Update - DTR Produces Premium Grade Product (Fe) at Morrisey
Released
Released
Announcement PDF
18 September 2024
Australian Securities Exchange
Level 40, Central Park
152-158 St Georges Terrace
Perth WA 6000
Dear Sir / Madam
Update: DTR Produces Premium Grade Product (Fe) at Morrisey
AusQuest Limited (ASX: AQD) advises that further to the ASX announcement “DTR Produces Premium
Grade Product (Fe) at Morrisey” released earlier today, reference to previous drill results and an
update to the drilling details table have been included in the attached announcement.
Yours faithfully
Henko Vos
Company Secretary
AusQuest Limited 8 Kearns Crescent Ardross WA 6153 (T): 08 9364 3866 (F): 08 9364 4892
www.ausquest.com.au
Visit Investor Hub for a video update.
September 18th, 2024
PREMIUM >70% Fe IRON PRODUCT ACHIEVED AT THE
WATERFALL PROSPECT – MORRISEY PROJECT, WA
Key Points:
•
Davis Tube Recovery (DTR) produces >70% Fe from the first three drill-holes.
•
Magnetite recoveries average 40% for 106um, 75um and 38um grind sizes.
•
Program funded under the Strategic Alliance Agreement.
AusQuest Limited (ASX: AQD) is pleased to advise that it has successfully produced a
premium iron product grading >70% Fe from DTR test work completed on samples collected
from the first three drill-holes at the Waterfall Prospect, part of its 100%-owned Morrisey
Project in Western Australia’s Midwest mining district.
The program achieved excellent magnetite recoveries (40%) from each grind size trialled
(106um, 75um, and 38um), highlighting the potential for the prospect to deliver a premium
iron (Fe) product and enhancing its future commercial potential. The Morrisey Project is
located ~120km north of the town of Mullewa, where there is rail access to the Port of
Geraldton (Figure 1).
Figure 1: Morrisey Project: Location Plan showing road and rail access to the Port of Geraldton.
JOIN AUSQUEST’S INTERACTIVE INVESTOR HUB.
Visit AUSQUEST.COM.AU for AusQuest’s interactive Investor Hub
AusQuest Limited ABN 35 091 542 451 | 8 Kearns Crescent Ardross WA 6153
Figure 2. Waterfall Prospect: Gravity image showing the location of RC drill-holes and significant Fe
assays as reported to ASX on June12 2024 – “Drill Assays Confirm Significant Magnetite at Morrisey
Project WA”). Drill-holes used for trial DTR test work are also highlighted.
DTR test results have been received from three RC drill-holes (MYRC01, 04, and 07) that
were selected to optimise the sample preparation process and test the various grind sizes
available, before the bulk of the samples were processed.
Results confirmed that iron (Fe) grades greater than 70% Fe could be produced from all
three grind sizes (106um, 75um and 38um) for each of the 16 composite samples tested.
There was no discernible difference in product grades and magnetite recoveries between the
two finer grind sizes, and only a slight deterioration in Fe grade from the grind size 106um to
75um, suggesting that a coarse grind may be all that is required to separate magnetite from
the other gangue material (see Tables 1, 2 and 3 below).
Importantly, deleterious elements such as silica (SiO2), alumina (Al2O3), sulphur (S) and
phosphorous (P) were all very low, only slightly increasing within the coarser grind product.
The remaining composite samples (~84) are now being processed to determine variations in
recovery, product grade and deleterious element content across the prospect using the two
coarser grind sizes, before next steps are decided in consultation with the Company’s
Strategic Alliance partner, being a wholly owned subsidiary of South32 Limited.
AusQuest’s Managing Director, Graeme Drew, said the Company was very pleased with the
results of the beneficiation test work from the first three holes, which demonstrated that a
coarse grind size should be adequate in separating magnetite from the rest of the rock and
producing a premium (>70% Fe) product.
2
“We are now looking forward to receiving the rest of the results from the Davis Tube
Recovery test work and mapping out product grades and recoveries across the whole
prospect,” Mr Drew said.
“This will help us to assess the commercial potential of this prospect and determine next
steps in assessing the greater potential of the Morrisey Project as a whole.
