
Surface indicators of porphyry copper
mineralisation have been identified at
Lantana, which is located at the eastern end
of the Cerro de Fierro Project, approximately
20km east of Cangallo, and associated with a
major E-W structural corridor that is
considered to be a priority target zone for
porphyry copper deposits within the coastal
belt of southern Peru.
During the Quarter, drill permits were
received for the Lantana prospect to allow
access and drill pads to be prepared in
readiness for the maiden RC drilling program
(~+4,000m), which is planned to commence
in Q2 CY2026, pending availability of drill
rigs and other operational factors (ASX
release April 15th
2026).
Drill pads have been positioned to test a
porphyry copper target which is considered
high-priority due to its scale (~2,000m x
800m) and the widespread occurrence of
highly anomalous copper (often in excess of
1.0% Cu), molybdenum and bismuth values
obtained from rock-chip sampling programs
completed in 2023 (Figure 5)
Geological mapping identified large areas of
advanced argillic alteration (AAA) within the
dominantly andesitic volcanic sequence, with
the high-grade copper values occurring within
dyke-like features marginal to the mapped
AAA (lithocap), highlighting the potential for
a nearby strongly mineralised porphyry
system.
Figure 5: Lantana Prospect geology plan showing permitted drill pads in relation to highly anomalous
surface copper samples (>1.0% Cu).
Playa Kali IOCG Project (100% AQD)
The Playa Kali Project is located ~10km east
of the coastal town of Chala and ~120km
south-east of the Mina Justa copper deposit
(~475Mt @ 0.68% Cu). It consists of six
mineral claims covering an area of ~33km²
and was acquired after manto-style
mineralisation (including massive magnetite
layers with up to 1m thick bands of sulphides
containing anomalous copper and gold values
up to 1.9% Cu and 1g/t Au), was located
within a sequence of sediments similar to
those found in the vicinity of the Marcona and
Mina Justa deposits to the north. Geological
mapping, rock-chip sampling and ground
magnetic surveys have been completed over
the tenements, defining target areas for
drilling, targeting manto-style copper-gold
deposits.
During the Quarter, drill permits were
received to allow access and drill pads to be
prepared in readiness for the maiden RC
drilling program (+4,000m), which is planned
to commence in Q2 CY2026 (Figure 6) (ASX
release April 15th
2026).
This program will test a range of geophysical
and geochemical targets that were identified
by the Company’s earlier exploration
programs (June and September 2024
Quarterly Activities Reports).
Numerous manto (Fe) outcrops that contain
anomalous copper (+/-gold) mineralisation
have been located along the coast, providing
strong indications of extensive manto (iron
oxide) development in the area with potential
to host significant copper-gold mineralisation.
Ground magnetic surveys completed
previously by the Company located anomalies
associated with the manto outcrops, as well as
anomalies further inland and under cover, that
are considered high-priority targets as they are
thought to occur within the same andesitic
volcanic units that host the Mina Justa copper
deposit to the north.
Figure 6: Playa Kali – Ground magnetic targets showing permitted drill pads and copper bearing manto
outcrops (0.14% to 1.96% Cu) along the coast.
Parcoy IOCG Project (100% AQD)
The Parcoy Project is located near the
southern end of a recognised IOCG
metallogenic belt in southern Peru. It lies
within ~100km of the Mina Justa deposit
(~475Mt @ 0.68% Cu), and ~50km north-
west of the Company’s Cerro de Fierro
Project. Geological mapping and rock-chip
sampling has identified significant
concentrations of copper (+/- gold) at
surface, reflecting potential manto-style
mineralisation within the volcanic
stratigraphy.
No work was completed during the Quarter
while efforts were focused on the nearby
Cangallo Project. The Company believes that
there are copper targets at Parcoy that were
not tested by the initial wide-spaced drilling
programs and is re-considering its options for
the project.
AUSTRALIA – BASE METAL
PROJECTS (Copper, Zinc, Nickel & REE)
Balladonia Zinc-Copper (+/- Nickel and
REE) Project (100% AQD, subject to SAA)
The Balladonia Project is located ~50km
south of the Nova–Bollinger nickel-copper
deposit in Western Australia. It consists of 11
Exploration Licences (six granted and five
applications) covering an area of ~1,350km²
and is located within a structurally complex
region of the Fraser Range Terrane.
