AusQuest Limited (ASX: AQD) advises that further to the ASX announcement “High Priority Targets defined
by VTEM Survey at Ballodonia” this morning, a JORC table has been included in the attached
announcement.
Yours faithfully
Henko Vos
Company Secretary
1
January 11th, 2024
MULTIPLE HIGH-PRIORITY TARGETS IDENTIFIED BY
VTEM SURVEY AT BALLADONIA, WA
Extensive survey reveals both base metal and carbonatite targets
Further to its ASX release of December 5th, AusQuest Limited (ASX: AQD) is pleased to
advise that the airborne VTEM survey successfully completed last month over the Balladonia
Project in the Fraser Range region of WA has identified a number of high-priority EM targets.
The survey, comprising a total of 1,104km, was flown along east-west flight lines spaced
200m apart using the helicopter-mounted VTEM Max system and a base frequency of 25Hz.
Images of the vertical component of the electromagnetic (B) field and calculated time
constants (a measure of conductivity) are presented in Figure 1.
Preliminary interpretation of the VTEM data has highlighted several strong EM responses
indicative of potential massive sulphide mineralisation (anomalies A to E).
These conductors are generally discrete in nature, extending over 2-5 flight lines (300m to
1,000m in length) and are clearly evident in the late-time channels of the survey data
(channel 48) and the ‘Time Constant’ image, which highlights the stronger conductive
responses often associated with sulphide mineralisation.
Figure 1: Balladonia Project: VTEM images of Channel 48 (Vertical B field component) and the B field
Time Constant, showing outlines of the interpreted EM targets.
Large strike length anomalies such as anomaly F are considered more likely to reflect
graphitic source rocks, with conductivity variations along the length of the conductors
reflecting the possibility of increased thickness of graphite and/or the addition of sulphide
mineralisation.
Moderate conductive responses (anomalies G to J) that coincide with distinct magnetic lows
are considered potential carbonatite targets based on comparisons with geophysical
responses over the Telegraph carbonatite that was drilled by the Company in 2020 (ASX
Release – May 7th 2020).
These EM targets, which occur along a linear trend stretching over ~15km, are thought to
represent a series of dyke-like intrusions associated with the NNW trending structures
(Figure 2).
Figure 2: Balladonia Project: VTEM image of B field Time Constant and Reduced to Pole (RTP)
magnetics showing outlines of the interpreted EM targets.
Targets K and L (Figure 2), which are localised areas of increased conductivity, are thought
to reflect possible alteration associated with the Tea Tree stratigraphy – which is believed to
contain prospective host rocks for Broken Hill Type (BHT) mineralisation.
Earlier reconnaissance drilling at Balladonia (as reported on 22nd September 2023)
confirmed the presence of widespread prospective host rocks for BHT mineralisation, while
also supporting the possibility of carbonatite-related mineralisation (including base metals
and/or rare earth elements) within the project area.
Further exploration at Balladonia is currently the subject of discussions under the Strategic
Alliance Agreement (SAA) with a wholly-owned subsidiary of South32 Limited.
AusQuest’s Managing Director, Graeme Drew, said the VTEM survey had generated a series
of compelling targets, further elevating the prospectivity of the Balladonia Project.
“This is an exciting new development for Balladonia and we are looking forward to following
the targets generated by this extensive VTEM survey,” he said.
2
“Exploration at Balladonia continues to provide us with encouragement that a new base
metal and possibly rare earth element discovery could be made in this area. We are looking
forward to continuing our efforts in this area and reporting results as and when they come to
hand.”
Graeme Drew
Managing Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of
Mining and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as
a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in
the report of the matters based upon his information in the form and context in which it appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on
management’s beliefs, opinions and estimates as of the dates the forward looking statements are made and no
obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should
change or to reflect other future developments.
3
JORC Code, 2012 Edition – Table 1 report, Balladonia VTEM Survey Results
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public Report.
• In cases where ‘industry standard’ work has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what
method, etc).
• Method of recording and assessing core and chip sample recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure representative nature of the
samples.
• Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and appropriateness of the sample preparation
• A helicopter-borne Versatile Transient Electromagnetic
survey (VTEM Max) using a base frequency of 25Hz
was completed by UTS Geophysics along E-W flight
lines spaced 200m apart with an EM sensor height of
~35m
• The VTEM Max system uses a transmitter loop
diameter of 35m, a peak dipole moment of 700K NIA, a
transmitter pulse width of 7ms and a three component
receiver coils.
Drilling techniques
Drill sample
recovery
Logging
Sub-sampling
techniques and
sample preparation
1
• Not applicable
• Not applicable
• Not applicable
• Not applicable
Criteria
Quality of assay
data and
laboratory tests
Verification of
sampling and
assaying
Location of data
points
JORC Code explanation
Commentary
technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material being sampled.
• The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and
precision have been established.
• The verification of significant intersections by either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Not applicable
• Not applicable
• VTEM survey data were located using a Novatel GPS
receiver which records the helicopter location in three
dimensions to a resolution of 2 to 3 metres.
• All location data are recorded in GDA94 datum, UTM
zone 51.
Data spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Flight lines were flown east west at a nominal 200
metre spacing which was deemed appropriate for the
targets being sought.
• Data points are acquired every 2 to 4 metres along the
survey line.
Orientation of data
in relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
• The measures taken to ensure sample security.
• The VTEM survey lines were oriented approximately
perpendicular to geological strike.
Sample security
2
• All data produced by the survey was transmitted
electronically from the contractor to the Company’s
Criteria
JORC Code explanation
Commentary
consultant.
Audits or reviews
• The results of any audits or reviews of sampling techniques and data.
• Data quality was reviewed on an ongoing basis by the
Company’s consultant.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement and land
tenure status
• Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
• The Balladonia Project is centered at 6411000N and
515500E (GDA94 Zone 51), approximately 135 km
ESE of Norseman in Western Australia.
• Tenement holdings include six granted Exploration
License’s (E69/3246, 3825, 3671, 3558, 3932, 3559)
and one Exploration License application (E69/3672).
• The Balladonia Prospect is subject to a Strategic
Alliance Agreement whereby South32 have the right
to earn a 70% interest by spending US$4.5M.
• Aboriginal heritage surveys and fauna – Flora surveys
are routinely completed ahead of ground disturbing
activities.
Exploration done by other
parties
• Acknowledgment and appraisal of exploration by other parties.
• Limited surface exploration has been completed by
other parties. AusQuest is the first exploration
company to complete drilling programs within the
tenements.
• The tenements have been covered by regional
government geophysical and geological surveys and
partly by regional GSWA geochemical sampling.
Geology
• Deposit type, geological setting and style of mineralisation.
• The exploration model for the Balladonia Project is
based upon copper and nickel sulphides hosted in
mafic rocks as is the case within the Fraser Range
Belt, and base metal mineralisation in BHT and /or
IOCG settings similar to the Eastern Succession in
north-west Queensland and at Broken Hill in NSW.
Potential for carbonatite related mineralization is also
evident.
3
Criteria
JORC Code explanation
Drill hole Information
• A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the
drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information is
not Material and this exclusion does not detract from the understanding of the
report, the Competent Person should clearly explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are
usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation
should be stated and some typical examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• These relationships are particularly important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with respect to the drill hole angle is known,
its nature should be reported.
• If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
• Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not
be limited to a plan view of drill hole collar locations and appropriate sectional
views.
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
• Other exploration data, if meaningful and material, should be reported including
(but not limited to): geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating substances.
Data aggregation methods
Relationship between
mineralisation widths and
intercept lengths
Diagrams
Balanced reporting
Other substantive
exploration data
Commentary
4
• Not applicable
• Not applicable
• Not applicable
• Relevant EM data are shown on appropriate plans and
included in the ASX release.
• All significant results are reported.
• The relationship between the EM results and
previously reported exploration data is discussed in the
report.
Criteria
JORC Code explanation
Commentary
Further work
• The nature and scale of planned further work (eg tests for lateral extensions or
depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is
not commercially sensitive.
5
• Further exploration programs will depend on the full
assessment and compilation of the VTEM and other
results
Share your feedback