“The Board looks forward to providing further updates to shareholders over the coming
weeks and months as results from the beneficiation test work become available.”
Graeme Drew
Managing Director
Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of
Mining and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as
a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in
the report of the matters based upon his information in the form and context in which it appears
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on
management’s beliefs, opinions and estimates as of the dates the forward looking statements are made and no
obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should
change or to reflect other future developments.
3
Table 1: Davis Tube Recovery Test results for 38um grind size – drill holes MYRC01, 04, 07
GRADE
38um DTR CONCENTRATE GRADES
From
To
Length
Recovery
SiO2 Al2O3
Drill-Hole
Fe %
Fe %
S%
(m)
(m)
(m)
%
%
%
MYRC001
MYRC004
MYRC007
102
112
122
132
64
74
84
94
104
118
100
110
120
130
140
150
112
122
132
144
74
84
94
104
108
122
110
120
130
140
150
156
10
10
10
12
10
10
10
10
4
4
10
10
10
10
10
6
33.61
32.04
31.51
36.41
33.43
32.96
26.21
30.45
33.11
22.41
32.37
32.30
31.45
31.36
36.41
39.23
36.49
40.48
38.78
47.35
36.74
42.24
32.89
36.08
40.82
27.97
38.03
39.77
38.23
40.04
47.97
52.89
71.11
71.06
70.85
71.47
70.69
71.18
70.90
70.90
70.92
70.56
70.69
70.98
70.25
70.91
71.25
71.38
1.23
1.27
1.34
0.97
1.34
1.38
1.51
1.76
1.60
2.00
1.58
1.45
1.59
1.61
1.41
1.04
0.24
0.05
0.08
0.07
0.2
0.06
0.16
0.16
0.13
0.27
0.18
0.14
0.16
0.09
0.08
0.07
0.011
0.003
0.002
0.004
0.012
0.003
0.008
0.006
0.003
0.003
0.014
0.002
0.001
0.002
0.004
X
P%
0.002
0.002
0.003
0.003
0.002
0.002
0.002
0.003
0.003
0.002
0.002
0.003
0.003
0.003
0.003
0.003
Table 2: Davis Tube Recovery Test results for 75um grind size – drill holes MYRC01, 04, 07
75um DTR CONCENTRATE GRADES
Drill-Hole
From
(m)
To
(m)
Length
(m)
Fe %
Recovery
%
Fe %
SiO2
%
Al2O3
%
S%
P%
MYRC001
102
112
10
33.39
36.5
70.65
1.51
0.22
0.012
0.002
112
122
10
32.04
40.48
71.20
1.74
0.05
0.003
0.002
122
132
10
31.51
38.78
71.09
1.66
0.04
0.002
0.002
132
144
12
36.23
47.57
71.41
0.95
0.05
0.006
0.002
64
74
10
33.17
36.74
71.53
1.05
0.2
0.014
0.002
74
84
10
32.76
42.07
71.12
1.25
0.05
0.002
0.002
84
94
10
26.12
32.4
71.54
0.85
0.1
0.008
0.001
MYRC004
MYRC007
94
104
10
30.19
36.51
70.34
2.12
0.12
0.006
0.003
104
108
4
33.24
41.29
70.54
2.00
0.09
0.004
0.002
118
122
4
22.54
28.34
70.71
1.69
0.19
0.002
0.002
100
110
10
33.18
39.02
71.08
1.33
0.16
0.015
0.002
110
120
10
31.94
39.74
71.47
1.19
0.12
0.002
0.002
120
130
10
32.15
38.73
70.51
1.91
0.13
0.002
0.003
130
140
10
31.57
41.31
70.68
1.80
0.06
0.002
0.003
140
150
10
35.37
47.63
70.69
1.57
0.05
0.004
0.003
150
156
6
39.25
52.47
71.98
0.5
0.06
0.004
0.002
4
Table 3: Davis Tube Recovery Test results for 106um grind size – drill holes MYRC01, 04, 07
GRADE
106um DTR CONCENTRATE GRADES
From
To
Length
Recovery
SiO2 Al2O3
Drill-Hole
Fe %
Fe %
S%
(m)
(m)
(m)
%
%
%
MYRC001
MYRC004
MYRC007
102
112
122
132
64
74
84
94
104
118
100
110
120
130
140
150
112
122
132
144
74
84
94
104
108
122
110
120
130
140
150
156
10
10
10
12
10
10
10
10
4
4
10
10
10
10
10
6
33.42
31.92
31.29
35.94
33.21
32.74
26.02
30.51
32.61
22.41
32.71
31.71
27.81
31.62
37.16
38.78
37.45
41.73
40.32
48.12
37.09
43.1
32.46
37.19
41.87
28.15
38.79
40.09
33.74
41
49.39
52.16
69.87
69.69
69.44
70.61
70.98
70.24
71.26
69.42
69.06
70.75
70.75
70.82
69.89
69.98
70.12
71.93
2.84
3.1
3.48
2.08
1.71
2.49
1.34