Exploration at Balladonia has indicated
potential for multiple mineralisation styles
with many priority targets identified. This
includes the potential for nickel and copper
mineralisation similar to the Nova deposit, as
well as iron-oxide copper-gold (IOCG) and
Broken Hill Type (BHT) deposits similar to
those found in the Eastern Succession (NW
Queensland) and in NSW. More recently, the
potential for rare earth elements (REE)
associated with carbonatite intrusions has
also been recognised. Many of the tenements
lie within the Dundas Reserve. Exploration
work at Balladonia is funded under the SAA.
Figure 7: Balladonia: Magnetic image showing target locations and planned drill-holes.
During the Quarter, an RC drilling program to
test a range of targets for lead-zinc and
copper-gold mineralisation was finalised
under the SAA (Figure 7). Native Title
Heritage Surveys were subsequently
completed over all the proposed targets, with
no obvious impediments advised to the bulk
of the program. Planned RC drilling (~ 65
holes for a total of ~8,000m) can commence
once all approvals have been received from
Government.
A submission to undertake exploration
drilling and possible geophysical surveys
inside the Dundas Nature Reserve (DNR) was
submitted to the Department of Biodiversity
Conservation and Attractions (DBCA) under
the Company’s Reserve Activity Management
Plan. Their response is pending.
The 2026 drilling program will focus on
targets within the DNR with priority given to
structural sites within and adjacent to the
main Tea Tree sequence as well as distinct
magnetic/gravity targets offset from the Tea
Tree Trend.
Potential targets for Broken Hill Type (BHT)
lead zinc and/or IOCG mineralisation were
identified by interpretation of magnetic and
gravity data and compilation with data
acquired from the 2025 RC drill program.
Morrisey Magnetite, Nickel-Copper-PGE
Project (100% AQD, subject to SAA)
The Morrisey Project is located ~500km north
of Perth in Western Australia within the
Midwest mining district. The project occurs
within the high-grade metamorphic Narryer
Terrane, which forms the north-western
margin of the Yilgarn Craton. It consists of
three granted Exploration Licences and one
application covering an area of ~1,130km²
and is located ~120km north of the town of
Mullewa, where there is rail access to the
Port of Geraldton 80km away.
Reconnaissance drilling to test magnetic
targets intersected coarse grained magnetite
which could be upgraded via magnetic
separation methods to a premium iron
product (>70% Fe) potentially suitable for
green iron smelting. Exploration work at
Morrisey is funded under the SAA.
During the Quarter, modelling of gravity and
magnetic data over the Murchison, Murchison
South, Sandfly and Waterfall North magnetite
prospects continued in an attempt to
determine the potential scale of the combined
magnetite mineralisation within the Project
area.
Magnetite in these prospects occurs in high
grade metamorphic iron formation (IF),
similar to that found at the Waterfall Prospect,
and can be upgraded to +70% Fe using a
coarse grind size (75µm).
Further evaluation of the Morrisey Magnetite
Project is being considered under the SAA.
Coober Pedy Copper-Gold Project (100%
AQD, subject to SAA)
The Coober Pedy Project is located ~15km
SW of the town of Coober Pedy, South
Australia, on the north-eastern margin of the
Gawler Craton, approximately 100km NW of
the Prominent Hill Copper Gold deposit. The
Project, which consists of one Exploration
Licence covering an area of ~170km², was
acquired to explore for iron-oxide copper-
gold (IOCG) deposits. Regional magnetic and
gravity data, plus analytical results from
historical drilling (five holes) highlighted the
prospectivity of the area. Exploration work at
Coober Pedy is funded under the SAA
In April, Native Title Heritage Surveys were
successfully completed to allow access and
drill pads to be prepared for an RC drilling
program (~4,500m) to test for Iron-Oxide
Copper-Gold (IOCG) mineralisation.
The RC program (~13 holes for a total of
~4,500m) is designed to provide an initial test
of a combination of geophysical targets
located close to the interpreted position of the
Elizabeth Creek Fault zone, which is one of
the regional structures considered to be
associated with IOCG mineralisation in the
region (Figure 8).
Drilling is expected to commence in Q2
CY2026 once final approvals have been
received.
Figure 8: Coober Pedy Prospect showing targets defined by geophysical surveys and planned drill sites.
