DRILLING AT PLAYA KALI CONFIRMS PROSPECTIVITY
DRILLING COMMENCES AT LANTANA
• Reconnaissance Reverse Circulation (RC) drilling program successfully completed
at the Playa Kali Copper Project in Peru.
• Moderate to strong IOCG related alteration was intersected by drilling confirming
the presence of an iron-oxide copper-gold (IOCG) hydrothermal system(s).
• Copper sulphides (chalcopyrite) associated with broad zones of magnetite and
pyrite have been logged in the drill chips – Assays are expected by end of June.
• AusQuest’s maiden RC drilling program (+4000m) has now commenced at the
Lantana porphyry copper prospect to test a large-scale, high-grade porphyry
copper target.
• Drilling is expected to take ~4 weeks to complete with assays available up to four
weeks after completion of the drilling.
AusQuest Limited (“AusQuest” or the “Company”) (ASX: AQD) is pleased to advise that its
maiden Reverse Circulation (RC) drilling program (12 holes for 3,733m) has been successfully
completed at it’s 100%-owned Playa Kali Copper-Gold Project in Peru. The drill rig has now
moved to the Lantana Porphyry Copper Prospect to test a large-scale high grade porphyry
copper target defined by the Company’s earlier mapping and rock-chip sampling program.
Commenting on the ongoing and high-impact exploration program in Peru, AusQuest’s
Managing Director, Graeme Drew, said:
“We are pleased to have successfully completed the reconnaissance drilling program at our
Playa Kali IOCG prospect and look forward to reporting on results once they have been
received and assessed.
This is the first drilling program to ever be completed in this area with initial indications
suggesting that the extensive magnetic complexes (+8km) are caused by hydrothermal (iron)
alteration systems capable of producing copper (+/- gold) mineralisation.
“We are also very excited to have now commenced our maiden drill program at Lantana. This
is a large-scale porphyry copper target containing a multitude of high-grade copper samples
at surface which we believe have the potential to continue at depth. We look forward to
reporting on these results when they are available.”
Playa Kali Drilling
The maiden RC drilling program at Playa Kali (12 holes for a total of 3733m) was designed to
test a limited portion of the extensive (~8km) east-west trending magnetic complex that was
2
thought to reflect a new manto (iron oxide) target area for copper and gold mineralisation
similar to that found at the Mina Justa deposit ~100km to the north.
The wide spaced drilling (+200m), which targeted a range of geophysical, geological
(structural) and geochemical features at the eastern end of the Project, intersected a mixed
package of volcanics and sediments containing moderate to strong zones of disseminated
magnetite reflecting hydrothermal iron alteration within the sequence.
Figure 1: Playa Kali Project showing the extensive magnetic complex and drill hole locations at the
eastern end of the Project, plus the copper-bearing manto outcrops along the coast.
Strong to moderate development of actinolite, chlorite, epidote and K feldspar mineral
assemblages has been reported, supporting the interpretation of a hydrothermal iron alteration
system being present at Playa Kali.
Sulphides in the form of pyrite and chalcopyrite (see Table 1 below) are also present within the
iron alteration system suggesting potential for IOCG mineralisation nearby. Alteration vectors
suggest the main targets are more likely to occur peripheral to the magnetic bodies and
coincident with key structural intersections, highlighting the prospectivity of broader Playa Kali
east-west structural corridor.
Assay results are expected by the end of June at which time a full assessment of the prospect
will be completed and future work programs designed.
Lantana Drilling
Maiden RC drilling at the Company’s 100% owned Lantana Porphyry Copper Prospect has
commenced, comprising at least 10 drill-holes for a total of +4,000m. This program is designed
to test a large scale (~2,000m x 800m) porphyry target with widespread occurrence of highly
anomalous copper (often in excess of 1.0% Cu), molybdenum and bismuth values obtained
3
from earlier rock-chip sampling programs (Figure 2) (see Quarterly Reports – 31st March 2023,
30th June 2023, and 30th September 2023; ASX release 15th April 2026).
Geological mapping has identified large areas of advanced argillic alteration (AAA) within the
dominantly andesitic volcanic sequence, with the high-grade copper values occurring within
dyke-like features marginal to the mapped AAA (lithocap), highlighting the potential for a
nearby strongly mineralised porphyry system.
Figure 2: Lantana Prospect geology plan showing permitted drill pads and initial drill sections in relation
to highly anomalous surface copper samples (>1.0% Cu).
The initial drilling program is expected to take 3 to 4 weeks to complete with assays expected
to be available ~ 4 weeks after completion of drilling.
Graeme Drew
Managing Director Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of Mining
and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as a
Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in the report of
the matters based upon his information in the form and context in which it appears.