3.24
3.51
1.47
1.47
1.6
3.11
3.06
2.34
0.38
0.23
0.04
0.05
0.05
0.2
0.05
0.09
0.11
0.09
0.13
0.13
0.13
0.13
0.07
0.07
0.06
0.014
0.004
0.003
0.005
0.014
0.004
0.011
0.006
0.005
0.002
0.002
0.002
0.002
0.004
0.003
X
P%
0.003
0.003
0.003
0.003
0.003
0.002
0.01
0.003
0.003
0.002
0.002
0.003
0.004
0.004
0.003
X
X denotes below detection
5
JORC Code, 2012 Edition – Table 1 Report: Davis Tube Recovery test for Magnetite
intersected in RC drilling at the Morrisey Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
•
•
•
•
•
•
•
RC drilling was used to obtain 1m split samples which were
composited over 2m using an onboard cone splitter.
Sample depths were determined by the length of the rod
string and confirmed by counting the number of samples
and rows as per standard industry practice.
Sample weight of each 2m composite sample submitted for
analysis was approximately 3kg.
The remainder of each 1m sample was collected in large
plastic sample bags and placed in rows at the drill site with
each sample representing a 1m interval.
Sampling for DTR tests comprised the collection of
consecutive 1m samples using a rifle splitter to provide
representative samples for compositing.
3-5 kg of sample was split from each 1m sample.
The 1m samples were aggregated into composite samples
at Intertek Laboratories by means of the following
procedure:
▪
▪
▪
▪
▪
1
Prepare constant mass composites of 2 kg as
described below.
Samples passed through a Boyd (or equivalent)
crusher to reduce top size to 2-3mm.
Weigh out 2000/n grams of each sample where n is the
number of samples in the composite - for example, if
there are 10 samples in the composite, each sample
will be 2000/10 = 200grams.
Mix the composites thoroughly by milling for 5 (five)
seconds in an LM5 mill.
Prepare a duplicate of two of the composites - to
confirm sample accuracy.
Criteria
JORC Code explanation
Commentary
▪
Drilling techniques
Drill sample
recovery
Logging
Sub-sampling
techniques and
sample preparation
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
2
Once composites are prepared, weigh out 150g for
106um, 75um and 38um DTR tests.
• Reverse circulation (RC) drilling with 4.5 inch face sampling bit.
• Experienced RC drillers and an appropriate rig size were used
to ensure maximum sample recovery.
• Sample quality and recovery was noted for each metre.
• At this early stage of exploration it is not possible to identify any
relationship between sample recovery and assay grade.
• RC sample chips were logged by an experienced geologist to
identify key rock types and mineralisation styles.
• Sample logging was qualitative with visual estimates of mineral
composition made for later comparison with assay results.
• All samples were logged.
• RC samples were collected every 1 metre and presented in
rows corresponding to sample depth.
• Assay samples were collected every 2m utilising a cone spltter
on the rig’s cyclone to produce a representative composite
sample for assay.
• Certified standards, blanks or field duplicates were inserted
every twentieth sample for initial quality control purposes.
• The sample sizes are considered appropriate for the geological
materials sampled.
• Initial assay results were reported in AusQuest ASX release
dated 12th June 2024.
• Samples for DTR tests were composited into 4m, 6m, 10m or
12m down hole intervals
Criteria
Quality of assay
data and
laboratory tests
JORC Code explanation
•
•
•
Commentary
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision have
been established.
