Drilling Commences at Mt Davis
Released
Released
Announcement PDF
JOIN AUSQUEST’S INTERACTIVE INVESTOR HUB.
Visit AUSQUEST.COM.AU for AusQuest’s interactive Investor Hub
AusQuest Limited ABN 35 091 542 451 | 8 Kearns Crescent Ardross WA 6153
Visit Investor Hub for a video update. October 13th, 2025
DRILLING COMMENCES TO TEST LARGE VTEM TARGETS
AT MT DAVIS BASE METAL PROJECT, WA
• Copper-lead-zinc potential identified at Mt Davis to be drill-tested under the SAA.
• RC drilling program designed to test large-scale EM and geochemical anomalies.
AusQuest Limited (“AusQuest” or the “Company”) (ASX: AQD) is pleased to advise that it
has commenced a program of Reverse Circulation (RC) drilling at its Mt Davis Base Metal
Project, located on the northern side of the Earaheedy Basin in Western Australia.
An RC drilling program comprising 10 drill-holes (~2,000m) spaced at 200m intervals along
traverses 400m apart has been designed to test the source of an electromagnetic (VTEM)
anomaly and associated anomalous soil geochemical responses (Figure 1). The drilling
should take 2-3 weeks to complete with assay data expected within 4-6 weeks of completion
of drilling.
Exploration at the Mt Davis Project is targeting sediment-hosted copper, lead, and zinc
deposits similar to those found in north-west Queensland. The RC drilling program has been
designed as a first step in evaluating several VTEM targets that are thought to reflect priority
base metal environments. The project is subject to the Strategic Alliance Agreement (SAA)
with a wholly-owned subsidiary of South32 Ltd (South32).
Figure 1: Mt Davis: Late Time VTEM Image showing soil anomalies and proposed RC drilling.
2
The VTEM anomalies are thought to be caused by conductive sediments occurring in a
similar stratigraphic position to the lead, zinc (+/- copper) mineralisation (ie below the Frere
Iron Formation) discovered by Rumble Resources Ltd at the Chinook Prospect, on the
southern side of the Basin.
Computer modelling suggests the conductors have a low conductivity (~100 siemens), are
relatively thick (~40m) as defined by an upper and lower conductive plate, and dip shallowly
to the north (~15°).
Multi-element soil geochemical anomalies including lead, molybdenum, bismuth – as well as
other elevated pathfinder elements such as thallium and germanium – coincide with
stratigraphy containing the VTEM targets, suggesting that the sediments may be prospective
for base metals.
The VTEM targets are large-scale (1,000m x 500m) but discrete and are laterally constrained
by regional faulting (as defined by the detailed aeromagnetic data), which may be
instrumental in the formation of restricted sub-basins within the Earaheedy Basin where base
metal accumulations are more likely to occur (Figure 2).
AusQuest’s Managing Director, Graeme Drew, said the Company was pleased to be once
again drilling potentially large-scale base metal targets in WA, now that heritage clearance
has been obtained at Mt Davis.
“The soil sampling and VTEM anomalies provide a strong focus for drilling in an area where
very little effective exploration has been carried out to date. We are looking forward to
reporting on the progress of drilling at Mt Davis once the program gets underway,” he said
Graeme Drew
Managing Director Visit Investor Hub for further updates
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration results are based upon information compiled by Mr
Graeme Drew, a full-time employee of AusQuest Limited. Mr Drew is a Fellow of the Australasian Institute of
Mining and Metallurgy (AUSIMM) and has sufficient experience in the activity which he is undertaking to qualify as
a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Drew consents to the inclusion in
the report of the matters based upon his information in the form and context in which it appears.
FORWARD-LOOKING STATEMENT
This report contains forward-looking statements concerning the projects owned by AusQuest Limited. Statements
concerning mining reserves and resources may also be deemed to be forward-looking statements in that they
involve estimates based on specific assumptions. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward-looking statements as a
result of a variety of risks, uncertainties and other factors. Forward-looking statements are based on
management’s beliefs, opinions and estimates as of the dates the forward-looking statements are made and no
obligation is assumed to update forward-looking statements if these beliefs, opinions and estimates should
change or to reflect other future developments.
3
Figure 2: Mt Davis late time VTEM image (top) showing potential sub-basins and Magnetic 1VD image
(bottom) showing structures and EM targets stratigraphically below the inferred Frere Iron Formation.
1
JORC Code, 2012 Edition – Table 1 report, Reverse Circulation Drilling at the Mt
Davis Project October 2025
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
• Reverse circulation percussion (RC) drilling is being used to obtain
a representative 2 metre samples from a static cone splitter
approximately 2.5-3.5kg in weight
• The reject sample is placed on the ground in 1 metre intervals
• All 2m samples are being submitted for multielement analysis to
Intertek Perth using 4 Acid ICP MS analysis. Au analysis, (if
completed) will be by 50g fire assay.
• Sample depths are determined from the drill rods and
corresponding sample piles
• The ~3kg (2m) composite sample is considered to be appropriate
for the targeted commodity and mineralisation style.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• RC Drilling with a face sampling bit is being used with a hole
diameter of approximately 132mm.
• Down-hole surveys will not be routinely completed given the wide
spaced drilling and the early-stage of exploration. Downhole
surveys may be completed at a later date if holes remain open.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• An appropriate drilling rig configuration with booster and auxiliary
compressor is being used to obtain good sample recovery and keep
out the water.
• Sample condition (water content) and sample size is being recorded
for every sample.
• At this early stage of exploration, it is not known if there is a
2
Criteria JORC Code explanation Commentary
relationship between sample recovery and assay grade.