NO NEW INFORMATION
To the extent that this announcement contains references to prior exploration results which have been cross referenced to
previous market announcements made by the Company, unless explicitly stated, the Company confirms that it is not aware of
any new information or data that materially affects the information included in the relevant market announcements.
4
FORWARD-LOOKING STATEMENT
This report contains forward looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward looking statements as a
result of a variety of risks, uncertainties and other factors. Forward looking statements are based on management’s
beliefs, opinions and estimates as of the dates the forward looking statements are made and no obligation is
assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect
other future developments.
Table 1: Playa Kali RC Drilling - Visual Estimates of mineralisation within drill chips:
Drill-hole
From
(m)
To
(m)
Interval
(m)
Mineralisation
Modes
Oxide
Minerals
Oxide %
(Visual
estimate)
Sulphide
Minerals
Sulphide %
(Visual
Estimate)
PLKRC001 42 100 58
fractures,
micro veinlets
0.1% pyrite
34 36 2
micro veinlets
& veins
chalcopyrite 0.1%
PLKRC002 110 290 180
veins, veinlets
& fractures
pyrite 0.1 – 0.3%
70 82 12
veins, veinlets
& fractures
chalcopyrite 0.1%
PLKRC004 90 285 195
veins, veinlets
& fractures
pyrite 0.1- 0.5%
Including 236 240 4
veins, mini-
manto
chalcopyrite 0.5%
PLKRC005 60 165 105
veins, veinlets
& fractures
pyrite
PLKRC006 40 130 90
veins, veinlets
& fractures
pyrite 0.1-0.3%
PLKRC007 170 244 74
veins, veinlets
& fractures
pyrite 0.1%
Including 234 244 10 veins, veinlets chalcopyrite 0.1%
PLKRC009 134 149 15
veins, veinlets
& fractures
pyrite 0.1%
175 185 10 veins, veinlets
pyrite,
chalcopyrite
Pyrite 0.1%
Chalcopyrite
Tr -0.2%
PLKRC012 124 258 134
veins, veinlets
& fractures
pyrite 0.1 -0.5%
(Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or
substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations.)
1
JORC Code, 2012 Edition – Table 1 report, Reverse Circulation Drilling at Playa Kali
in Peru
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public Report.
• In cases where ‘industry standard’ work has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Samples are collected using a tube sampler by spearing
into each one metre sample bag and compositing samples
on a two-metre basis.
• Sample depths are determined by the length of the rod-
string and confirmed by counting the number of samples
and bags at the drill platform as per standard industry
practice.
• A ~4kg sample is collected for representivity.
Drilling techniques • Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
• RC Drilling with a face sampling bit will be used with a
hole diameter of approximately 132mm.
• Down-hole surveys are recorded at 10m intervals using a
down-hole gyroscope probe.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and results
assessed.
• Measures taken to maximise sample recovery and ensure representative nature of the
samples.
• Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
• Experienced RC drillers and an appropriate rig are used to
provide maximum sample recovery.
• The weight of every bulk 1 metre sample is recorded and
checked for sample recovery estimates.
• The sample weight of every laboratory sample is also
collected and weighed on site for future reference.
• At this early stage of exploration, it is not known if there
is a relationship between sample recovery and assay
grade.
2
Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant intersections logged.
• RC sample chips are collected into chip trays and are
stored for future reference.
• RC samples are logged on site during the drilling by
experienced geologists to identify key rock types and
mineralization styles.
• Sample logging is qualitative with visual estimates of
mineralization made for later comparison with assay
results.
• All one metre drill samples are logged.
Sub-sampling
techniques and
sample preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material being sampled.
• RC samples are collected every 1 metre into large plastic
bags and stored in rows per depth at the drill site.
• Samples are collected using a 50mm tube sampler and
composited on a two metre basis.
• Certified coarse blanks and fine standards are inserted
approximately every 35 samples and duplicates taken
every 20 samples for quality control purposes.
• The sample sizes are considered appropriate for the
geological materials sampled.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and
precision have been established.
• Assaying of the drill samples is by standard industry
practice.
• The samples are sorted, dried, crushed then split to obtain
a representative sub-sample which is then pulverized.
• A portion of the pulverized sample is digested using a
four acid digest (Hydrofluoric, Nitric, Hydrochloric and
Perchloric) which approximates a total digest for most
elements. Some refractory minerals are not completely
dissolved.
• Inductively Coupled Plasma Mass Spectroscopy (ICP-
MS) was used to measure Ag, Al, As, Ba, Be, Bi, Ca, Cd,
Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg,
Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr,
Ta, Te, Th, Ti Tl, U, V, W, Y, Zn, Zr,
• Au assays are provided by 30g fire assay with AA finish.
• Every 2 metre composite sample is also submitted for
Hyperspectral analysis using a TerraSpec instrument and
uploaded into the aiSIRISTM
software for mineral
identification and spectral output.