3
• The sample sizes are considered appropriate for the geological
materials sampled.
• Assaying of the drill samples is by standard industry practice.
For DTR Test work, the following procedure applies:
• Starting weight 150 g for each sample, preparation as
described in Section 1;
• Wet screen (75um), dry;
• Record weight oversize;
• Regrind oversize (4 sec for every 5g oversize)
• Repeat dry screen until < 5g oversize;
• Record weight;
• Split 20g P80/75um sample for DTR, with rest for (head
grade) assay;
• Conduct DTR recovery;
• Analyse separately DTR sample and P80/75 um (head
grade) sample - 24 element Li borate fusion/ XRF Fe,
Al2O3, As, BaO, CaO, Cl, Co, Cr2O3, Cu, K2O, MgO, MnO,
Na2O, Ni, P, Pb, S, SiO2, Sn, Sr, TiO2, V2O5, Zn, Zr.
DAVIS TUBE SPECIFICATIONS AS FOLLOWS:
• Pulveriser Bowl 150ml
• Sample mass 20g
• Stroke Frequency 60/min
• Stroke Length 50mm
• Magnetic field strength 3000Ga
• Tube Angle 45°
• Tube Diameter 40mm
• Water flow rate 450 to 490 ml/ minute
• Wash time 15 minutes
CONCENTRATE REMOVAL PROCESS:
• Stop the agitation
• Shut off the water
• Drain the water
• Weigh the concentrate beaker and place at tend of tube
• Switch off the magnet
• Flush the tube with DI water
• Dry beaker and weigh to get net concentrate weight
• Submit feeds and cons for XRF analysis.
Criteria
JORC Code explanation
Commentary
• Data from the laboratory’s internal quality procedures
(standards, repeats and blanks) are reviewed to check data
quality.
• Assays are provided by Intertek Genalysis, Maddington, WA
which is a certified laboratory for mineral analyses. Analytical
data is transferred to the company via email and by hard copy.
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
Orientation of data
in relation to
geological
structure
Sample security
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• No verification of intersections was undertaken.
• Sample details were compiled into Excel spreadsheets for
merging with assay data.
• Digital data is regularly backed-up on the company’s servers.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
• Drill holes were spaced ~ 150m x 100m apart along five grid
sections and drilled to depths of ~200m (see table below).
• Data spacing is considered sufficient to provide an indication of
geological and possibly grade continuity within the area drilled.
4
• Drill hole collar locations were established with a handheld GPS
to +/- 5m accuracy.
• Down hole surveys were carried out below the collar and at the
bottom of each hole using a multi-shot gyro system.
• Grid system used is GDA94 Zone 50S.
• Any bias due to the orientation of the drilling is unknown at this
early stage of exploration.
• Samples were collected in securely tied bags and placed into
cable-tied polywoven for transport to the assay laboratory,
accompanied by a sample submission sheet listing sample
numbers and required sample preparation and assay
procedures.
• Reputable companies are used to transport samples to the
laboratory.
Criteria
JORC Code explanation
Commentary
• Sample pulps (after assay) are held by the laboratory and
returned to the company if requested after 90 days.
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
• No audits or reviews have been carried out on the sampling.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
•
•
•
•
•
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties.
•
•
•
5
The Morrisey Project is located approximately 150 km northeast of Geraldton in Western Australia.
Tenement holdings consist of three granted Exploration
Licences E70/5383, E09/2397, and E59/2526 held 100% by
AusQuest.
The Morrisey Project is subject to a Strategic Alliance
Agreement whereby South32 have the right to earn a 70%
interest by spending US$4.5M.
The tenements are located partly within (WC2004/010) Wajarri
Yamatji #1Native Title Claim (partially determined) and partially
within (WC1996/093) Mullewa Wadjari Community Native Title
Claim.
Aboriginal heritage surveys are routinely completed ahead of
ground disturbing activities.
Previous exploration is very limited and was mainly focused on
iron ore and gold targets together with some regional diamond
exploration by Stockdale Prospecting and CRA Ltd.
Limited aircore drilling and surface lag sampling was reported
by several companies that were targeting magnetic anomalies
as possible iron ore or nickel prospects but no RC or diamond
drilling has been reported.
