CANGALLO DELIVERS SIGNIFICANT COPPER EXTENSIONS,
EXTENDING THE PORPHYRY DISCOVERY TO OVER 1,500M
• Recent RC drilling has substantially increased the size of the porphyry copper-
gold system at Cangallo to more than 1,500 metres in length.
• Significant assays from the first 10 drill-holes include:
o 172 metres @ 0.33% Cu, 0.07gpt Au from 154m (CANRC032), including:
▪ 36 metres @ 0.54% Cu and 0.06 gpt Au
▪ 46 metres @ 0.38% Cu and 0.08gpt Au
o 110 metres @ 0.27% Cu, 0.07gpt Au from 334m (CANRC032), including:
▪ 30 metres @ 0.33% Cu and 0.07gpt Au
▪ 24 metres @ 0.29% Cu and 0.07gpt Au (at EOH)
o 72 metres @ 0.26% Cu from 66m and 42 metres @ 0.23% Cu, 0.04gpt Au
from 180m (CANRC026)
o 209 metres @ 0.22% Cu, 0.04gpt Au from 226m (CANRC027), including:
▪ 30 metres @ 0.38% Cu and 0.05gpt Au
▪ 19 metres @ 0.34% Cu and 0.08gpt Au (at EOH)
o 76 metres @ 0.29% Cu, 0.04gpt Au from 54m (CANRC023), including:
▪ 16 metres @ 0.60% Cu and 0.05gpt Au
▪ 26 metres @ 0.30% Cu and 0.03gpt Au
o 70 metres @ 0.25% Cu, 0.06gpt Au from 42m (CANRC022), including:
▪ 12 metres @ 0.34% Cu and 0.04gpt Au
• All new sections contain broad intersections of copper mineralisation starting
from near-surface and extending to ‘End of Hole’ (EOH >400m).
• Copper mineralisation remains open to the north, south and east. Assays for the
remaining 10 drill-holes expected over the coming weeks.
• Further RC drilling (+5000m) will recommence in early March to extend copper
mineralisation within strongly mineralised sections.
• Deep diamond drilling planned to commence in April targeting potential depth
extensions of copper sulphide mineralisation.
• The potential of this exciting new copper discovery continues to grow with results
demonstrating near surface copper oxide mineralisation in an excellent location
close to the coast and key infrastructure.
AusQuest Limited (“AusQuest” or the “Company”) (ASX: AQD) is pleased to report initial
assay results from the Stage 3 Reverse Circulation (RC) drilling program at the Company’s
100%-owned Cangallo Porphyry Copper-Gold Project in Peru.
2
Figure 1: Cangallo Prospect showing location of the completed Stage 3 RC drill-holes and those with
assays pending, as well proposed drill pads as part of Stage 4 drill permitting.
The initial phase of the Stage 3 RC drilling program at Cangallo, which consisted of 20
broadly spaced drill-holes (for 7,836m) located along east-west sections to the south of the
initial drill coverage, has now been completed with assays received for 10 of the completed
drill-holes (Figure 1).
The RC drilling program was designed to extend the mineralisation from the stage 1 and 2
drilling programs, and to expand the size of the porphyry system. This new discovery is still
3
open in most directions and at depth. The additional data from this program is helping to
build the scale and economic potential of this discovery.
Assay results received to date clearly demonstrate the continuity of the porphyry copper
system to the south of the initial drilling area, with the known strike length of copper
mineralisation now extending for at least 1,500 metres. Additional drilling is planned to
extend the limits of the mineralisation beyond the current drill coverage.
Significant assay results received to date are provided in Table 1 below.
Results also confirm that copper mineralisation on each section remains open at depth
(~400m), adding to the potential scale of the Cangallo porphyry system, which is known to
extend to more than 800m depth (down-hole) to the north. Diamond drilling is planned as
part of the Stage 3 drilling program, to extend copper mineralisation below the current depth
of drilling, particularly in the south where drill-holes finished in strong mineralisation (eg
CANRC032).