Mt Davis Lead-Zinc-Copper Project (100%
AQD, subject to SAA)
The Mt Davis Project is located ~180km NNE
of Wiluna, Western Australia, along the
northern margin of the Earaheedy Basin. It
consists of three Exploration Licences (two
granted and one application) covering an
area of ~1,275km². The project was acquired
following the discovery of extensive zinc and
copper mineralisation by Rumble Resources
at its Chinook Prospect, located on the
southern side of the Basin, where
mineralisation is stratigraphically controlled
and located below the Frere Iron Formation.
The Mt Davis tenements are believed to
contain similar stratigraphy but in an area of
greater structural complexity which has been
reported as an important factor in the
localisation of higher grades at Chinook.
Exploration work at Mt Davis is funded under
the SAA.
During the Quarter, ground geophysical
surveys were planned to further explore the
northern margin of the Earaheedy Basin,
which is under extensive sand cover, for
sediment-hosted base metal deposits.
Earlier RC drilling at one of the prospects,
identified by a helicopter electromagnetic
(VTEM) survey, provided sufficient
encouragement to undertake further
exploration to identify additional targets for
drilling. Assay results from earlier drilling
had reported anomalous base metal values
including: 18m @ 2,010ppm Pb and 583ppm
Cu (25MDRC02), 24m @ 3,586ppm Pb and
0.47g/t Ag (25MDRC04) and 8m @
9,485ppm Pb and 0.44g/t Ag (25MDRC03)
(ASX release 23rd
December 2025).
Ground electromagnetic surveys have been
designed to test target areas where a
combination of VTEM and magnetic data
highlights the possibility of the prospective
stratigraphy (below the Frere Iron Formation)
and major structures being present.
Heritage clearance surveys are being sought
ahead of commencing the ground EM
surveys.
Hamilton Copper-Gold Project (100%
AQD)
The Hamilton Project is located in north-west
Queensland, ~120km south of the world-class
Cannington mine and ~70km south of the
Osborne copper mine. It consists of two
Exploration Licences covering an area of
~260km². Exploration is targeting iron oxide,
copper, gold (IOCG) and Broken Hill Type
(BHT) mineralisation beneath the extensive
cover in the region. Limited drilling
completed to date to test magnetic and gravity
targets provided evidence for “near-miss”
situations which are the focus of the
Company’s ongoing exploration.
During the Quarter, a submission to undertake
drilling at the Hamilton South prospect under
the Queensland Government’s Collaborative
Exploration Initiative program was
unsuccessful. Further work at this prospect is
being considered in view of other Company
priorities.
New Opportunities (Australia):
New opportunities within Australia continue
to be assessed by the Company’s consultants.
CORPORATE
At the end of the March Quarter, the
Company had approximately $10.2 million in
cash after investing ~$3.2 million in
exploration. These funds include
contributions from South32 to cover work
programs in Australia that have been agreed
under the SAA.
The Company’s Cashflow Report (Appendix
5B) for the Quarter ended 31 March 2026 is
appended to this report. Payments to related
parties as shown in Section 6 of this report
include director salary and superannuation
payments of $85,000 and payments of $4,000
for corporate consulting fees to a director.
KEY ACTIVITIES – JUNE 2026
QUARTER
• Peru (Cu-Mo-Au) – Complete Stage 3
RC drilling at Cangallo and
commence diamond drilling of deeper
sulphide targets.
• Peru (Cu-Mo-Au) – Continue to
advance Stage 4 drill permitting at
Cangallo (20 additional drill pads;
+50,000m RC/diamond drilling).
• Peru (Cu-Mo-Au) – Continue with
geological / resource modelling at
Cangallo.
• Peru (Cu-Mo-Au) – Advance early-
stage metallurgical test work at
Cangallo.
• Peru (Cu-Mo-Au) – Commence
maiden RC drill programs at Playa
Kali and Lantana.
• Balladonia (Cu-Zn-Au) – Complete
access preparation for RC drill
program (subject to final Government
approvals) and commence drill
program.
• Morrisey (Magnetite) – Finalise
ongoing evaluation program under the
SAA.
• Coober Pedy (Cu-Au) – Complete RC
drill program to test IOCG targets.
• Mt Davis (Cu-Pb-Zn) – Complete
Heritage clearance for ground EM
surveys.