3
Criteria JORC Code explanation Commentary
• Assays are provided by ALS del Peru in Lima which is a
certified laboratory for mineral analyses. Analytical data
is transferred to the company via email.
• Data from the laboratory’s internal quality procedures
(standards, repeats and blanks) are provided to check data
quality.
• The Company collects duplicate samples on an
approximate 1: 20 basis, and inserts coarse blanks on a
1:30 basis and fine blanks on a 1:35 basis and fine
standards are inserted on a 1:35 basis.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No verification of intersections has been undertaken.
Drilling is still wide spaced and semi-reconnaissance in
nature.
• All primary sample data is recorded onto a printed sheet
on site and uploaded to a site laptop, all geological data is
recorded at the drill platform on a site laptop and
downloaded daily and onto an external backup.
• No adjustments are made to the assay data.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill hole collars including elevation are located by hand
held GPS to an accuracy of approximately 5m.
• All surface location data are in WGS 84 datum, UTM
zone 18S.
Data spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• RC drill-holes are sited as an initial test for mineralization
associated with magnetic and geological targets identified
by the Company.
• Samples are composited on a 2 metre basis.
Orientation of data
in relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
• Any bias due to the orientation of the drilling is unknown
at this early stage of exploration.
Sample security • The measures taken to ensure sample security. • Sample security is managed by the operator of the Project.
Procedures match with Industry best practice.
• Samples are collected into securely tied bags and placed
into cable-tied plastic bags for transport to the laboratory.
4
Criteria JORC Code explanation Commentary
Each sample batch has a sample submission sheet that
lists the sample numbers and the work required to be done
on each sample.
• Samples are transported to the laboratory by company
vehicle using trusted company personnel.
• Sample pulps (after assay) are held by the laboratory and
returned to the company after 90 days.
Audits or reviews • The results of any audits or reviews of sampling techniques and data. • No reviews or audits of the sampling techniques or data
have been carried out to date.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
• Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
• The Playa Kali project is located approximately 10km
east of the town of Chala in the southern Peru.
• The Playa Kali project comprises 6 granted mineral
concessions covering an area of ~33km². The tenements
are held by Questdor which is a 100% owned subsidiary
of AusQuest Limited.
There are no major heritage issues to prevent access to
the tenements during surface exploration activities.
Permits to drill from 20 platforms have been received.
Exploration done
by other parties
• Acknowledgment and appraisal of exploration by other parties. • No public reporting of exploration data is required in
Peru. No historic data available.
Geology • Deposit type, geological setting and style of mineralisation. • The Playa Kali Project is targeting manto-style IOCG
deposits along the coastal belt of southern Peru. These
are large scale disseminated copper (and gold) deposits
found within orogenic belts that surround the Pacific
Rim. The deposits can be areally large requiring
significant drilling to evaluate.
Drill hole
Information
• A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
• Relevant drill hole location data and information are
provided in the table below.
5
Criteria JORC Code explanation Commentary
hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Data aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values should be clearly
stated.
• No assay results reported
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly important in the reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).
• No assay results reported.
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
• All proposed drill holes are shown on the appropriate
plan and included in the ASX release.
Balanced reporting • Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
• No assay results reported
Other substantive
exploration data
• Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics; potential deleterious
or contaminating substances.
• The targets selected for drilling were defined by
geological mapping, sampling and ground magnetic
surveys. The presence of outcropping mantos (Fe-rich)
and/or skarns supports the prospectivity of the area. Grid
based sampling was used to provide unbiased sampling
for lithological and alteration mapping.
Further work • The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
• Further exploration including drilling will depend on the
results of this maiden drilling program.
6
Drill-Hole Details
Hole ID Datum Zone Easting Northing Elevation (m) Depth (m) Azimuth Inclination
PLKRC001 WGS84 18S 587902 8243149 104 300 0 -70
PLKRC002 WGS84 18S 587721 8243240 109 306 270 -60
PLKRC003 WGS84 18S 588238 8243294 112 318 270 -60
PLKRC004 WGS84 18S 588579 8243417 129 285 180 -60
PLKRC005 WGS84 18S 588848 8243319 129 342 180 -60
PLKRC006 WGS84 18S 589595 8243603 165 258 180 -70
PLKRC007 WGS84 18S 589895 8244395 183 256 180 -70
PLKRC008 WGS84 18S 589901 8244196 177 330 180 -60
PLKRC009 WGS84 18S 589901 8243993 172 360 180 -60
PLKRC010 WGS84 18S 589940 8243815 168 350 180 -60
PLKRC011 WGS84 18S 590299 8244043 180 310 180 -60
PLKRC012 WGS84 18S 588865 8243458 136 318 0 -60