Higher copper grades (above 0.3% Cu and up to 0.6% Cu) are present on each of the
sections drilled, with the strongest mineralisation located on the southern-most section,
highlighting the potential for additional mineralisation further to the south. Early interpretation
indicates a potential supergene enrichment at the base of oxidation on most sections.
Permitting for Stage 4 drill-pads (south of Stage 3) is currently underway (Figures 1, 2 and
3).
Copper mineralisation occurs as oxides and sulphides dominantly in stockwork veins and
veinlets within the host volcanics and some intrusive rocks in the southern area. Copper is
closely associated with chlorite/sericite alteration within the veins and vein selvages.
Figure 2: Cangallo RC drill Section 8244700N showing copper intersections and western contact
4
Figure 3: Cangallo RC drill section 8244450N showing copper intersections plus the western contact
and location of intrusive quartz diorite.
In drill-hole CANRC032 a higher grade zone from 156m to 178m (downhole) which averages
0.66% Cu within a quartz diorite intrusive dyke/stock, provides evidence of the potential for
an intrusive system in the south. The composition of the mineralised dykes varies from
quartz diorite to tonalitic compositions.
Holes drilled to the west of the main copper mineralisation (CANRC027, and parts of
CANRC028 and CANRC023) intersected the outer propylitic zone of the porphyry system,
containing high levels of pyrite but with only low copper values (average ~500ppm Cu). The
scale of the outer pyrite zone appears to be very large, supporting the interpretation that
Cangallo has the potential to be a very large porphyry system.
Holes drilled to the east, which appear to be weakly mineralised, are associated with an
altered quartz diorite stock within the Cangallo porphyry system. Multiple intrusions are
common within porphyries and are often more prevalent within the larger systems.
A full assessment of the multi-element geochemistry from the RC drilling program will be
undertaken once all the assay data have been received. This will help to identify trends and
patterns within the porphyry system that will be used to guide the next phase of diamond
drilling and help to locate further mineralisation within the porphyry system where increased
veining (and higher copper grades) is more likely to occur.
Commenting on progress at Cangallo, AusQuest’s Managing Director, Graeme Drew, said:
“We are very pleased with the initial results from the RC drilling, which has clearly extended
the mineralisation a considerable distance to the south – and highly likely even further than
what we have drilled to date. Results from the first drill-hole on the southern section are very
encouraging and may lead to a new porphyry centre being defined in the south.
5
“We are also encouraged to see that the copper is open at depth, with higher copper grade
zones intersected on each section. The drilling programs in Stages 1 to 4 were primarily
designed to define the extent of the porphyry system in the knowledge that size is very
important in the Peruvian context, before focusing on improving grade with in-fill drilling.
“Diamond drilling as part of the Stage 3 drilling program is currently being planned to test the
copper and gold potential below the current depth of drilling as soon as all the RC results
have been received.
“We look forward to keeping the market updated on the results from our drilling as they
become available in the coming weeks.”
Table 1: Significant intersections from Stage 3 RC drilling program include:
Hole Number From (m) To (m) Interval (m) Cu % Au gpt Mo ppm Ag ppm
CANRC022 42 112 70 0.25 0.06 11 0.05
124 214 90 0.17 0.03 13 0.48
260 302 42 0.19 0.03 14 0.38
316 415 (EOH) 99 0.14 0.05 15 0.30
Including 96 108 12 0.34 0.04 11 0.03
184 206 22 0.30 0.03 14 0.45
CANRC023 20 46 26 0.17 0.01 12 0.04
54 130 76 0.29 0.04 13 0.10
238 280 42 0.13 0.02 17 0.14
including 82 108 26 0.3 0.03 10 0.08
110 126 16 0.6 0.05 12 0.12
CANRC024 42 78 36 0.14 0.03 14 0.05
204 236 32 0.2 0.04 57 0.40
264 420 (EOH) 156 0.17 0.04 20 0.24
CANRC026 66 138 72 0.26 0.01 17 0.09
180 222 42 0.23 0.04 20 0.64
230 254 24 0.18 0.04 13 0.40
294 340 46 0.22 0.04 14 0.46
CANRC027 208 216 8 0.29 0.01 6 0.70
226 435 (EOH) 209 0.22 0.04 24 0.46
including 228 258 30 0.38 0.05 14 0.52
268 284 16 0.3 0.05 12 1.04
416 435 (EOH) 19 0.34 0.08 32 0.70
CANRC032 10 20 10 0.65 0.07 5 0.04
74 90 16 0.12 0.01 12 0.04
116 132 16 0.18 0.07 13 1.08
154 326 172 0.33 0.07 13 0.67
334 444 (EOH) 110 0.27 0.07 18 0.46
including 156 192 36 0.54 0.06 10 0.40
280 326 46 0.38 0.08 11 0.67
368 398 30 0.33 0.07 26 0.62
420 444 24 0.29 0.07 9 0.39
Broad copper intervals determined using a 0.1% Cu cut-off and an internal waste of 6 metres.