Authorised for release on behalf of the
Company by:
Graeme Drew
Managing Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr Graeme Drew, a
full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining and Metallurgy (AUSIMM)
and has sufficient experience in the activity which he is undertaking to qualify as a Competent Person as defined in the December
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
Mr Drew consents to the inclusion in the report of the matters based upon his information in the form and context in which it
appears.
NO NEW INFORMATION
To the extent that this announcement contains references to prior exploration results which have been cross referenced to previous
market announcements made by the Company, unless explicitly stated, the Company confirms that it is not aware of any new
information or data that materially affects the information included in the relevant market announcements.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements concerning
mining reserves and resources may also be deemed to be forward looking statements in that they involve estimates based on
specific assumptions. Forward-looking statements are not statements of historical fact and actual events and results may differ
materially from those described in the forward looking statements as a result of a variety of risks, uncertainties and other factors.
Forward looking statements are based on management’s beliefs, opinions and estimates as of the dates the forward looking
statements are made and no obligation is assumed to update forward looking statements if these beliefs, opinions and estimates
should change or to reflect other future developments.
Appendix 1: Significant Intersections from Reverse Circulation Drilling at Cangallo (Peru)
Hole ID From (m) To (m) Interv (m) Cu % Au ppm Mo ppm Ag ppm
CANRC001 6 354 EOH 348 0.26 0.06 12 0.31
Including 10 26 16 0.43 0.08 6 0.09
Including 58 84 26 0.36 0.07 6 0.57
Including 252 264 12 0.53 0.27 32 1.09
Including 316 350 34 0.39 0.08 31 0.44
CANRC002 18 134 116 0.19 0.04 28 0.08
138 148 10 0.48 0.07 72 0.03
180 208 28 0.18 0.04 59 0.58
214 402 EOH 188 0.28 0.07 39 0.38
Including 222 234 12 0.5 0.07 72 0.67
Including 312 322 10 0.43 0.09 16 0.41
Including 342 380 38 0.40 0.09 33 0.46
CANRC003 36 190 154 0.37 0.06 18 0.19
Including 40 76 36 0.37 0.05 15 0.07
Including 86 110 24 0.42 0.06 12 0.12
Including 128 138 10 0.42 0.06 15 0.39
Including 146 190 44 0.47 0.08 33 0.25
230 366 EOH 136 0.24 0.06 36 0.28
Including 258 288 30 0.37 0.07 34 0.41
CANRC004 228 238 10 0.17 0.07 30 0.18
272 276 EOH 4 0.33 0.02 26 0.87
CANRC005 4 230 226 0.22 0.07 9 0.22
Including 20 32 12 0.33 0.04 4 0.07
Including 54 82 28 0.33 0.11 10 0.09
CANRC006 4 20 16 0.15 0.05 5 0.07
36 92 56 0.12 0.03 4 0.05
110 122 12 0.12 0.02 21 0.08
164 192 28 0.12 0.02 10 0.21
206 262 56 0.13 0.03 14 0.26
270 408 EOH 138 0.17 0.03 31 0.26
CANRC007 22.00 158.00 136.00 0.25 0.06 62.00 0.15
Including 138.00 150.00 12.00 0.43 0.07 111.00 0.51
256.00 377 EOH 121.00 0.26 0.04 43.00 0.32
Including 264.00 298.00 34.00 0.36 0.03 37.00 0.32
Including 352.00 364.00 12.00 0.48 0.08 68.00 0.44