DetaiIed aeromagnetic data was acquired over the northern
half of EL 70/5383 and the southern part of EL 70/2397 as part
Criteria
JORC Code explanation
Commentary
of a search for iron ore. This data is being used by the current
exploration in the area
Geology
• Deposit type, geological setting and style of mineralisation.
•
•
Drill hole
Information
Data aggregation
methods
Relationship
between
mineralisation
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
6
The Morrisey Project is targeting coarse-grained magnetite
mineralization that can be beneficiated to produce a high grade
product (>70% Fe). The Narryer terrane is a complex structural
area containing high grade metamorphic rocks including
banded iron formations which appear to be the protoliths to the
mineralization being sought.
Nickel-copper-PGE mineralisation is also being targeted within
mafic/ultramafic intrusions in the Narryer Terrane which forms
the NW margin of the Yilgarn Craton.
• All relevant drill hole data are provided below.
• Intersections quoted in the ASX release of 12 June 2024 and
used to decide composite intervals for DTR test work, are
based on an Fe cut-off grade of 20%Fe, an average magnetic
susceptibility >0.2SI units, a minimum width of 4 metres and
maximum internal waste of 4 metres.
• Down hole lengths are reported - the relationship between
mineralization widths and intercept widths is not known at this
stage, although drill directions appear to provide a reasonable
Criteria
JORC Code explanation
widths and
intercept lengths
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Diagrams
Balanced reporting
Commentary
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Other substantive
exploration data
Further work
estimate of mineralization thickness.
• Drill holes locations are shown on an appropriate plan and in
the ASX release and tabulated below.
• Significant assay results are provided in the ASX release 12
June 2024. The aggregation method is described above.
Magnetic susceptibility readings were recorded using a
magROCK susceptibility meter on every one-metre sample and
averaged over two metre intervals to match the sample interval.
Magnetic susceptibility readings provide a good indication of
where magnetite occurs but not necessarily Fe grade or %
magnetite
• The area was selected for drilling based on modelled
electromagnetic targets in conjunction with geological,
geochemical magnetic and gravity interpretations by the
company.
• Proposals of further work will be made after a thorough analysis
of the current data is completed.
Drilling Details:
Hole_No
Prospect
Easting
Northing
RL
Datum
Zone
Azimuth
Inc
RC_Depth
22MYRC001
Waterfall
300
302
50
270
-60
246
Waterfall
6972580
6972503
GDA94
24MYRC004
370820
370741
GDA94
50
313
-59.7
225
7
24MYRC005
Waterfall
24MYRC006
Waterfall
24MYRC007
Waterfall
24MYRC008
Waterfall
24MYRC009
Waterfall
24MYRC010
Waterfall
24MYRC011
Waterfall
24MYRC012
Bilga South
24MYRC013
Toola Well
24MYRC014
Toola Well
24MYRC015
Waterfall
24MYRC016
Waterfall
24MYRC017
Waterfall
24MYRC018
Waterfall
24MYRC019
Waterfall
24MYRC020
Waterfall
24MYRC021
Waterfall
370825
370647
370739
370549
370650
370531
370599
391773
400867
401349
370647
370911
370471
370727
370361
370465
370650
6972448
6972383
6972323
6972254
6972206
6972159
6972102
7013772
6989501
6989689
6972555
6972397
6972302
6972153
6972001
6971969
6972205
298
309
301
313
304
309
306
289
275
276
307
294
311
298
305
303
304
GDA94
50
322
-60
225
GDA94
50
303.3
-58.8
225
GDA94
50
301.06
-59.39
225
GDA94
50
307
-59
228
GDA94
50
302.8
-58.8
225
GDA94
50
300.66
-59.28
228
GDA94
50
299.22
-59.17
225
GDA94
50
319.7
-59.2
228
GDA94
50
87.51
-60.59
200
GDA94
50
273.4
-59.4
162
GDA94
50
303.4
-60.9
210
GDA94
50
301.99
-60.42
152
GDA94
50
305.5
-58.5
180
GDA94
50
301.7
-60.5
114
GDA94
50
306.3
-58.99
174
GDA94
50
295.14
-60.49
220
GDA94
50
239.7
-89.16
204
8
Share your feedback
Discover