Gold, molybdenum and silver values were averaged for same intervals as the copper intersections
Higher grade intervals (including) were determined using 0.3% Cu cut-off and 6 metre waste intervals and a
minimum 10m interval
6
Context:
Peru is the second largest copper producer in the world behind Chile, with around 2.8Mt of
copper being mined and processed per annum. The bulk of this production comes from
around 10 large copper projects, mainly porphyries, that are located along the Andean Belt
that extends from Chile in the south to Ecuador in the north.
Porphyry deposits are typically large (often over 1 billion tonnes of ore) and usually open-
cuttable with low waste to ore ratios. The shallower parts of these ore bodies are usually
oxide ores that can be processed using heap leach methods, resulting in lower development
and operational costs.
There are a number of profitable large-scale operations (Cerro Verde, Cuajone, Toquepala,
Quellaveco and new approved developments at Zafranal) located within the Arequipa District
where Cangallo is situated, using head grades between 0.20% and 0.40% Cu. These mines
have multi-decade mine-lives and are long-lived assets.
The economic viability of the Peruvian resources is often affected by a range of issues
including location, altitude, proximity to infrastructure and water, as well as land usage
conflicts with local communities.
The Cangallo Project is particularly well located with respect to the above, being close to
significant infrastructure, 25km east of the town of Chala and within 10km of the coast.
Community consultation has formed part of the Company’s exploration process, with no
critical issues identified to date.
Peru is a stable country and the government is supportive of new mine developments as they
add significantly to the Peruvian economy and the communities where they are located.
Graeme Drew
Managing Director Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of
Mining and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as
a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in
the report of the matters based upon his information in the form and context in which it appears.
FORWARD-LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on
management’s beliefs, opinions and estimates as of the dates the forward looking statements are made and no
obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should
change or to reflect other future developments
7
*Announcements to ASX for the Cangallo Project
2023 – 2025 Quarterly Activities and Cashflow Reports
06/01/2026 Diamond and RC drilling substantially expands scale of copper mineralization at Cangallo
02/12/2025 Stage 3 Drilling commences at the Cangallo Copper-Gold Discovery in Peru
12/11/2025 Diamond Drilling more than doubles depth extent of copper mineralisation at Cangallo
30/09/2025 Diamond Drilling Commences at Cangallo
28/08/2025 Cangallo Porphyry Copper Discovery continues to grow
21/07/2025 Cangallo Drilling Progress Report
12/06/2025 Drilling Commences at Cangallo
24/04/2025 Drilling set to commence at Cangallo
05/03/2025 Drilling to extend Cangallo Cu-Au discovery
06/02/2025 Cangallo Discovery Confirmed
23/01/2025 Significant Porphyry Copper Discovery at Cangallo
17/12/2024 Drilling commences at Cangallo in Peru
09/11/2023 Cangallo Porphyry Copper Prospect Upgraded
13/11/2025 RC Drilling set to commence at Cangallo
1
JORC Code, 2012 Edition – Table 1 report, Reverse Circulation Drilling at Cangallo
in Peru
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public Report.