Logging • Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• RC sample chips are qualitatively logged to identify key rock types
and alteration styles.
• Some quantitative logging is completed by estimating the
approximate abundance of certain minerals.
• All samples are logged.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-
half sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• RC samples are collected every metre and presented in rows
corresponding to sample depth.
• Assay samples are collected from a static cone splitter and
composited at 2m intervals to produce a representative sample for
analysis.
• A certified standard is inserted every 40th
sample for initial quality
control purposes. The standards were selected based on the
expected mineralisation style.
• The sample sizes are considered appropriate for the geological
materials sampled.
• Targeted duplicate samples will be collected over suspected
anomalous zones.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
• Geochemical analysis of the drill samples is considered standard
industry practice for the targeted mineralisation style.
• The samples are sorted and dried. The whole sample is pulverised
to 80% passing at 75micron. A 200g pulp sample is extracted from
the homogenised material
• A 10g portion of the pulverized sample is then digested and
refluxed using a four-acid digest (Hydrofluoric, Nitric,
Hydrochloric and Perchloric) which approximates a total digest for
most elements. Some refractory minerals are not completely
dissolved.
• Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) is used
to measure Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe,
Ga, Ge, Hf, In, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S,
Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn, and Zr.
• Data from the laboratory’s internal quality procedures (standards,
repeats and blanks) and AusQuest (standards) are reviewed to
check data quality.
• Assays are provided by Intertek 311 Kenwick Rd Maddington, WA
3
Criteria JORC Code explanation Commentary
which is a certified laboratory for mineral analyses.
• Analytical data is transferred to the company via email and stored
within the companies database.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No assay data are reported in this release.
• This is part of the initial stage of exploration, no twinned holes
have been completed.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill hole collars are located by hand held GPS to an accuracy of
approximately 3m.
• No down hole surveys will be carried out for this program due to
the early stage of exploration. Drill-hole inclination will be
measured at 0m using the drill mast and a clinometer. Azimuth
measured along drill rig edge using sunnto compass. Both accurate
to approximately 0.5 degrees.
• All surface location data are in GDA 94 datum, zone 51S.
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Drill holes inclined at 60° were spaced at approximately 200m
intervals along lines 400m apart to provide geochemical data across
the target area to assess the prospectivity of the prospect.
• Drill hole locations are provided in the table below.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Any bias due to the orientation of the drilling is unknown at this
early stage of exploration.
Sample security • The measures taken to ensure sample security. • Samples are collected into securely tied bags and placed into cable-
tied bags for transport to the laboratory. Each sample batch has a
sample submission sheet that lists the sample numbers and the
work required to be done on each sample.
• Reputable freight companies are used to transport samples to the
laboratory.
• Sample pulps (after assay) are held by the laboratory and returned
to the company after 90 days.
4
Criteria JORC Code explanation Commentary
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • No reviews or audits of the sampling techniques or data have been
carried out to date.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area
• The Mt Davis Project is centred at 7218000N and 316700E (GDA94
Zone 51), approximately 180 km NE of Wiluna in Western Australia.
• Tenement holdings include one granted Exploration License (E69/3896)
and one EL application (E69/4282).
• Aboriginal heritage surveys are routinely completed ahead of ground
disturbing activities. Soil sample programs are conducted with monitors
from the traditional owners.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. • Numerous diamond and several uranium explorers have worked in the
general area of the Mt Davis Project but generated very little data
relevant to the current base metal project.
• A total of 4 RC drill-holes targeting Ni and Cu drilled by BHP Minerals
Pty Ltd within mafic intrusions are located within the project area in
1998. BHP also conducted isolated surface sampling (soil, stream and
lag) during this period.
• The tenements have been covered by regional government geophysical
and geological surveys.
Geology • Deposit type, geological setting and style of mineralisation. • Exploration within the Mt Davis Project is targeting sediment hosted
Cu-Pb-Zn mineralization within Earaheedy Basin sediments.
Interpretation of geophysical data suggests prospective sediments, as
found on the southern side of the basin below the Frere Iron Formation,
could be present at Mt Davis.
Drill hole
Information
• A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
• Relevant drill hole data are tabulated below and provided in the ASX
release.
• No drilling results are reported in this release.
5
Criteria JORC Code explanation Commentary
o hole length.
• If the exclusion of this information is justified on the basis that the information
is not Material and this exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain why this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation
should be stated and some typical examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• No assay results are reported in this announcement.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there should be
a clear statement to this effect (eg ‘down hole length, true width not known’).
• No assay results are reported in this announcement.
Diagrams • Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
• Drill holes are shown on appropriate plans and included in the ASX
release. Planned drill-hole locations are provided in the table below.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
• No assay results are reported in this announcement.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminating substances.
• The relationship between current RC drill coverage and previously
reported exploration data is presented in the report.
Further work • The nature and scale of planned further work (eg tests for lateral extensions or
depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Further drilling will depend on the assessment of assay results from this
drilling program, when available
6
Reverse Circulation Planned drill-hole locations
Drill-Hole Easting Northing Elev (m) Drill Depth (m) Azimuth Inclination
A 323400 7210350 580 150 180 -60
B 323400 7210550 580 200 180 -60
C 323400 7210750 580 200 180 -60
D 323400 7210950 580 200 180 -60
E 323400 7211150 580 200 180 -60
F 323822 7210490 580 200 180 -60
G 323800 7210650 580 200 180 -60
H 323800 7210850 580 200 180 -60
I 323800 7211050 580 200 180 -60
J 323800 7211250 580 200 180 -60
Share your feedback
Discover