CANRC008 34.00 338.00 304.00 0.30 0.06 18.00 0.05
Including 36.00 64.00 28.00 0.56 0.03 11.00 0.06
Including 120.00 176.00 56.00 0.40 0.06 12.00 0.34
Including 186.00 206.00 20.00 0.33 0.08 25.00 0.29
Including 216.00 234.00 18.00 0.35 0.08 20.00 0.40
350.00 414 EOH 64.00 0.23 0.05 20.00 0.20
Including 380.00 394.00 14.00 0.37 0.10 23.00 0.31
CANRC009 18 148 130 0.23 0.06 38 0.13
166 408 (EOH) 242 0.16 0.03 43 0.21
Including 130 148 18 0.31 0.04 61 0.42
CANRC010 36 310 274 0.19 0.03 32 0.24
Including 96 134 38 0.36 0.06 34 0.26
CANRC011 18 142 124 0.16 0.04 26 0.16
226 352 126 0.23 0.03 30 0.22
378 400 (EOH) 22 0.16 0.03 19 0.18
Including 62 80 18 0.31 0.04 32 0.06
Including 266 298 32 0.37 0.04 32 0.36
CANRC012 36 360 324 0.3 0.07 14 0.27
388 432 (EOH) 44 0.18 0.05 15 0.12
Including 36 196 160 0.45 0.09 13 0.30
CANRC013 32 90 58 0.33 0.05 28 0.07
110 344 234 0.3 0.06 30 0.57
Including 36 88 52 0.35 0.05 28 0.05
Including 110 252 142 0.39 0.06 20 0.76
CANRC014 32 362 (EOH) 330 0.30 0.06 15 0.37
Including 34 212 178 0.40 0.08 15 0.44
CANRC016 278 292 14 0.14 0.02 38 0.09
CANRC017 10 50 40 0.14 0.08 12 0.06
74 112 38 0.18 0.08 48 0.31
122 144 22 0.23 0.12 45 0.23
174 254 80 0.27 0.01 43 0.60
276 426 (EOH) 150 0.21 0.05 36 0.33
Including 174 196 22 0.37 0.08 39 0.95
Including 218 234 16 0.37 0.06 18 0.62
Including 312 324 12 0.33 0.07 37 0.33
CANRC018 14 56 42 0.2 0.02 18 0.07
CANRC019 12 96 84 0.16 0.05 28 0.38
106 420 (EOH) 314 0.20 0.04 27 0.33
Including 154 170 16 0.35 0.06 17 0.22
Including 196 230 34 0.30 0.04 19 0.05
CANRC021 2 158 156 0.16 0.05 10 0.14
192 384 192 0.17 0.07 21 0.26
Including 76 92 16 0.43 0.11 33 0.43
Including 268 284 16 0.41 0.17 43 0.41
CANRC022 42 112 70 0.25 0.06 11 0.05
124 214 90 0.17 0.03 13 0.48
260 302 42 0.19 0.03 14 0.38
316 415 (EOH) 99 0.14 0.05 15 0.30
Including 96 108 12 0.34 0.04 11 0.03
Including 184 206 22 0.30 0.03 14 0.45
CANRC023 20 46 26 0.17 0.01 12 0.04
54 130 76 0.29 0.04 13 0.10
238 280 42 0.13 0.02 17 0.14
including 82 108 26 0.3 0.03 10 0.08
Including 110 126 16 0.6 0.05 12 0.12
CANRC024 42 78 36 0.14 0.03 14 0.05
204 236 32 0.20 0.04 57 0.40
264 420 (EOH) 156 0.17 0.04 20 0.24
CANRC026 66 138 72 0.26 0.01 17 0.09
180 222 42 0.23 0.04 20 0.64
230 254 24 0.18 0.04 13 0.40
294 340 46 0.22 0.04 14 0.46
CANRC027 208 216 8 0.29 0.01 6 0.70
226 435 (EOH) 209 0.22 0.04 24 0.46
including 228 258 30 0.38 0.05 14 0.52
Including 268 284 16 0.3 0.05 12 1.04
Including 416 435 (EOH) 19 0.34 0.08 32 0.70
CANRC032 10 20 10 0.65 0.07 5 0.04
74 90 16 0.12 0.01 12 0.04
116 132 16 0.18 0.07 13 1.08
154 326 172 0.33 0.07 13 0.67
334 444 (EOH) 110 0.27 0.07 18 0.46
including 156 192 36 0.54 0.06 10 0.40
Including 280 326 46 0.38 0.08 11 0.67
Including 368 398 30 0.33 0.07 26 0.62
Including 420 444 24 0.29 0.07 9 0.39
CANRC033 46 74 28 0.13 0.05 6 0.08
110 128 18 0.15 0.25 6 0.17
140 254 114 0.15 0.06 15 0.34
342 408 (EOH) 66 0.14 0.06 8 0.24
CANRC034 40 284 244 0.23 0.07 10 0.35
304 468 (EOH) 164 0.33 0.07 20 0.65
including 124 144 20 0.35 0.06 10 0.52
Including 246 256 10 0.42 0.08 21 1.10
Including 260 278 18 0.41 0.09 12 0.88
Including 306 360 54 0.42 0.07 22