• In cases where ‘industry standard’ work has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Samples are collected using a tube sampler by spearing
into each one metre sample bag and compositing samples
on a two-metre basis.
• Sample depths are determined by the length of the rod-
string and confirmed by counting the number of samples
and bags at the drill platform as per standard industry
practice.
• A ~4kg sample is collected for representivity.
Drilling techniques • Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
• RC Drilling with a face sampling bit has been used with a
hole diameter of approximately 132mm.
• Down-hole surveys are recorded at 10m intervals using a
down-hole gyroscope probe.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and results
assessed.
• Measures taken to maximise sample recovery and ensure representative nature of the
samples.
• Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
• Experienced RC drillers and an appropriate rig were used
to provide maximum sample recovery.
• Minimal to no water was encountered in all drill holes.
• The weight of every bulk 1 metre sample was recorded
and checked for sample recovery estimates. Sample
recovery was acceptable to industry standard.
• The sample weight of every laboratory sample was also
collected and weighed on site for future reference.
• At this early stage of exploration, it is not known if there
is a relationship between sample recovery and assay
grade.
2
Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant intersections logged.
• RC sample chips were collected into chip trays and are
stored for future reference.
• RC samples were logged on site during the drilling by
experienced geologists to identify key rock types and
mineralization styles.
• Sample logging was qualitative with visual estimates of
mineralization made for later comparison with assay
results.
• All one metre drill samples were logged.
Sub-sampling
techniques and
sample preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material being sampled.
• RC samples were collected every 1 metre into large
plastic bags and stored in rows per depth at the drill site.
• Samples were collected using a 50mm tube sampler and
composited on a two metre basis.
• Certified coarse blanks and fine standards are inserted
approximately every 35 samples and duplicates taken
every 20 samples for quality control purposes.
• The sample sizes are considered appropriate for the
geological materials sampled.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and
precision have been established.
• Assaying of the drill samples is by standard industry
practice.
• The samples are sorted, dried, crushed then split to obtain
a representative sub-sample which is then pulverized.
• A portion of the pulverized sample is digested using a
four acid digest (Hydrofluoric, Nitric, Hydrochloric and
Perchloric) which approximates a total digest for most
elements. Some refractory minerals are not completely
dissolved.
• Inductively Coupled Plasma Mass Spectroscopy (ICP-
MS) was used to measure Ag, Al, As, Ba, Be, Bi, Ca, Cd,
Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg,
Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr,
Ta, Te, Th, Ti Tl, U, V, W, Y, Zn, Zr,
• Au assays were provided by 30g fire assay with AA
finish.
• Every 2 metre composite sample is also submitted for
3
Criteria JORC Code explanation Commentary
Hyperspectral analysis using a TerraSpec instrument and
uploaded into the aiSIRISTM
software for mineral
identification and spectral output.
• Assays are provided by ALS del Peru in Lima which is a
certified laboratory for mineral analyses. Analytical data
is transferred to the company via email.
• Data from the laboratory’s internal quality procedures
(standards, repeats and blanks) are provided to check data
quality.
• The Company collects duplicate samples on an
approximate 1: 20 basis, and inserts coarse blanks on a
1:30 basis and fine blanks on a 1:35 basis and fine
standards are inserted on a 1:35 basis.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No verification of intersections was undertaken. Drilling
is still wide spaced and semi-reconnaissance in nature.
• All primary sample data is recorded onto a printed sheet
on site and uploaded to a site laptop, all geological data is
recorded at the drill platform on a site laptop and
downloaded daily and onto an external backup.
• No adjustments have been made to the assay data.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill hole collars including elevation are located by hand
held GPS to an accuracy of approximately 5m.
• All surface location data are in WGS 84 datum, UTM
zone 18S.
Data spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• RC drill-holes were sited to test for mineralization at
shallow depths within a broader intrusive complex and
testing for broad zones of stockwork veining associated
with a hydrothermal mineralised system
• Samples were composited on a 2 metre basis.
