Blue Billy Zinc Prospect Drilling Update
Released
Released
Announcement PDF
October 5, 2017
ASX Release
BLUE BILLY ZINC PROSPECT – DRILLING UPDATE
Favourable host rocks for sediment-hosted zinc intersected in maiden drill program
AusQuest Limited (ASX: AQD) is pleased to announce the completion of its first drilling
program under its strategic alliance with South32 (ASX: S32). The initial reconnaissance
diamond drilling program was completed at the Blue Billy Zinc Joint Venture Project, located
~100km south-west of Paraburdoo, within the Edmund Basin in Western Australia.
All four drill holes intersected thick intervals (up to 285m) of pyritic and carbonaceous shales,
which are considered to be favourable host rocks for sediment-hosted zinc mineralisation,
similar to those found in north-west Queensland.
The drilling program was designed to provide an initial test of the prospective stratigraphy
close to the Talga Fault in order to identify potential vectors to mineralisation. Drill-holes
were spaced between 4km and 10km apart to test a 15km strike length of the target horizon
for indicators of nearby base metal mineralisation (see Figure 1).
Figure 1: Blue Billy JV geology showing wide spaced drill-hole locations
Traces of sphalerite (Zn) and galena (Pb) plus thicker pyritic shale sequences that were
evident in the two northern-most drill-holes (BB03 and BB04), suggest the presence of base
AusQuest Limited 8 Kearns Crescent Ardross WA 6153 (T): 08 9364 3866 (F): 08 9364 4892
www.ausquest.com.au
metal bearing fluids within the basin and the potential for nearby structures which may have
helped to concentrate mineralisation in this area.
Core has been cut and sampled on a 1 metre basis with half core samples (~2,150) dispatched
for analysis. Assay data for the four drill-holes are expected around the end of October.
Geochemical indicators will be identified and vectors to mineralisation determined once all
the assay data have been received.
The Blue Billy Zinc Project is subject to a joint venture agreement with South32 whereby
South32 can earn a 70% interest in the project by spending US$4.0 million. This was the first
drilling program to be commissioned under the Company’s Strategic Alliance with South32.
AusQuest’s Managing Director Graeme Drew said the indications from the drilling to date
were in line with expectations given the highly reconnaissance nature of the initial drilling
program.
“The proof of concept will be in the geochemical data once it has been received and
processed, as this will help us to vector into potential accumulations of mineralisation – which
will likely be the focus of future drilling,” he said.
Graeme Drew
Managing Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr Graeme
Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining and
Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as a Competent Person
as defined in the December 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in the report of the matters based upon his information
in the form and context in which it appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements concerning
mining reserves and resources may also be deemed to be forward looking statements in that they involve estimates based on
specific assumptions. Forward-looking statements are not statements of historical fact and actual events and results may
differ materially from those described in the forward looking statements as a result of a variety of risks, uncertainties and
other factors. Forward looking statements are based on management’s beliefs, opinions and estimates as of the dates the
forward looking statements are made and no obligation is assumed to update forward looking statements if these beliefs,
opinions and estimates should change or to reflect other future developments.
AusQuest Limited 8 Kearns Crescent Ardross WA 6153 (T): 08 9364 3866 (F): 08 9364 4892
www.ausquest.com.au
JORC Code, 2012 Edition – Table 1 report, Diamond Drilling at Blue Billy Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public Report.
• In cases where ‘industry standard’ work has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
• The core was continuously sampled on a 1 metre basis
throughout the target horizon and within the immediate
footwall and hangingwall sequences.
• Core was cut in half with half sent for analysis and half
retained for geological and quality control purposes
• Sample intervals were measured by tape from depth
intervals shown on core blocks labeled by the drillers, as
per standard industry practice.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and results
assessed.
• Measures taken to maximise sample recovery and ensure representative nature of the
samples.
• Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
• Core recovery was determined by comparing core lengths
measured against drilled intervals shown on core blocks
and recorded on the logs.
• Experienced diamond drillers were engaged to ensure
maximum core recovery.
• Sample recovery was high negating any sample bias due
to recovery.
Logging
• Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
• Drill core and sample chips were logged by experienced
geologists to identify key rock types, alteration and
mineralisation styles.
• Core logging is qualitative with visual estimates of
Drilling techniques
1
• Diamond Drilling with an RC pre-collar.