Orientation of data
in relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
• Any bias due to the orientation of the drilling is unknown
at this early stage of exploration.
Sample security • The measures taken to ensure sample security. • Sample security is managed by the operator of the Project.
4
Criteria JORC Code explanation Commentary
Procedures match with Industry best practice.
• Samples are collected into securely tied bags and placed
into cable-tied plastic bags for transport to the laboratory.
Each sample batch has a sample submission sheet that
lists the sample numbers and the work required to be done
on each sample.
• Samples were transported to the laboratory by company
vehicle using trusted company personnel.
• Sample pulps (after assay) are held by the laboratory and
returned to the company after 90 days.
Audits or reviews • The results of any audits or reviews of sampling techniques and data. • No reviews or audits of the sampling techniques or data
have been carried out to date.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
• The Cangallo project is located approximately 25 km
east of the town of Chala in the south of Peru.
• The Cangallo project comprises 14 granted mineral
concessions. The tenements are held by Questdor which
is a 100% subsidiary of AusQuest Limited.
• There are no major heritage issues to prevent access to
the tenements. A drill permit (FTA) has been provided
by INGEMMET for the drilling program following
environmental, and community approvals.
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties. • No historic exploration data is available.
Geology • Deposit type, geological setting and style of mineralisation. • The Cangallo project is targeting Porphyry deposits
along the coastal belt of southern Peru. These are large
scale disseminated copper (and gold) deposits found
within orogenic belts that surround the Pacific Rim. The
deposits can be really large requiring significant drilling
5
Criteria JORC Code explanation Commentary
to evaluate.
Drill hole
Information
• A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
• All relevant drill hole data and information are provided
below.
Data aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be clearly
stated.
• Aggregate assay intervals quoted for the RC drill-holes
in this report are based on copper assays, using a cut-off
value of ~0.1% Cu, and maximum internal waste of 6
metres.
• For higher grade intervals (quoted as including) a 0.3%
Cu cut-off and a 6m internal waste limit were used.
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly important in the reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).
• All intervals reported will be down-hole lengths. True
widths will be unknown at this stage.
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
• All drill holes are shown on appropriate plans and
included in the ASX release.
• Relevant drill-hole cross sections have been provided
with the release.
Balanced reporting • Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
• At this early stage of drilling, only significant assay
results have been reported.
Other substantive
exploration data
• Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics; potential deleterious
or contaminating substances.
• The relationship between this third phase of RC drilling
and previous exploration data is shown in the release.
6
Criteria JORC Code explanation Commentary
Further work • The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
• Further RC and diamond drilling are planned to define
the outer limits of the porphyry system and locate the
centre of the system.
Drill-Hole Details
Hole ID Easting Northing RL (m) Azimuth Inclination Depth (m)
CANRC022 603635 8244713 1158 90 -60 415
CANRC023 603627 8244704 1158 270 -60 402
CANRC024 603872 8244711 1164 270 -60 420
CANRC025 603774 8244464 1162 90 -58 387
CANRC026 603756 8244463 1167 270 -59 402
CANRC027 603456 8244444 1150 90 -59 435
CANRC028 603447 8244443 1150 270 -59 396
CANRC029 604085 8244455 1168 270 -59 280
CANRC030 604092 8244460 1168 50 -59 360
CANRC031 603692 8244218 1153 270 -59 402
CANRC032 603706 8244221 1153 90 -59 444
CANRC033 603972 8244215 1162 90 -60 408
CANRC034 603966 8244215 1162 270 -64 468
CANRC035 604322 8244430 1179 90 -59 342
CANRC036 604307 8244432 1179 270 -60 255
CANRC037 604327 8244576 1178 90 -59 408
CANRC038 604310 8244574 1178 270 -59 408
CANRC039 603887 8244709 1164 90 -59 402
CANRC040 604391 8245552 1192 90 -59 402
CANRC041 604385 8245554 1192 145 -59 400
Projection: WGS84 Zone 18S
Share your feedback
Discover