• HQ and NQ drill rods used to produce 63.5mm and
47.6mm diameter core respectively. The hole starts with
HQ core and changes to NQ at the appropriate depth
depending on drilling conditions.
• Down-hole surveys were read at ~ 30m intervals.
Criteria
Sub-sampling
techniques and
sample preparation
Quality of assay
data and
laboratory tests
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
JORC Code explanation
Commentary
photography.
• The total length and percentage of the relevant intersections logged.
mineralisation made for later comparison with assay
results.
• All core was logged and photographed.
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material being sampled.
• The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and
precision have been established.
• The verification of significant intersections by either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Samples were collected by cutting the core in half along
its length and sampling over 1 metre intervals.
• The sample sizes are appropriate for the geological
materials being sampled.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Diamond drill-holes were widely spaced located between
3,000m and 10,000m apart to test prospectivity of the
target stratigraphy. No systematic drilling of targets has
been undertaken.
2
• N/A for this report – Sample analysis has not been
undertaken.
• The Company inserts standards within each batch of
samples on a 1 in 20 basis.
• N/A for this report – Assay results are pending.
• Drill hole collars including elevation are located by hand
held GPS to an accuracy of approximately 5m.
• Down hole surveys are carried out every 30m down hole,
and at the end of the hole.
• All surface location data are in GDA 94 datum, zone 50S.
Criteria
JORC Code explanation
Commentary
• Whether sample compositing has been applied.
• Any bias due to the orientation of the drilling is unknown
at this early stage of exploration.
Sample security
• Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
• The measures taken to ensure sample security.
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
• No reviews or audits of the sampling techniques or data
have been carried out to date.
Orientation of data
in relation to
geological
structure
• Samples are collected into securely tied bags and placed
into cable-tied plastic bags for transport to the laboratory.
Each sample batch has a sample submission sheet that
lists the sample numbers and the work required to be done
on each sample.
• Reputable freight companies are used to transport samples
to the laboratory.
• Sample pulps (after assay) are held by the laboratory and
returned to the company after 90 days.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
• The Blue Billy Prospect is centered at 7401000N and
456000E (GDA94 Zone 50), approximately 200 km
north east of Gascoyne Junction in Western Australia.
• Tenement holdings include one granted Exploration
Licence (E08/2754) and one application (E08/2904).
• The Blue Billy Prospect is subject to a joint venture
agreement with South32 who can earn 70% by spending
US$4.0M.
• Aboriginal heritage surveys are routinely completed
ahead of ground disturbing activities..
3
Criteria
JORC Code explanation
Commentary
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties.
• Previous exploration drilling completed by Pasminco
(1991-96) and Alcoa (1979-82) intersected 20 to 50m of
anomalous zinc (0.1 to 0.5%Zn) immediately down dip
from surface occurrences of the Blue Billy Formation
highlighting the areas prospectivity. Aurora Minerals
completed soil sampling and geophysical surveys along
the Talga Fault (2008-11) but did not drill any holes.
Geology
• Deposit type, geological setting and style of mineralisation.
• The Blue Billy project is targeting sediment hosted zinc
mineralisation similar to NW Queensland. The Blue
Billy Formation black shale horizon within the Edmund
Basin in WA is the target horizon.
Drill hole
Information
• A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be clearly
stated.
• These relationships are particularly important in the reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).
• All relevant drill hole data and information are provided
below.
• Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
• All drill holes are shown on appropriate plans and
included in the ASX release.
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
4
• N/A for this report – Assay results are pending.
• N/A for this report. Assays are pending
Criteria
Balanced reporting
Other substantive
exploration data
Further work
Hole No
17BBDD001
17BBDD002
17BBDD003
17BBDD004
JORC Code explanation
Commentary
limited to a plan view of drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
• Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics; potential deleterious
or contaminating substances.
• The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
Easting
463598
460215
455955
448066
Northing
7399009
7397610
7400333
7407636
RL
294.0
291.0
287.0
252.0
Azimuth
30
210
210
220
Inc
-80
-80
-70
-75
5
Total Depth
751.0
649.0
424.0
744.8
• N/A for this report. Assays are pending
• The relationship between current drilling and previously
reported exploration data is shown in the report.
• Future drilling will be dependent on results from the
current programme.
Share your feedback